ML20077C303
ML20077C303 | |
Person / Time | |
---|---|
Site: | Farley |
Issue date: | 04/28/1983 |
From: | Hudspeth J ALABAMA POWER CO. |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML20077C299 | List: |
References | |
FNP--EIP-8-2, FNP-0-EIP-8-02, NUDOCS 8307250699 | |
Download: ML20077C303 (30) | |
Text
'
- T ,
8 VOL. 14 FNP-0-EIP-8 March 30, 1983 '
Revision 28 FARLEY NUCLEAR PLANT EMERGENCY PLAN IMPLEMENTING PROCEDURE FNP-O-EIP-8 S
A F
E T
Y NOTIFICATION ROSTER R
E L
.i A T
E D
Approved:
u.A&c Plant Manager List of Effective Page Date Issued: M"A8-C Page Rev. #
1 28 i 2 25 Tbl 1 19
, Tbla 2-6 28
] Tb1 7 26 j Tb1 8-10 28 i App. 1, pg. 1 27 i pg. 2,3 18
! App. 2 25 i App. 3, pg. 1 25 j pg. 2,3 18 App. 4, pg. 1 25
] DOCUMENT CONTROL "0PY co..i - -
Disk EIP-1 DO NOT REPRupuCE, QQPY NO., Oh an!U 1
i 8307250699 830719 PDR ADOCK 05000348 F PDR i . __.
~
s VOL.14 FNP-0-EIP-8
() NOTIFICATION ROSTER 1.0 Purpose i
This procedure provides a listing of names and telephone numbers of personnel and organizations who may need to
, be notified in the event of an emergency condition.
2.0 References b
Joseph M. Farley Nuclear Plant Emergency Plan
. 3.0 General 3.1 Copies of this procedure shall be maintained at all times with the Emergency Director on call.
3.2 The Chemistry and Health Physics Supervisor
~
shall be responsible for updating names and telephone numbers for offsite agencies upon notification of changes. Communications checks and verification of phone numbers for offsite agencies will be conducted quarterly by direct contact.
3.3 The Staff Assistant will provide each new employee 3
O with a notice explaining that it is the responsibility of each employee to report any address or telephone changes to the Administrative Office.
3.4 A quarterly update of the Service Building I
Telephone Directory which contains the names, l job classifications, addresses, and phone numbers of all permanent plant personnel will be issued 4
to holders of EIP-8 by the Document Control i
Supervisor.
3.5 Channel 5 on the public address system is to be used during emergencies.
3.6 Authentication 3.6.1 Authentication of emergency messages shall not be required on dedicated communications systems.
3.6.2 Authentication of notifications over land lines shall be accomplished by the offsite party calling the TSC for the individual who made the notification.
Rev. 28 l
1
. l VOL.14 FNP-0-EIP-8
()
l
'l 4.0 Procedure 4.1 Refer to Table 1, Emergency Director Call List, l for the Emergency Director on call. l l
4.2 Refer to Table 2, Fire, Medical, and Law Enforcement Assistance and Weather Information, for offsite fire department support, medical transportation, hospitals, plant doctors, law enforcement agencies, )
and weather information. !
i 4.3 Refer to Table 3, APCo Management Notification, for the Emergency Coordinator and APCo Safety
, Department, and the Emergency Operations Facility. l l
4.4 Refer to Table 4, State Notification, for States ;
of Alabama, Georgia and Florida Notifications. i
.. 4.5 Refer to Table 5, Regulatory Notification or Assistance, for the Nuclear Regulatory Commission ,
and Savannah River Operations' Office.
)
l 4.6 Refer to Table 6, Support Groups, for other mis-cellaneous notifications. Information to be requested by Westinghouse is shown in Attachment 1.
4.7 Refer to Table 7, Health Physics Support, for qualified health physics personnel.
4.8 Refer to Table 8, Technical Support Center (TSC)
Call List, for members of the TSC staff.
4.9 Refer to Table 9, Oil Spill Notifications, for organizations who are to be notified as required by the FNP " Oil Spill Prevention and Countermeasure Plan".
4.10 Refer to Table 10, Technical Support 4.11 Refer to Appendix 1 for information regarding the use of the Emergency Notification Network.
4.12 Refer to Appendix 2 for Initial Messages to be used in notifying offsite authorities.
4.13 Refer to Appendix 3 for Follow-up Messages to be used in providing additional information to offsite authorities.
4.14 Refer to Appendix 4 for Westinghouse Event Data
,. Checklist to be used in providing emergency !
'l, information to Westinghouse. j Rev. 25 2
i l
(-
- FNP-0-EIP-8 1
i
. s j TABLE.1 l
1 .,
EMERGENCY DIRECTOR CALL LIST The individuals listed below will serve as the "on-call" Emergency Director for a seven day period (Monday through Sunday) on a rotating basis.
. "On-call" is defined as:
I
- a. At Farley Nuclear Plant, or
- b. At the individual's home where he can be reached at'his home phone number, or r- c. At a specific location in the Dothan area other than the individual's home AND the control room has the phone number where the individual can be contacted, or
- d. In the Dothan area (not greater than 30 miles from downtown Dothan) AND the individual's pager is ON.
l 1. The pager will be activated by dialing 793-XXXX l (pager number) on the Dothan exchange.
