ML20077C444
| ML20077C444 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 04/30/1991 |
| From: | Feigenbaum T, Nardone P PUBLIC SERVICE CO. OF NEW HAMPSHIRE |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NYN-91077, NUDOCS 9105210416 | |
| Download: ML20077C444 (6) | |
Text
. _ - _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -. - _ _ _ _
. Yankee fed C. Feigern oum Ch;ef he vi,,e of f aer NYN 91077 May 14,1991 United $tates Nuclear llegulatory Commission Washington, DC 20555 Attention:
Docurnent Control Desk flefe re nce:
I acility Operating License NPF Xr., Docket No, 50 443
Subject:
Monthly Operating iteport Gentlemen:
linclosed please find Monthly Opc*ating iteport 9104. This report addreues the operating and shutdown experience relating to Scabrook Station Unit 1 for the month of A pril, 1991 and is submitted in accordance with the requirements of Seabrook Station Technical Specification 6.S,1.5.
Very truly yours, f/W Ted C. Feigenbaum linclosure(s)
TCF:WJT/ tad cc:
Mr. Thomas T. Martin llegional Administrator United States Nuclear llegulatory Commission llegion 1 475 Allendale Itond King of Prussia, PA 19406 Mr. Gord. a ti, IIdison, hr, Project Manager Project F.rectoiate 13 Division of iteactor Projects
(
U.S. Nuclear llegulatory Commission Washington, DC 20555 Me, Noel Dudley NI(C Senior Itesident inspector i
P.O. If ox 1149 l
Seabrook, Nil 03874 910'3210416 410430 PDR ADOCJ : 05,000443 R
POR p
I New Hampshire Yankee Division of Public Service Company of New Hampshire 7
y\\
P.O. Box 300
- Seabrwk, NH 03874 + Telephone (603) 47&9521 L
I i
4 I
+
New liarupshire Yankee May 14,1991
}
I w
l I
t t
i l
r r
i
?
i
!!NCl.OSURl! 1 TO NYN 91077 i
t I
t I
i 1
P
- i i
i n.__-.~.,...._,,_,_,_.
,_.._.....,,..-.,..,,_...,_,..s.
.,_.,.c,._._,
1 l
OPERATING DATA REPORT 9
l l
DOCKET NO.
50:345
[
UNIT,,Jasbrook 1 l
DATE 05/14/91 I
COMPLM ED BY P. Nardone j
TELEPHONE 1103) 474-9521 (Ext. 4074) l 4
i OPERATING STATUS j
1.
Unit Matte:
Sentrook Station Unit 1 l
2 Reporting Period APRIL 1991 3.
Licensed Thermal Power (HWL)t 3411 4.
Har.splate Rating (Gross HWe):
1197 Design Electrical Rating (Net MWe):
1148
-6.
Maximum Dependable Capacity (Gross HWe):
1200 7.
Maximum Dependable Capacity (Net HWe):
1150 8.
If Changes occur in Capacity Ratings (Items Number 3 Through 7)
{
Since Last Report. Cive Reasons:
Not Applicable 9.
Power Level To Which Restricted, If Any:
None I
- 10. Reasons For Restrictions, If Any
- Not Applic,able f
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 719,0 2879.0 30768.0
- 12. Number of Hours Reactor Was Jritical 606,4 2706.2 8425 1
~
- 13. Reactor Reserve Shutdown Hours 0,0 0.0 953,3
- 14. Hours Generator On-Line
$89.5 2677.6 6805.0
- 15. Unit Reserve Shutdown Hours 0,0 0.0 0.0 1
- 16. Gross Thermal Energy Generated (HWH) 1936043 8497266 21097591
- 17. Gross Elec. Energy Generated (HWH) 674210 2958843 7230761
- 18. Net Electrical Energy Generated (HVH) 647790 2837235 6931233
- 19. Unit Service Factor 82,0 93.0 89.0
- 20. Unit Availability Factor 82,0 93.0 89,0
- 21. Unit _ Capacity Factor (Using HDC Net) 78,3 85.7 84.0_
- 22. Unit Capacity Factor (Using DER Net) 78.5 85-8 84,1
- 23. Unit Forced Outage Rate 18.0 7,0 11,0
- 24. Shutdowns Scheduled Over Next 6 Honths (Type. Date, and Duration of Each):
REFUELING. 07/27/91. 67 DAYD
- 25. If Shut Down At End Of Report Period. Estimated Date Of Startupt Not Applicable
- NOTE s - Values based on accumulated hours starting 08/19/90, date Regular Full Power Operation began.
j 1 of 4
_...,_. _.-..._ _ _._.____._,..._ _. _.~. _ __ _...._..- _.
AVERACE DA!LY UNIT POWER LEVEL DOCRET NO.
