Responds to 830513 Telcon Request for Addl Info Re 820625 Submittal Concerning Fire Protection.List of Fuses Planned to Be Removed for Fires & Photographs of Fuse Installation Encl
ML20077D570
Person / Time
Site: Pilgrim
Issue date: 07/22/1983
From: Harrington W
BOSTON EDISON CO.
To: Vassallo D
Office of Nuclear Reactor Regulation
References
83-194, NUDOCS 8307260571
Download: ML20077D570 (4)


Text

--

-1

. SOSTON EDISON COMPANY B00 GovLSTcN STREET WOSTONe MASSACHUSETTS O2199 WILLIAM O. MARAINGTON sznesewees pesoament July 22, 1983 BEco Letter No.83-194 Mr. Domenic B. Vassallo, Chief Operating Reactors Branch #2 Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555 License No. DPR-35 Docket No. 50-293

Subject:

Response to Request for Additional Information on 10CFR50, Appendix

'R Submittal

Dear Sir:

In a telephone conversation on May 13, 1983, Mr. K.T. Eccleston of your office requested additional information to support our 10CFR50, Appendix R submittal that was transmitted by letter from Mr. A.V. Morisi, BECo, to yourself, dated June'25, 1982 (BECo Letter No.82-180).

In particular, Mr. Eccleston requested a complete list of all fuses that are planned to be removed should a fire occur in any of the fire zones at Pilgrim Nuclear Power Station.

These fuses would be-removed during certain fires to prevent spurious operation of plant components due to the effect of the fire on their control cables. A list of all fuses planned to be removed for fires at Pilgrim is provided as Attachment A.

It should be noted that fuses will be removed only for a fire in either the cable spreading room (Fire Zone 3.2) or the control room (Fire Zone 3.1).

The'information presented in Attachment A represents a change from that provided in our Appendix R submittal of June.25,1982. ' The appropriate revisions to the recommended procedures in Section 3 of the Appendix R submittal will be made l

upon NRC approval and subsequent implementation by Boston Edison. The appropriate revisions to the implemented procedures in Section 7 of the Appendix R submittal

.will be made by September 30, 1983.

In addition to the information provided in Attachment A, Mr. Eccleston requested l

photographs to show the accessibility and identification of the fuses to be removed. Because all of the fuse installations listed in Attachment A are identi-

- cal, the -requested photographs are provided in Attachment B for one typical fuse installation.

Depending on the particular_ fuse-application, some fuses in trip circuits have been replaced with. solid links to ensure the trip function (see Attachment B, Photo #2).- When directed to remove trip fuses, these solid links would be treated l

~ in the same manner as trip fuses.

h@h l

m

~PDRADOC{1 2h3 83072605 0

((

PDR F

1 BOSTON EolsaM COMPANY i

Mr. Domenic B. Yassallo, Chief l

Page 2 Please do not hesitate to contact us if we can be of any further assistance.

Very truly yours,

$M l

DMV/ mat Attachments:

A) List of All Fuses Planned to be Removed for Fires at Pilgrim Nuclear Power Station.

B) Photographs of a Fuse Installation Typical of Those Listed in Attachment A.

i f

l

__.--w-,_

e.,, -___-. -

Attachment A 1

List of All Fuses Planned to be Removed for Fires at Pilgrim Nuclear Power Station I

i FIRE ZONE (Note 1)

FUSE LOCATION AFFECTED COMPONENT PROCEDURE 3.2 Cable Spreading Room 480 V Load Center B1, BKR 52-102-480 V Load Center B6 Note 2 or 480 Y Load Center B1, BKR 52-105 480 V MCC B29 Note 2

~

3.1 Control Room 480 V Load Center B1, BKR 52-106 Turbine Building Closed Note 2 Cooling Water Pump P-110A 480 V Load Center B2, BKR 52-202 480 V Load Center B6 Note 2 480 V Load Center B2, BKR 52-203.

480 V MCC B28 Note 2 3

480.V Load Center B2, BKR 52-206 Turbine Building Closed Note 2 Cooling Water Pump P-1108 i

Notes 1.

The fire zone listed is the location.of the postulated fire.

1 i

2.

Procedure:

If the breaker has tripped:

(a) Open cubicle door

}

(b) Remove TRIP and CLOSE fuses on the right hand side of the breaker cubicle l

i i

If the breaker is closed:

(a) Open the cubicle door 4

(b) Remove TRIP and CLOSE fuses on the right hand side of the breaker cubicle (c) Trip the breaker mechanically 1

l i

i i

5

~_-._.

e s 7

f.

i t

. a..

a.

!,'i m.

1 I

,,2) ll

\\

M j-i 7

, l..

9, ff11 l:'i

.)

=.

. ; c '. a

'E,t-l

~

p h

~

\\

Photo #1 Photo #2 i

~, ffc l

I!b!

l eI 6

Photographs of Fuse Installation

..m y ;

Typical of Those Listed in Attachment A e

d.

?

,i

}1 Pho to # 3 NOTES:

1.

Photo #1 is a photograph of the breaker cubicle with the door opened.

The " Trip" and "Close" fuses are in the upper right hand corner.

2.

Photo #2 shows the identification for the " Trip" fuses.

l l

3.

Photo #3 shows the identification for the "Close" fuses.

4 The " Trip" and "Close" fuses are clearly identified in all breaker cubicles.