Suppls 830503 Commitment to Implement Expanded Cooling Pond Dike Surveillance Program.Damaged Turf on Dike Will Be Repaired within 1 Month After Detection Consistent W/Insp Program
ML20077D246
Person / Time
Site: Midland
Issue date: 07/18/1983
From: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Harold Denton
Office of Nuclear Reactor Regulation
References
23859, NUDOCS 8307260451
Download: ML20077D246 (2)


Text

-

l.

..e s

t Consumers Power James W Cesk Company va r,,,is. - r,.i...

s

.,an,

n.d co.,tructio.

oeneral offices: 1945 Not Pernell Road, Jackson, MI 49201 e (517) 78&O453 July 18, 1983 Harold R Denton, Director Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission Washington,,DC 20555 MIDLAND ENERGY CENTER MIDLAND DOCKET NOS 50-329, 50-330 4

COOLING POND DIKE SLOPE EROSION PROTECTION AND DIKE SURVEILLANCE PROGRAM

(

FILE: 0485.16.7, 0485.11, B2.5'.6 SERIAL: 23859

REFERENCE:

JWC00K LETTER TO HRDENTON SERIAL 20453 DATED MAY 3, 1983 This correspondence will supplements the commitment to implement an expanded cooling pond dike surveillance program as discussed in the above referenced letter of May 3, 1983. This surveillance program includes a commitment for visual inspections of the grass on the outside slope of the. cooling pond dike.

Although Consumers Power Company committed to repairing damaged areas of l

grass, the Company did not specifically indicate a time limit for such repairs. Therefore, Consumers Power Company commits to repairing of damaged turf on the cooling pond dike within a month after detecting such damaged areas consistent with the inspection program specified in the previous letter.

This supplemental information should. enable the_NRC Staff to complete its review of Confirmatory Issue #1.

I l

JWC/MFC/bjb CC RJCook, Midland Resident Inspector JGKeppler, Administrator, NRC Region III 8307260451 830718 PDR ADOCK 05000329 g

PDR

\\

Y oc0783-0514a100 g

r CONSUMERS POWER COMPANY Midland Units 1 and 2 Docket No 50-329, 50-330 Letter Serial 23859 Dated July 18, 1983 At the request of the Commission and pursuant to the Atomic Energy Act of 1954, and the Energy Reorganization Act of 1974, as amended and the Commission's Rules and Regulations thereunder, Consumers Power Company submits information on the time limit for initiating repairs to damaged turf on the outside slope of cooling pond dike.

CONSUMERS POWER COMPANY By W CoM, Vice' President Proj cts, Engineering and Construction Sworn'and subscribed before me this [ day of M /9/_f.

'/