I 2. On any exchange other than the Dothan exchange the pager will be activated by dialing 1-793-XXXX (pager number).
- 3. After dialing, two rings will be followed by a high frequency tone; the caller then has 15 seconds to deliver a message. NOTE: The pager is a receiver only. It has no transmitting capability.
EMERGENCY DIRECTORS Name and Position Home phone Pager Number W.G. Hairston, III (
! Plant Manager 0
l J. D. Woodard p Asst. Plant Manager 1
D. N. Morey . -
Operations Superintendent , _ I p .. -
-. ..e f
l .-.s
!"-)
j TABLE 1 5
PAGE 1 of 1
'REV. 19
1
. s l
FNP-0-EIP-8 TABLE 2
. FIRE, MEDICAL, LAW ENFORCEMENT, AND WEATHER INFORMATION
) Service J. -
Organization Phone Aeromed. U. S. Army ~
Evac. Aviation Center Ambulance Daniel Construction Co. I
, Ambulance Dothan Ambulance, Inc.
Ambulance A & A Ambulance Co. - Birmingham j Adamsel Fire Dothan Fire Department s.. . exchange Ask for fire dept. Business -
Ask for Ext.
or Central Dispatch i
For Brush & Forest Fires Alabama State Forestry Commission
') Weekdays 8 am - 5 pm Other hours or if no answer -
Hospitals (Dothan)
Primary Southeast Alabama Medical Center Highway 84 East At Ross Clark Circle Ask for Emergency Room Nurse or Direct line to Emergency Room Nurse i or Direct line to Emergency Room Doctor Radiation Casualty Receiving Area Receivino Area.(Morgue) orn ,dd ask for morgue Public Relations Area (Adjacent to Morgue) or' '.and ask for Physician's !
Repr~esentat ive's office j , Corridor Phone Adjacent to Morgue Alternate Flowers Hospital (Not for contaminated / irradiated patientsi 409 West Main St.
Ask for Emergency Department Ext.
Hospital UAB Medical Center Main Operator '
Ask for Senior Staff Oncologist on call y ? .-
Radiation Care Treatment Facility-Page , , ^ f, . : d
- .a; .-
- -g
- O)
. Emergency Department F. #' 'A l
. Poision Control Center , .1 l %_____--~
TABLE 2 fV , PAGE 1 of 3 t
REV. 28
~
0 _ _ _ _ . _ __. - - . . . . _ . . . _ _ _ _ . - _ _ . . _ . . . . . - _ . .
i FNP-0-EIP-8 Service Organization Phone I Hospital
~ ~'~ "
REACTS
/ Oak Ridge (Normal work hours) ;
Asso. Universities Dr. Robert Ricks l Director of REACTS, Dr. Hubner Office Dr. Lushbaugh Oak Ridge Hospital (24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />)
Rad. Accident Personnel (Emergency) !
Local Law Enforcement Agencies Dothan City Police s exchanae)
Emergency Ask for police __
Business n.
Communication Division Ext i
Houston Co. Sheriff's Dept. Day Ext.
l (Jail)-Week-end/ Night Direct Line !
FBI - Dothan Office L Ala. Dept. of Public Safety
}
Company Physicians - Dr. B. R. Byrd, Dr. D. H. Pope, Dr. J. H. Sugg Dr. J. A. Robeson, Dr. W. F. Drewrv. ._ ,
Dr. E. Mazyck '-..
,N /
\
Dr. Flowers PA \
(Flowers Hospital Only) ~__..
E 509 West Main St. (Adjacent to Flowers Hospital)
- ~,
Dr. L. Johnson (For Eye Injuries) ,-,
(Flowers Hospital Only)
Southern Eye Clinic PA 509 West Main Street, Dothan, AL -
, (Adjacent to Flowers Hospital)
- Fairview Clinic staff should be contacted if a contaminated or irradiated patient requires medical care. Dr. Flowers and staff may be utilized for patients that are not contaminated or irradiated. Dr. Flowers and staff may be utilized for contaminated or irradiated patients should the Fairview staff be unavailable.
t z
7
' M4 TABLE 2 I
PAGE 2 of 3 l REV. 28 I
FNP-0-EIP-8 Organization Phone Se rvice -
- .~,,_
) Weather Flight Service, U. S. Weather Service, Dothan (AL) Airport Weather Bureau, Montgomery (24 hr)
Weather Bureau, Birmingham (Day Only)
(Forecasting Station) (24 hr)
Great Southern Paper Co.
Lab Guard (
Personnel (
\
s t
1 l'
~:
~ !.
[ '. T '
TABLE 2 l
PAGE 3 of 3 REV. 28
p FNP-0-EIP-8 TABLE 3 APC0 MANAGEMENT NOTIFICATION EMERGENCY COORDINATOR / RECOVERY MANAGER /EXECITIIVE NUCLEAR LIAISON MANAGER Pager Radio Call ,
Name APCO Ext. Home Phone Number Unit Number j R. P. Mcdonald H. O. Thrash
) O. D. Kingsley, Jr.
