ML20077D535

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept,Item M-13 Re Svc Water Pump Mod. Initially Reported on 790810.Reinstallation of Repaired Equipment Will Be Performed by Hj Kaiser Co by Jan 1984. Next Rept by 840215
ML20077D535
Person / Time
Site: Zimmer
Issue date: 07/18/1983
From: Williams J
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, LOZ-83-0085, LOZ-83-85, NUDOCS 8307260550
Download: ML20077D535 (2)


Text

r F'

N' lll n :- w ~W THE CINCINNATI GAS & ELECTRIC COMPANY sdf CINCINN ATI. OHIO 4520i July 18, 1983 LOZ-83-0085 j

s. wituru s. sn

$ENsom vtCE PREsioENT NUCLEAR OPERATIONS Docket No. 50-358 U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention:

Mr. J.G. Keppler Regional Administrator Gentlemen:

RE:

WM. H. ZIMMER NUCLEAR POWER STATION - UNIT 1 10CFR50. 55 (e), ITEM M SERVICE WATER PUMP MODIFICATION W.O.

57300, JOB E-5590, FILE NO. 956C, M-13 This letter constitutes an interim report concerning the subject condition initially reported to the Commission on August 10, 1979 as a potentially reportable deficiency under the requirements of 10CFR50.55 (e).

Since our last report, LOZ-83-0008, dated March 24, 1983, all repaired equipment has been returned from the manufacturer and receipt inspection has been performed by Operations Quality Assurance.

By letter, EAB-SOL-ll, dated January 7, 1983, CG&E requested the NRC's concurrence'in the performance of certain work activities which were believed to be allowed under the NRC November 12, 1982. " Order to Show cause and O'rder Immediately Suspending Construction".

One of those requests was to perform Service Water Pump modifications.

The NRC letter in response dated May 6,1983, Item A (8) (a), concurred that the Service Water System modifications are not construction activities suspended by the NRC order.

The H. J. Kaiser Company has been requested to perform the reinstallation, the piping and electrical interfaces, and the rotational alignment for the remaining refurbished pump.

The anticipated completion of Service Water Pump modification items is January 1984.

A follow-up report will be submitted by February 15, 1984.

JUL 2 2 M F307260550 830718 DR ADOCK 05000

]

Mr. J.G.

Keppler Regional Administrator July 18, 1983 LOZ-83-0085 Page 2 We trust the above will be found acceptable as an interim report under 10CFR50.55 (e).

Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY By gg ::: :-

WILLIAMS, J SENIOR VICE P SIDENT DJS/sfr cc:

NRC Office of Inspection & Enforcement Washington, D.C.

20555 NRC Senior Resident Inspector ATTN:

W.F. Christianson NRC Zimmer Project Inspector, Region III ATTN:

E. R. Schweibinz