$0-443 e
UNIT Srabrook 1 l
DATE 05/14/91 I
COMPLETED BY P. Hardone TELEPil0NE (603) 474-95?1 i
(Ext. 4074)
I MONTil APRIL. 1991 I
1 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL j
DNe-He t )
(MWe.lle t )
i 2
1 0
16 1146 2
0 17 114$
I 3
0 18 1145 4
0 19 1146 i
5 0
20 1146 6-15$
21 1147 7
837 22 1148 8
1146 23 1148 9
1139 24
_,1148 10 1022 25 1147 l
11 1000 26 1147 I
12 1116 27 1148 13 1118 20 1146 l
14-1146 29 1146 15 1146 30 1147 i
l IllSTRUCTIONS On this f ormat. list the average daily unit power lev.1 in MWe Net for each day in the reporting month. Compute-to the nearest whole megawatt.
2 of 4 l.
l
1l
!l 1
f o
1 n
r 2
)
1 e
el 5
4 h
ti 1
e 9 7
e w
at 1
n 0
g
.ovn 3
k 9
e 4 4
a ktd u 4
o 1
d 7
P c
e 4
o 4
r 4 ad et r
1 a
t b ef r 0
b N
)
x e
nl a
5 a 5 3
E e
uint v
cn rais e 0
. 0
(
S F
6 i
f ae e
e mr
. (
t r
co ns r
TETE et i phd
.OITBN r
u b mt e c
NNA C
rn e ruiy m
n
)
i.
- r. F Ci R ud wa amho) n UD
- u. E oo t
l roti0i A E t
mse mcrnt a
u
- r. L
& c tn naid aSf oc=l n
u LE Ae cea r
mu p
O PT e
tl s ccd dnx v
psb a Si eseeE D
M s
C u
e i
ov t uuRi(
r C
a rrrl ll ano t
C F
aamiirar t eP a1 s
v9 d uuot vere l n
/
onnt newuh ae
.k6 haauoreDt ud nc0 tMMAC pF( O nna e/
e - - - -
a e ph 4 M1234 5
9 Mcoc0 3
i e
2 et 0
t s n 0
r S
ne o
N evp 1
O cE 9
e I
i T
1 L
R n
C 9
o U
9 i
D 1
t E
a 3
n R
L r
i R
I o
m E'
R f gt a
V P
onc x
C A
i a E
4 F
dt e otR 4
)
e
)
f D
hu n
s n
o N
thn i
n i
A eS w a
e a
3 H
M o
l c
l S
T D
p ni p
N x
oL x
W O
E i
E C
M
( t t&
(
u s
c i
T n
ee i g r
u R
o rT rn o
u O
u ti
.r) s
. S F
A l r snern a
E i o eivEi e
T
.R R
F 'e rtll a
R ai a
IN c
yTaap U
t ngr rnx nanort oE n) e nit osi(
o 5
mel ati t s
i pt el anar r
t u
9 ninuurire a o 2
ouif gemeh r H 1
s q a e e pd pt uD(
aEMRROAOO e - -
RABCDEFGH 2
'ep F
y T
1 9
e
.'/'
d 1
e t
0 l
a
/
d u D
4 ed 0
ce rh oc FS 3
0
.o N
1 FS
. 9 1
11;lil]
liil]jj! !ljjjj1ili; i44Iii!i
.aj{liif i
!li!!i i
~
1 DOCKET NO.
$0-443 j
4 UNIT Seabrook 1
?
DATE 05/14/91 COMPLETED BY P. Hardone __
j TELEPHONE (603) 474-95?1 1
(Ext. 4074)_
REFUELING INFORMATION RFM fil l
- 1. Name of facility:
Seabrcok Unit 1 i
- 2. $cheduled date for next refueling shutdown:
07/27/91 I
i
- 3. Scheduled date for restart following refuelings 10/02/91
- 4. Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment?
Yes, the removal of the Residual Heat Removal System Autoclosure Interlock
- 5. Scheduled date(s) for submitting licensing action and supporting
-information:
New Hamp hire Yankee Letter NYN-91011. submitted on January 24. 1991
- 6. Important licensing considerations associated with refueling, e.g..
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures None i
- 7. The number of fuel assemblies (a) in the core and (b) in the spent iuel storage pool:
(a)
In Core:
193 (b) 0
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
Present licensed capacity:
1236 No increase in storage capacity requested or planned, i
l
- 9. The projected date of.the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity Licensed capacity of 1236 fuel assemblies based-on sixteen annual refuelings and-full core offload capability.
The current licensed capacity is adequate until at least the year 2007.
4 of 4 rw v.* - r w w%,* -m
+erw vrw mt-e r *-e t-w e hw - +e ' e s s -ve--wv n-++w' h*--
v--'w:
e T+-t--"a-w-.e
- 'e--w-Fr--'-
m
-m----=r-
-r-
- - - - - -