EMERGENCY COORDINATOR R0tTIINE MESSAGES Dial the page number provided. A message will be recorded and the individual's pager will alert him to retrieve it.
EMERGENCY COORDINATOR EMERGENCY MESSAGES Dial the pager number provided and leave a message. Hang up, wait at least 60
. seconds, and then dial No messages will be recorded but a second tone will be activated on all Emergency Coordinator pagers. .
EMERGENCY COORDINATOR CAR RADIO NOTIFICATION Refer to GO-EIP-112.
i ADMINISTRATIVE SUPPORT DIRECTOR Name APCO Ext. Home Phone Pager Number J. G. Sims NN c: , ~
6 N D. M. Varner d.
\
j N
4 D. E. Mansfield { \
l
.li L. L. Bailey -
ENGINEERING & LICENSING SUPPORT DIRECTCit' C. L. Buck R. L. George B. D. McKinney R. S. Fucich 1 .
n
) DOSE ASSESSMENT DIRECTOR _
J. W. McGowan , ,
s u ., .
,@ e. . . . - ..s-( K. W. McCracken i -l . J.;* l < . .,. c " . , . -
~
J7[ . ', [ ; ' ""
- '. '.@, s -
m - ~ = = : 2 .::. w " ( .
q.~ :~
. . - 2 y w_ . u TABLE 3 PAGE I of 4 REV. 28
f -
I s s FNP-0-EIP-8 ACTIVATION & LOGISTICS ASSISTANT
~~~ '
Susan Knight ,
~
G. N. Grove '
L N. L. Stoltz 1 .
SUPPORT STAFF ROUTINE MESSAGES -
Dial .
,-l' eave a message and hang up. Then dial the pager number for the selected individual to alert him to retrieve the message.
SUPPORT STAFF EMERGENCY MESSAGES r _
r Dial' .and leave a message. All Support Directors and the Activation and Logistics Assistants (including alternates) will be simultaneously alerted to
(! retrieve the message.
SUPPORT STAFF PAGEBOY MESSAGES Call the Birmingham Division Control Center (8-81-65 or Bell Numbers ' .. _ h l.'.~. - ex t .' ' ~
> Provide the operator with The pageboy I
code given for the individual and state the message you wish transmitted. All pageboy codes are for frequency' , . tDiz.
PUBLIC INFORMATION MANAGER Name APCO Ext. Home Phone Pager Number y ,_ _ . ... , ~ . -
3_. .
Neal Wade .
".7 Steven E. Bradley , 3 x, p. .
j HEDICAL SUPPORT '-R-- "-
l Name APC0 Ext. Home Phone Ans. Serv.
._s Dr. C. H. Colvin
{.;,
5: .
~ Ks -
i \
l Dr. M. Bradley. ('s -
1 i4 Q.
, ' ' ~ . . _ .' J
- LEGAL SUPPORT j Name APC0 Ext. Home Phone R. A. Buettner
'N
{ ,
H. H. Boles ;
i -
t A. L. Jordan ( s. f IL INSURANCE SUPPORT '% ' - '
"'j i Name APCo Ext. Home Phone C.T.
P! ; m@ir.7 ,a . P '. Q . G:.:M::
.~'.M- :.t Fv.N. e e r,.wm.. , 3 r, e.- Norman Horsley .Br Q L' . ; ,L j ~:. . %~:4: d . g T.77:Q :.y l:g.\
H. K. Travis ,
s
. t l- .
- a. .
e . ;
p . -.. . .. -_____ _- -
FNP-0-EIP-8 OPERATIONS SUPPORT CENTERS Maintenance Shop R
Pax i Auditorium Pax
. ^\ -
l CSC Pax f, Control Room Pax
! Switchhouse Pax ;
FLINTRIDGE EMERGENCY OPERATIONS CENTER
. Location APCO Ext. Bell Number Other NGS Conference Room N ENN l'
l- NGS Conference Room .
l r NGS Conference Room -
- Location Extension I Communications Cabinet ENN (State Hotline - White Phone)
NRC. Ring Down (Red Phone)
PAXi iwith speaker B' ham with speaker B' ham Communications Area PAY '
.(next to Communications Cabinet)
Seddiitfradio Plant radio Division radio t Emergency Director PAX /
- i. !
t Operations Manager PAX, I i Maintenance Manager PAX' i ! -
Technical Manager PAX l-Health Physics Manager PAX NRC PAX PAX' b
t Monitoring Area PAX I
.. . i I
/
TABLE 3 PAGE 3 of 4 k REV. 28 1
s
y I
FNP-0-EIP-8 ALTERNATE TECHNICAL SUPPORT CENTER Location APC0 Ext.
~
Other Shift Foremen's Office NRC ENS (Red Phone)
Shift Aids Office ENN; NRC H.P. dial up '
i
- Control Room Area APC0 Ext.'
l . Unit 1 Shift Supervisor l
Unit 2 Shift Supervisor g Unit 1 Operators Desk !
