ML20077C773

From kanterella
Jump to navigation Jump to search
Chart of Corporate Organization for Operational Nuclear QA
ML20077C773
Person / Time
Site: Waterford Entergy icon.png
Issue date: 06/09/1983
From:
LOUISIANA POWER & LIGHT CO.
To:
Shared Package
ML20077C744 List:
References
NUDOCS 8307260241
Download: ML20077C773 (1)


Text

I

,_.._..s._._..

FIGURE I-1 i

i ADHDlISTRATIVE

..._.........-culeEMICATIVE PRESIDEllT AND GIEF EFECUTIVE OFFICER SEllIOR MAEAGEBEll!

VIG PitESIDEll!

AUDIT NUCLEAR ORGallIZATICII OPERATICIIS 3

I 8

VICE SAPIIT QUALITY PItESIDENT REVIEW ASSURANCE IWC12AR COISETTEE Namacita CPERATICIIS I

5 p____________j i

i ASSISTAllT TICIBIICAL I

GENERAL POSSIL TO ADVISOK I

OPPIG QA GROUP VICS PRESIDENT I

QL GROUP IWCLEAR I

OPERATICIIS I

I s,

I STARIUP NUCLIAR NUCLEAR I

OPEltATIONS COIISTRUCTICII I

GROUP QL GROUP QA Git 00P l

(TEW)

I s

i u

l 3

L.. &......

L..........L.

3 I

I I

I PRIMECT TRAINING SIII ADMIllISTitATIVE PLAll!

l SUPPORI DIRECTOR DIRECTOR SERVIGS MAllAGER MAllAGER MallAGER HUCLEAR NUCLEAR HUCLEAR NUCLEAR NUCLEAR l

l l

l JOIll!

  • PLAllT QUALIIY TEST OPERATIONS C0KEROL GROUP REVIEW ColtsM"rEE
  • Ihe JIG, Site Director, 6. Sti.rtup QA Group, will exist until Waterford 3 is operational.

LOUISIANA POWER & LIGHT CO.

CORPORATE ORGANIZATION FOR OPERATIONAL NUCLEAR WATERFORD STEAM QUALITY ASSURANCE ELECTRIC STATION 8307260241 830609 i

'PDR ADOCK 05000382

._...A _ _ ___ _ _... _,PDR

F ATTACHMENT 11-1

. man:6 4

's, UNITED STATES

! f.-

'i NUCLEAR REGULATORY COMMISSION t

3 wasMNGTON, D. C. 20S55 s.

u~

%,,] #

MAY 171962 Mr. B. E. Tenzer, Director Materials Engineering and Quality Assurance Ebasco' Services, Inc.

Two Rector Street New York, NY 10006

Dear Mr. Tenzer:

SUBJECT:

ACCEPTANCE OF REVISION 11 TO EBASCO QUALITY ASSURANCE PROGRAM TOPICAL REPORT We have reviewed and evaluated Revision 11 to the Ebasco Topical Report, ETR-1001, submitted with your letter of February 22,1982 and as modified in your letter of May 3,1982.

Revision 11 reflects quality assurance pro-gram and editorial changes.

We find that this report describes a quality assurance program that meets the criteria in Appendix B to 10 CFR Part 50 and is therefore acceptable.

You may implement it upon issuance.

For the Ebasco quality assurance pro-gram, you need only reference this topical report in Chapter 17 of license appli cations. We do not intend to repeat our review of this topical report when 1.t is referenced in an application.

Should regulatory criteria or regulations change such that our conclusions about this topical report are invalidated, we will notify you.

You will be given the opportunity to revise and resubmit it should you so desire. Pro-grannatic changes by Ebasco to this topical report are to be submitted to NRC for review prior to implementation. Organizational changes are to be submitted no later than 30 days after announcement.

Please include a copy of this letter in the report, renumber the report ETR-1001, Rev.11A, and transmit 40 copies to the NRC.

In your transmit,

tal letter, please indicate to which plants Revision 11A will be applicable.

Should you have any questions regarding our review or if we can provide assistance, please contact Mr. John Gilray on (301) 45i.-4730.

Sincerely, I

/

' f*-

~

alter P. Haass, Chiet Quality Assurance Branch

~

Division of Engineering

-w""" ag y.

j a_

l

~

. -