h CENYGRIOR ENERGY Donald C. Shelton M Mdwn Avenue Voe Presdent N4 ear Toledo, OH 43052WJ1 (un Ben,e (419)249 2330 1
Docket Number 50-346 License Number NpF-3 Serial Number 1930 May 16, 1991 United States Nucicar Regulatory Commission Document Control Desk Vashington, D. C.
20555
Subject:
Nuclear Regulatory Commission Staff Action for Seventh Refueling Outage Gentlemen The Davis-Besse Nuclear power Station, Unit Number 1 (DBNpS) is presently scheduled to commence its seventh refueling outage (7RFO) nn September 1, 1991.
Modifications, inspections and tests are planned in addition to the refueling activities, which necessitate the amendment of certain Operating License, Appendix A, Technical Specifications and the Nuclear Regulatory Commission's (NRC's) approval of Non-Operating License (N-OL) requests.
The purpose of this letter is to alert the NRC Staff as to the amendments and approvals necessary in supporting the 7RFO.
To avoid an adverse impact on scheduled activities, Toledo Edison requests that the NRC Staff allocate the necessary resources to provide timely support for the review and issuance of these DBNPS license amendments and N-OL approvals.
Toledo Edison has reviewed its submitted and planned-to-be submitted License Amendment Requests (LARs). Amendment requests for the 7RF0 have been placed into one of two categories: A) " Required" Technical Specification amendments for the 7RF0, and B) " Desired" Technical Specification amendments for the 7RFO.
Attachments 1 through 2 identify the specific Technical Specification amendment requests within these categories.
Categories A (required amendments) and B (desired amendments) each provide a brief description of the change, the Technical Specification section affected and the planned or actual submittal date.
At present, Toledo Edison has identified two Category A (required) amendments.
These two amendments are in support of the refueling activities.
As previously discussed with the NRC Staff. Toledo Edison requests that the NRC Staff approve Toledo Edison's request (LAR 91-0011) to amend Technical Specification 5.3.1, Fuel Assemblies, prior to the 7RF0 to avoid the necessity of an exigtnt or emergency Technical Specification amendment.
9105230072 916516 FDR ADOCK 0%00346 P
PDR nk Om r na cowxs
'f c u oraEe i<4 navg 4
L kie30 ide,on
Docket Number 50-346 License Number NPF-3 Serial Number 1930 Pagt: 2 Six Category B (desired) amendments have been identified. Category B contains those amendments related to the 7RF0 for which issuance is desirable from the standpoint of minimizing radiological exposure, reducing outage duration, or improving plant operation.
For example, one amendment request (LAR 90-0049), when approved, vill allow for the elimination of potential radiological exposure resulting from unnecessary repairs due to an I
overly restrictive leakage criterion. The Category A and B amendment requests which are presently under Toledo Edison preparation are tentatively planned to be submitted to the NRC by the dates shovn in the attachments. identifies non-operating License approval requests for which Toledo Edison requests NRC action. The first request (Toledo Edison letter Ser.lal Number 1728) submitted in December, 1989, concerne the approval of an exemption request to allov use of a full-face respirator in lieu of a self contained breathing apparatus.
Similar exemptions have been previously approved for other plants. Toledo Edison plans to submit additional information requested by the NRC Staff by May 31, 1991.
The second request (Toledo Edison letter Serial Number 1916), was submitted on April 19, 1991 ard concerns Toledo Edison's plans for installation of a Safety Features Actuation System (SFAS) Shutdown Bypass for Operational Hodes 5 and 6.
This modification is designed to eliminate unnecessary SFAS actuations similar to those which have occurred during past refueling outages.
The third request concerns NRC approval of the initial post-refueling startup, if Toledo Edison reconstitutes any fuel assemblies during-the 7RFO.
This approval is linked to the NRC's approval of Toledo Edison's request (LAR 91-0011) to amend Technical Specification 5.3.1.
The fourth, fifth and sixth requests concern NRC approval of ASME Boiler and Pressure Vessel Code Section XI relief requeste for use during the 7RFO.
Toledo Edison believes.it has identified the Technical Specification amendments and N-OL approvals necessary for the 7RFO.
However, additional items may be identified as the 7RF0 approaches and as activities during the outage are completed.
Shoula additional amendments or N-OLs be identified, they vill be prepared and submitted as expeditiously as practical.