Unit 2 Operators Desk 4 .__
EMERGENCY OPERATIONS FACILITY Location .FNP Ext. Other Command Center (Room 106) . . . . . . . . . . TSC Intercom ENN l .
. NRC ENS (Red Phone)
, NRC HPN Recovery Manager (Room 106)....... ..................... Security Radio Plant Radio NRC (Room 106).................... ..................... District Radio l APC0 Technical Support Area.......'
(Room 103)
)
Architect Engineers /NSS Vendor l Area (Room 104).................
\
/
I.
ALTERNATE EMERGENCY OPERATIONS FACILITY (Headland,AL) Bell # _
Location APCO Ext. Other hr
~
NRC Staff Area (Room 105) !
~
Dose Assessment Area (Room 115)...I .................... Security Radio j State RMT Radio F (monitor only)
Command Center 'N ENN l Security Radio
\ District Radio Division Radio State RMT Radio (Monitor only)
Engineering & Licensing [. , , , ' . ,
,; 6 a3 ;.: : . ' % .~; )'.
8-
\.. ; .~; .&,q TABLE 3 i N .- . _ . -
PAGE 4 of 4 REV. 28
FNP-0-EIP-8 TABLE 4 STATE NOTIFICATION Organization Name Phone 4 STATE OF ALABAMA During normal office hours '
(week days 8:00 AM - 5:00PM)
Dept. of Public Health _ _ _ _
At all other times notify one of the following:
Aubrey V. Godwin , \ ,
i K. E. Whatley --l Archie Patterson James L. McNees William T. Willis If above unavailable, call .
Ask operator to page No.
p The Local Agencies should be notified in case the Alabama Division of Radiological m Health cannot be contacted within 10 minutes and a General Emergency has been
(* ') declared. Use the Emergency Notification Network if operable, otherwise call the numbers listed below.
County Director Phone ~ .
Houston County, AL J. W. Aldridge ,
Civil Defense -
s -
State Operations Room f. {
i l 1 :
Operations (Local) l
! (State) '
i j (State) >
j q or Karen Gilley *. !
- ' l or Brenda Dunning Blakely-Early County, GA Civil Defense (
Ray Garrett *:
Hot Line l, i
Early Co. Ambulance Service ../
Early Memorial Hospital Ic ,
.,/
Sheriff's Dispatcher .-j,.& f [;
s T --mm-1.,'
- Denotes home phone
( TABLE 4 I
PAGE 1 0F 3 REV. 28
p = . . . . . _ . _ - _ _ _ _ -=. _ -- - _ _ _ _ .___._ -. . _ _ _ _ . . . _ : .. _ _ . . . .
. FNP-0-EIP-8 i; ) Organization Phone ISTATE OF FLORIDA - " ~ ~
'--7 j ,
West Area Coordinator - Robert R. Smith k
[ Defuniak Springs f i
(
State Warning Point Division of Disaster
\
' i Tallahassee Preparedness .
i Alternate Warning Division of Law Enforcement L Point Tallahassee
' Tallahassee DHRS - Lyle Jarrett -
I Ulray Clark l
I Orlando Radiological Lab , g l
I '
Organization Phone STATE OF GEORGIA _ _ _ _ _ _
ENV. Rad Program On Call Member .
, ,0n Call ENV. Prot. Div. Staff Member
- p Georgia Emergency Management Agency 24 Hour No. _
Emergency Operations Center t
N I Contact Office Phone Home Phone
)
__.7-I James Hardeman l' I Clifford Blackman 1 -
Susan Adamovitz i Alphansa Gooden i !
Clark Reynolds .
Jim Setser .
V T~ \
Normal notification is through the State of Alabama, Department of Public Health.
- 24 hour number l
6 g n TABLE 4 PAGE 3 0F 3 8{"'- REV. 28
?.
)
i
,i e
r- _ _ _ . - -
FNP-0-EIP-8
, TABLE 5 REGULATORY NOTIFICATION OR ASSISTANCE -
Organization Name Phone Nuclear Regulatory Operations Center, Bethesda Red Phone (ENS)
Commission, 3 Health Physics Network _
1 Full-time Duty Officer, Be'thesda Commercial Telephone System to NRC Operations Center (via Silver Spring Central Office)
Full Time Operator, Bethesda $r Public Affairs, Bethesda /
y I
Nuclear Regulatory Office of Inspection Commission, and Enforcement 101 Marietta St. N.W.
Suite 3100
-) At.lanta, Georgia 30303 J. P. O'Reilly
" ; #onal Administrator David Berrelli Chief, Reactor Projects,Section II ,
R. D. Martin Deputy Director i .
Confirmation Western Union Telegraph Savannah River Duty Officer
.] Operations Office NRC On-Site William H. Bradford or Inspector W. H. Ruland $_ T'..(*j. ,'. 5 . f(,1 1 '.'
';:;gll;i!::?g p_%c,y s y. ~ [~ ~ ~
- Home Phone TABLE 5 PAGE 10F 1 REV. 28 L
FNP-0-EIP-8 TABLE 6 SUPPORT GR0dPS ,,
Organization Name Phdue
._~'
Applied Physical Technology North Offi'ce' Dr. Dave Walker
- Bob Hearn
- Institute of Nuclear Power Operations (Switchboard), '
l Duty Officer (Emergency) f s
Oak Ridge Opns Office of DOE (Request through State of Alabama) .
