. SOSTON EDISON COMPANY B00 GovLSTcN STREET WOSTONe MASSACHUSETTS O2199 WILLIAM O. MARAINGTON sznesewees pesoament July 22, 1983 BEco Letter No.83-194 Mr. Domenic B. Vassallo, Chief Operating Reactors Branch #2 Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555 License No. DPR-35 Docket No. 50-293
Subject:
Response to Request for Additional Information on 10CFR50, Appendix
'R Submittal
Dear Sir:
In a telephone conversation on May 13, 1983, Mr. K.T. Eccleston of your office requested additional information to support our 10CFR50, Appendix R submittal that was transmitted by letter from Mr. A.V. Morisi, BECo, to yourself, dated June'25, 1982 (BECo Letter No.82-180).
In particular, Mr. Eccleston requested a complete list of all fuses that are planned to be removed should a fire occur in any of the fire zones at Pilgrim Nuclear Power Station.
These fuses would be-removed during certain fires to prevent spurious operation of plant components due to the effect of the fire on their control cables. A list of all fuses planned to be removed for fires at Pilgrim is provided as Attachment A.
It should be noted that fuses will be removed only for a fire in either the cable spreading room (Fire Zone 3.2) or the control room (Fire Zone 3.1).
The'information presented in Attachment A represents a change from that provided in our Appendix R submittal of June.25,1982. ' The appropriate revisions to the recommended procedures in Section 3 of the Appendix R submittal will be made l
upon NRC approval and subsequent implementation by Boston Edison. The appropriate revisions to the implemented procedures in Section 7 of the Appendix R submittal
.will be made by September 30, 1983.
In addition to the information provided in Attachment A, Mr. Eccleston requested l
photographs to show the accessibility and identification of the fuses to be removed. Because all of the fuse installations listed in Attachment A are identi-
- cal, the -requested photographs are provided in Attachment B for one typical fuse installation.
Depending on the particular_ fuse-application, some fuses in trip circuits have been replaced with. solid links to ensure the trip function (see Attachment B, Photo #2).- When directed to remove trip fuses, these solid links would be treated l
~ in the same manner as trip fuses.
h@h l
m
~PDRADOC{1 2h3 83072605 0
((
PDR F
1 BOSTON EolsaM COMPANY i
Mr. Domenic B. Yassallo, Chief l
Page 2 Please do not hesitate to contact us if we can be of any further assistance.
Very truly yours,
$M l
DMV/ mat Attachments:
A) List of All Fuses Planned to be Removed for Fires at Pilgrim Nuclear Power Station.
B) Photographs of a Fuse Installation Typical of Those Listed in Attachment A.
i f
l
__.--w-,_
- e.,, -___-. -
Attachment A 1
List of All Fuses Planned to be Removed for Fires at Pilgrim Nuclear Power Station I
i FIRE ZONE (Note 1)
FUSE LOCATION AFFECTED COMPONENT PROCEDURE 3.2 Cable Spreading Room 480 V Load Center B1, BKR 52-102-480 V Load Center B6 Note 2 or 480 Y Load Center B1, BKR 52-105 480 V MCC B29 Note 2
~
3.1 Control Room 480 V Load Center B1, BKR 52-106 Turbine Building Closed Note 2 Cooling Water Pump P-110A 480 V Load Center B2, BKR 52-202 480 V Load Center B6 Note 2 480 V Load Center B2, BKR 52-203.
480 V MCC B28 Note 2 3
480.V Load Center B2, BKR 52-206 Turbine Building Closed Note 2 Cooling Water Pump P-1108 i
Notes 1.
The fire zone listed is the location.of the postulated fire.
1 i
2.
Procedure:
If the breaker has tripped:
(a) Open cubicle door
}
(b) Remove TRIP and CLOSE fuses on the right hand side of the breaker cubicle l
i i
If the breaker is closed:
(a) Open the cubicle door 4
(b) Remove TRIP and CLOSE fuses on the right hand side of the breaker cubicle (c) Trip the breaker mechanically 1
l i
i i
5
~_-._.
e s 7
f.
i t
. a..
a.
!,'i m.
1 I
,,2) ll
\\
M j-i 7
, l..
9, ff11 l:'i
.)
=.
. ; c '. a
'E,t-l
~
p h
~
\\
Photo #1 Photo #2 i
~, ffc l
I!b!
l eI 6
Photographs of Fuse Installation
..m y ;
Typical of Those Listed in Attachment A e
d.
?
,i
}1 Pho to # 3 NOTES:
1.
Photo #1 is a photograph of the breaker cubicle with the door opened.
The " Trip" and "Close" fuses are in the upper right hand corner.
2.
Photo #2 shows the identification for the " Trip" fuses.
l l
3.
Photo #3 shows the identification for the "Close" fuses.
4 The " Trip" and "Close" fuses are clearly identified in all breaker cubicles.