9 r
- yours, h
DRV/ach l
Attachments cc P. H. Byron, NRC Region III, DB-1 NRC Senior Resident Inspector A. B. Davis, Regional Administrator, NRC Region III J. B. Hopkins, NRC/NRR DB-1 Senior Project. Manager J. N. Hannon, Director, NRC Project Directorate III-3 Utility Radiological Safety Board
w n
n D
E T
CE 0
1 F
1 2
9 F
/
S A 3
0 s
4 T
N 5
2 e 1
O s
/
I S
S e 5
T T
T S 0
C ES LATT I.
w 1
1 9
9 wE
/
/
T 2
0 D A 2
3 E D
/
/
N 5
4 N
0 6
A LF
)
ST a
(
N d
O d
)
I L
e6 e
T A
t 2 t
A T
t 9 t
C O T E a 1 i
I F I T e
m F R M A b l b
A I 7 B C u a u
C.
U S i s
T F R S
r
~
R F O t e t
O S F o S o
N G
N
(
E L S.
T A F A C G C I N N A H R nl f
C C o a o
E i v T
t o t
p m l
D i e u
E r R s
R c
e I
s r P
- a U
N e o Q
O D
a E
I t
g R
T s n s
P e e a
I i m R
l e s
C b c e
S m a s
E e l a
D s p B
s e E
A R d t G
n r N
l l a o A
e a p
H u u S e C
F r T R e o e d s t s a i
i e v e v l e u e e R D R R 1
0 1
A 0
B 4
0 T
R J
1 1
I 9
9 l
l i
i O
a a
N v
v A
A CA o
o T
N N
- 4 i
I h1i!,
Ij$11!a i q4,
- i i j iii )i 11 I
4!!i .dIi1 <i ll9!a1. 4, 1 Ik+ 1.i e 4
1 l' l l e i t CATEGORY B l' DESIRED TECHNICAL SPECIFICATION t CRA%ES FOR 7RFC i SUB".ITTAL PLANNED SL*SMITTAL TECE SPEC TAC No. LAP Mo. CHANGE DESCRIPTION DATE DATE SECTION AFTECTED 79672 90-00$0 Battery Testing After Service or 03/01/91 Submitted 4.8.2.3.2 Forformance Tests (Serial 1893) I i 79962 91-0001 Snubber Visual Inspection Inte rvals 03/01/91 Submatted 3.7.7, and Corrective Actions (Serial 1904) 4.7.7 I 79701 90-0046 Revise STRCS Mainsteam Low Pressure 12/03/90 Submitted 3.3.2.2 5 Block Fermit and Reset (Serial 1875) 4.3.2.2 12/19/90 T3.3-1L (Serial 1885) f No Avail 90-0044 Increase containment Bypass 03/01/91 Subettted 3.6.1.2 i Leakage Allowable from 0.015 La (Serial 1940) 4.6.1.2E to 0.030 La i 75518 89-0011 Revise API /RP1 value and 02/0L/90 Submitted 3.1.3.3 Administrative Clarifications (Serial 1750) 4.1.3.3 1' No Avail 91-0006 Revise STAS and ECCS DR11 and DH12 Not Submitted 05/22/91 3.3.2.1 f. Interlocks (Serial 1918) Table 3.3-3
- able 4.3-2 1-k l
i [ I-05/14/91
DAVIS-BESSE NUCIIAR P07ER STATION SEVENTH REFUELING OITTAGE NRC APPROVALS TE SUBMITTAL DATE NRC PISPONSE SERIAL NO. NRC RESPONSE LOG NO. ITEM DESCRIPTION-DATE PIQUESTED BY DATE STATUS 1 10CFR Part 20, Appendix A 1728 08/01/91 None MRC has Exes;ption to allov Respirator 12/05/89 requested additional in lieu of Self Contained information. Breathing Apparatus (TAC 75234) 2 Installation of SFAS 1916 06/19/91. None Submitted Shutdown. Bypass 04/19/91 to NRC. 3 Approval of Fuel Assembly 10/16/91 Approval pend-Changes (Projected) ing TE sub-mittal during 7RF0 l 1936 08/01/91 None In TE reviev/ 4 Proposed Alternative to ASME. 05/22/91 approval B&PV Code Section II As Found Requirements for Pressurizer (Projected) routing. Code Safety Relief Valves 5 Second Ten-Tear Interval 1838 09/01/91 None Program is Pump and Valve Testing 08/28/90 under NRC review. Program for the DBNPS - Interim Approval of Relief Requests 6 Second Ten-Year Interval 1846 09/01/91 None Program is Inservice Inspection 09/12/90 under NRC review. Program Relief Requests 05/08/91 DBP 5302BB/1 ..}}