~... -
1 University of Georgia _
Center for Applied Isotopes Study -- --
1
(. . Campus Police)
Hatce police ,coutact one of- the followinge Dr. John Noakes Jim Spaulding-Organization Name Phone i I
^
Southern Company ** J. R. Crane (Dept. Mgr) > i 1
Services, Inc.
3.___...
I Southern Company ** Chris. Byrd'(Civil & Arch. P.E.) t'
~
'i '-
Services, Inc. !
W. R. Hill (Proj. Support Mgr)
) g. ,
.5,
-l .
I D. E. Kendrick (Mech. P.E.) ,
f .
l H. H. Stone (Elec. P'.E.) , s ~
'l d'
- Home phone. k -
- "'To call on PAX phone dial access codes as appcopriate plus .8-61-85 and last four digits of the .dimbe r. _
i b TABLE 6 i% PAGE 1 0F 2 REV. 28 -
1 LI ,_. -. 2
y~.
l _
FNP-0-EIP-8 y.
4 YSTINGHOUSE T'7 TIC .
N, Power Generation Service Charlie Reep PAX
- Division (Birmingham)' Bob Wise -
l Chuck Patrick -- - - - -
f Water Reactors Division (Pittsburgh) l ,'
Inforw.one Westinghouse contact, using this list in the order shown, to ensure early notification to V of an emergency occurring at FNP. Be prepared to transmit h the data requested in Appendix 4, to discuss as many facts as are available at the I
time of the call and to identify a cognizant individual to provide continuing l communications and updates to W. ,
, Title Name . Office Home Hot Line I ^
- 1. Site Services Rod Baulig s g
$ Manager ' '
-_u- h- -~-
AREA CODE 412 FOR ALL NUMBERS BELOW l
,3 _----.._7, _
- 2. Operating Pla'at John Miller k Regional Manager '
g ist Alternate Lonnie Benson ~ ~~~ ~
./' a j 2nd Alti-rnate Dallas LoKay l 2 3. Service Response Tom Mitto -
/
, Manager -
1
~ ~ , '
1s t 'Alterante
~ ~
1 Bob Stokes
=
2nd Alterante John Miller
- 4. 8:mergency Response Tom Anderson *
, Director -
t
- 5. Emergency Response Ron T.ehr - - - - - - -
Deputy Director _
n ,
6.
Emergency News Mike Mangan i Communications ,
NUCLEAR MUTUAL LIMITED w.s Larry Cummingrc ' New York jday)
}
Al Rand Office -
'*(emergency / night)
\ i -l Quentin Jahkson Hamilton l ,da y*)
/
Bermuda ' -
,(night)
Office j(day *)
Adrian' Lee-Enery , I (night)
.,. . *24' hour recording device TABLE 6'
- f. PAGE 2 of 2
} k.),,, REV. 28 i
l '
(r
l FNP-0-EIP-8 I
cr -
TABLE 7 HEALTH PHYSICS SUP.00RT Name and Position Phone
( Nesbitt, C. D.
Technical Superintendent Ca rr, W. C.
C&RP Supervisor ,,
Mitchell, M. W. -
C&HP Sector Supervisor Farnsworth, P. E.
Shif t Support Supervisor ,
Patton, B. P.
Plant Health Physicist Walden, J. M.
Radwaste Supervisor
, N., Gripentog, W. G.
Environmental & Emergency Planning Supervisor Graves, O. M. '
C&HP Foreman ,
I Hostetter, D. A.
C&HP Foreman
..)
j; Maddox, N. M.
] Plant Instructor ,
.1
]j Bayne, W. R. '
Plant Chemist
- l c a-Gilliam, B. J.
~
C&HP Foreman Hall, C. R. s C&HP Foreman
~~_____.
TABLE 7 PACE 1 0F 1 i e.. REV. 28 L .
I 1
r_-- _ J. _ _ m . , , ,_ _ _ . ,. - .___.___ _ _____ _ . _
_ _ _ _ _ _ _ _ _ . . . . . _ . _ ..; i l
- 1
. l 0 l l FNP-0-EIP-8 '
. I TABLE 8 TECHNICAL SUPPORT CENTER CALL LIST The individuals listed below will serve as the "on-call" Managers for a seven day period (Monday through Sunday) on a rotating basis.
"On-call" is defined as:
- a. At Farley Nuclear Plant, or
- b. At the individual's home where he can be reached at his home phone number, or
- c. At a specific location in the Dothan area other than the individual's home AND the control room has the phone number where the individual can be contacted, or
- d. In the Dothan area (not greater than 30 miles from downtown Dothan)
AND the individual's pager is ON.
I s 1. The pager will be activated by dialing 793-XXXX (pager number) on
' ~ ~
the . J ;,JDbthan exchange.
- 2. On any exchange other than the Dothan exchange the pager will be activated by dialing 1-793-XXXX (pager number).
- 3. After dialing, two rings will be followed by a high frequency .
3 tone; the caller then has 15 seconds to deliver a message. NOTE:
\. .sl The pager is a receiver only. It has no transmitting capability.
Name and Position Home phone Pager Number Operations Manager - . _
- 1. R. D. Hill
- 2. J. E. Odom ---
- 3. T. H. Esteve :
Maintenance Manager
- 1. W. B. Shipman
- 2. H. R. Garland '
- 3. R. M. Coleman . ,
I t Technical Manager '
- 1. C. D. Nesbitt
- 2. R. G. Berryhill
- 3. R. D. Rogers [
Health Physics Manager '
- 1. W. C. Carr s
- 2. M. W. Mitchell -
- 3. B. P. Pattoa ,,
,c,/
SAER Supervisor *
/ $~ _". d-J # U O f.T 793-8455
.: 1. W. G. Ware
',INi7_ f N'. ; *
,_ 2. J. B. Lowery .. . ,~ 3)/'
- 3. D. R. Culver
~. . TABLE 8 PAGE 1 0F 2 REV. 28
p- - - .
a
. FNP-0-EIP-8 Name and Position Home phone Pager Number
- g7 Reactor Engineer g_ . ..,c.,.,,g;,eg;. 3ne,; 2,:{7 p pg.f.;,,
~
- 1. R. H. Marlow i
'?* -
- 2. W. S. MacDonald 21
- 3. S. G. McDaniel :y ..
g .*
, Chemistry Supervisor
- 1. W. R. Bayne I
- ) '
I 2. R. T. Wood i
- 3. R. A. Livingston -"
Environmental Supervisor ~ *:
- 1. W. G. Gripentog ,
~,
- 2. J. Higginbotham -
e p..-' ,
- 2. J. M. Walden ( . - .
e
. .. /
~~.'../ .
1 s
.I
\
D I
l b
i 5
h e.'.
D-TABLE 8 PAGE 2 0F 2 REV. 28
- - - , e- - , , ,,,--n--,, , - < , , ., , . , - , e-, , , , - - , , -, e v -
1
. FNP-0-EIP-8
.. TABLE 9 OIL SPILL NOTIFICATIONS Organization Name Phone - --
v U.S. Coast Guard National Response Center s
Department of Environmental (office)
Management 5
s' John Williford Charles Horn 2
- James Warr .
Environmental & Research .
g Services Steve Jones ,
- . 1 k.1 -
(' Charles Biddinger Environmental Protection Agency A. J. Smith (office) .
R. D. Stonebraker
- s)
George Moein (24 hr) '
7 Ray Wilkerson Jan Rogers Fred Stroud Warren Dixon Charles McPherson Edward Hatcher e,1 Albany Waste Oil Thomas Davis ,
. Great Southern Paper Co. G. E. Rathel i i
i Jack Anderson 2 Tenneco Oil Co. Cleo Savelle (after hours) '
,; *Home Phone
. (p s.y; Table 9 Page 1 of 1 Rev. 28
FNP-0-EIP-8 h
TABLE 10 '
TECHNICAL SUPPORT Name and Position Phone Nesbitt, C. D. i Technical Superintendent Rogers, R. D. -
Technical Supervisor Hill, R. D.
Operations Supervisor I
l l
}
Marlow, R. H. i GPE Supervising Stephenson, E. L.
GPE Supervising Ward, L. A.
Planning Supervisor
,) ~'
~
Webb, P.
Generating Plant Engineer II McDaniel, S. G.
Generating Plant Engineer I I' MacDonald, W. S. ,
1 Generating Plant Engineer I i Gripentog, W. G. \
g Env. & Emerg. Planning Supervisor -
Bayne, W. R. -
Plant Chemist x ~ l I- -
TABLE 10 PAGE 1 0F 1 REV. 28
FNP-0-EIP-8 APPENDIX 1 ,
ALABAMA POWER COMPANY NUCLEAR GENERATION SECTION-DIRECTIVE I
l NGS-Dl, EMERGENCY NOTIFICATION NETWORK
( Effective Date:
/ Approved:
Vice President - Nuclear Generation
?
1.0 Purpose This directive describes the locations and capabilities f' of the Emergency Notification Network (ENN) and establishes
, procedures for its use and testing.
2.0 Scope This directive applies to all organizations and agencies on the ENN. Implementation of this directive will require that interfacing procedures be developed for each dispatcher station.
3.0 Description An ENN unit is installed at the following locations:
- h FNP Technical Support Center FNP Emergency Operations Facility APCo Nuclear Generation Flintridge l Alabama Department of Radiological Health
- 3 Alabama Department of Civil Defense
- Alabama Department of Public Safety
- Georgia Emergency Management Agency l
Houston County Sheriff Dispatcher Houston County Office of Civil Defense
_ Houston County Office of Radiological Health P
l Early County (GA) Sheriff Dispatcher
- Located in Montgomery l
App. 1 Page 1 of 3 Rev. 2 7 l-
. ... FNP-0-EI2-8 Each ENN un t shall. consist of a telephone and speaker.
g~) When all phones are cradled,. all sneakers are muted.
If any one of' the phones is ~1ifted'off the cradle all i speakers are activated except the speaker associated with the phone taken off the hook. The phones do not ring. The person lifting the phone need only speak into the phone to be heard by personnel at all the other ENN units. When any other ENN phone is taken off the hook the associated speaker will be muted and normal two way voice communication is established between the two parties. This communication will be transmitted through those speakers not muted, i.e.
those with the associated phone cradled.
g CAUTION Upon completion of any transmission from a given station the phone must be returned o .. . . . . m n, a -;n ., ..r :. ,;, to ,the. cradle,,to activate, .the . associated ,,,.a... ,,
-~
speaker. Do not leaveplione unattended
. . . . off the. crFo.le.. . . . . _
. 4. 0- Net Control .
4.1 Initial Notification (k
/
D A
In an emergency situation dictating the activation of the ENN; the Technical Support Center at Farley Nuclear Plant shall make initial notification using the following message: -
"This is (Name and Title) at Farley Nuclear Plant. Please initiate your radiological notification procedure".
l Dispatchers will acknowledge receipt of the above message and proceed in accordance with
- - s
.. their procedures <. No technical information will
'be given until the appropriate state and/or local agency (ies) are on the ENN.
4.2 False Notification In the event of an attempted false notification i or other misuse of the ENN, the speaker in the TSC at Farley Nuclear Plant will be activated and FNP personnel will receive the message
, . transmitted. If the. message is an attempt to
~ cause a false notification, FNP supervisorf personnel will lift the TSC phone and state
' " Negative, Negative, Negative" followed by "This
/
is (Name and Title) ackncwledge negative".
O) q v
)
4 App. 1
{ Page 2 of 3 Rev. 13 j ..._. . .. . . . . . . _ _ . . . . . . _ . . . . . . . _ . _ _.
. +
l '
.. . FNP-0-EI2-8. .
Y Dispatcher will acknowledge and proceed in A/ accordance with their procedures.
1 4.3 Subsequent Communications The ENN may also be used for the clear transmission of technical, radiological and meterological data and action statements and recommendttions based on evaluation of this data.
The Technical Support Center (TSC) at the Farley Nuclear Plant shall be net control for all ENN
'i communications. The TSC shall have priority in
- l. transmitting information and shall govern
- i. transmission by other organizations.
5.0 Communications Checks
- )
... -The ENN wil.L be tested on. the. first Tuesday of each M "
. . ~ . . . . .
1i00 p.i.' a'nii 1:30 p.m. Dothan, Alabaina
+. . time ..The- test.will.be performed as. follows:.. .
. The shift supervisor will remove the
, receiver from his phone and repeat, "This is (Name and Title) at Farley Nuclear Plant, tnis is a communications check, acknowledge". Acknowledgement should t , followathe< order given in paragraph-3.0. .
The shift supervisor will verify that all .
ENN units are responding and notify the appropriate organization by separate means.
i 6.0 System Security
. .j The possibility for misuse and/or abuse of this type system is obvious. Therefore, each organization that has an ENN. unit installed in locations not manned on a 3 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> basis shall' provide adequate security measures i* to minimize the probability of misuse and abuse.
Descriptions of the security measures established will be provided to Alabama Power Company.
.l I
A Acc. 1 l Page 3 of 3 2'e v . 13 l l
.- . . - ~ _ , . _ - . . . -- . , _ -- ..
. FNP-0-EIP-8 APPENDIX 2 INITIAI MESSAGE This is , the Emergency Director at Farley Nuclear Plant. -
(Name)
- 1. This is to inform you that an emergency classified as:
() Notification of Unusual Event
() Alert
() Site Area Emergency
() General Emergency has occurred involving Unit (s) .
3 2. () A release is not in progress.
() A release may be in progress.
~
('? A li' quid' release is in' progress. - '
() An atmospheric release is in progress.
- 3. Atmoseheric Liquid Release Point Release Point
. Magnitude
/'Nr ' Wind direction 35': (from) 0- 0 (s_,/ Wind direction 150.': (from) 0;(to)
(to) 0 Wind speed 35': aph + 2 meter /sec Wind speed 150': sph + 2 meter /see i
- 4. On-site situation (circle):
- a. Evacuation of on-site. personnel- Yes No Some i *
- b. Recommended protective actions: None Shelter Evacuate
- c. Assistance needed: Fire Police Ambulance Other I
- d. Prognosis of situation: Terminated Stable Worsening Other
} Further informatiou vill be transmitted as soon as it is available.
I i
e l
?
I .
[s
, Appendix 2
- Page 1 of 1 Rev. 25
~
- FNP-0-IIP-8
. APPE2 DIX 3 h
\ ;&
FOLI.0WJP MESSAGE
., ' h:3 1. This is at urley Nuclear Plant.
f Name/ Title
- 2. An incident occurred at _(time) on (date).
- 3. The incident was classified as (circle):
- a. Notification of Unusual Event Alert b.
- c. Site Area
- d. General
- 4. Type of release (circle):
- a. Airborne 5
- b. Waterborne
- c. Surface Soill
[ _
e 5. Estimated duration / impact times of release:
Ne -*
\ 6. Release Information
- a. Noble gas concentration at effluent point: pCL/cc
- b. Iodine concentration at effluent point: pCi/cc
- c. Effluent flow rate: cfm
{ Conversion factoc: 1.7x106 cc/sec-cfm cc/sec
- d. Noble gas activity release rate: pCi/sec
- j e. Iodine activity release rate: pCi/sec
-l ll 7. Height of release (circle):
I
- a. Ground elevation, EL 155
- b. Ventstack, El 299 u 8. Description of released material (chemical & physical form, estimate of relative quantities of noble gases, particulating and iodines.)
- j Appendix 3
- t Rev. 25 l Page 1 of 3
i j
. INE-0-EIP-8 1
l 1.- 9. Meterological conditions (heights given with respect to. base at EL 182).
E*
_ a ., . , Wind speed.@ 35':
mph'+ 2 =
meter /sec.
i.
- b. Wind speed @ 150': sph + 2 = meter /sec
- c. Wind direction @ 35': degrees (from which wind is blowing)
- d. Downwind direction @ 35': . degrees (g which wind is blowing)
- e. Wind direction @ 150': _
d'grees a (from which wind is blowing)
- f. Downwind direction @ 150': degrees (g which wind is blowing) 9 g. AT between 35' and 200': degrees F c h. Stability classification (ch$ck):
0"
...m.. .
) <-1.740F
} . .
.., ,. . . . ( ,7,.3 . A.,7774."
- "th' M 1.560$" "
~"' " .. ""' " ' " '
- () C:. -1.56 , to -1.380F.
() D: -1.38 to -0.460F
- () E: -0.46 to 1.380F
() F: 1.38 to 3.60F 0
() G: >3.6 F
_. .____________i_ Form of precipitation:
- 10. Dose rates at site boundary (circle):
~ -
Actual Projected Value: mrem /hr .
Miles 2 5 10 i Meters 3,2.26- 8,065 16,130
- 11. Projected dose rates at:
Projected integrated dose at:
-i I2. Estimate of resulting offsite surface radioactive contamination:
'J l
.l 13. Emergency response actions underway:
- 14. Recommended emergency actions / protective measures (circle):
None Shelter Evacuation S ,q , Other Appendi:c 3 Rev. 18 Page 2 of 3 1, _ . . _ _
._) J
^
FNP-0-EIP-8 J
'~ -
- 15. Request for needed onsite support by offsite authorities:
i l, . --
- 16. Prognosis of situation (circle): !
Terminated Stable Worsening Other 1
Prepared by: / !
Name/ Title
- s. Date/ Time: / _
I
. Followup information provided to:
Name Org Date/ Time / . _ .
! Name Org Date/ Time / .
Name Org Date/ Time /
e
, Name Org Date/ Time /
- . .. Nam
. . e- Org Date/ Time
/ -
Name _
Org Date/ Time /
Name Org Date/ Time /
Name Org Date/ Time /
4 l1
.I J'.
j Appendix 3 Rev. 13 Page 3 of 3
} _ _ _ _ . _ _ . ~ - - . _ _ - _ - - - - - - . _ _ - - - - - - - - - - - ~ - - - -
e FNP-0-EIP-5 O
' WESTINGHOUSE EVENT DATA CHECKLIST
- s. -
INFORMATION l-INDIVIDUAL RECEIVING DATE: TIME:
FARLEY NUCLE.Ut PLurr EVENT RCS PARAMETERS
- 1. RCS Pressure psia
- 2. Trend Up / Down / Sta ele
- 3. Przr. Level % Span
- 4. Trend Up / Down / Staole
- 5. Przr. Liquid Temp./ Steam Temp. / OF 6.
'~ --
f Przr. Heaterr on / Off
( RCS MAKEUP FLOW STATUS
- 7. ' -Safety-Injection, Flowrate- ' '
On / Off' -- - '
spa - ' ~-"'
- 8. Rb3T Level E F
- 9. Normal Makeup', Flowrate In On / Off, gym
] 10. Letdown Flowrate gpm/ isolated NSSS LOOP PARMfETERS LOOP n A B C
- 11. Wide Range
(- 12 7 Wide Range OF OE ))
~~^
12.- RCP Status (6n/Off) 4 14 S.G. Pressure (psia) .
- 15. ~ Trend Up / Down / Stable '
- 16. S.G. Level, Wide Range (% Span)
- 17. S.G. Narrow Range (% Span)
- 18. Trend Up / Down / Stable
- 19. Steam Flow (% Nominal
- 20. MSlV Status Open/ Closed !
- 21. Main Feedwater Flow (gpe)
- 22. Auxiliary Feedwater Flow (ape)
- 23. Condensate Storage Tank Level E F J
CONTAINMENT PARNIETERS 24 Containment Pressure, Temp.
-?
25.
psig j?
Contai.nment Radiation
- 26. Recirculation Sumo Level
- 27. Hydrogen Concentra' tion "
YOTES:
{
~
Appendix -
PAGE 1 of 1 Gen. Rev. '.3 1.
i J' -