ML20077C283
| ML20077C283 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 11/28/1994 |
| From: | Mckee P Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20077C284 | List: |
| References | |
| NUDOCS 9412010116 | |
| Download: ML20077C283 (3) | |
Text
.
- C'%q, 4*
UNITED STATES ye
[,S NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20526 4001
- s,...../
METROPOLITAN EDISON COMPANY JERSEY CENTRAL POWER & LIGHT COMPANY PENNSYLVANIA ELECTRIC COMPANY GPU NUCLEAR CORPORATION DOCKET NO. 50-289 THREE MILE ISLAND NUCLEAR STATION. UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.192 License No. DPR-50 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by GPU Nuclear Corporation, et al.
i (the licensee), dated September 26, 1994, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and i9gulations of the Commission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part i
51 of the Commission's regulations and all applicable l
requirements have been satisfied.
l l
9412010116 941128 PDR ADOCK 05000289 P
, 2.
Accordingly, paragraph 2.C.(9) of Facility Operating License No. DPR-50 is hereby amended to read as follows:*
(9) lona Ranae Plannino Procram The revised " Plan for the Long Range Planning Program for the Three Mile Island Nuclear Station - Unit 1" (the Plan) submitted by GPUN letter C321-94-2124, dated September 26, 1994 is approved.
a.
The Plan shall be followed by the licensee from and after November 28, 1994.
b.
The Category A schedule shall not be changed without prior approval from the NRC. Categories B and C schedules may be changed without prior approval by NRC.
3.
This license amendment is effective as of the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION N
)
Phillip F. McKee, Director Project Directorate I-4 Division of Reactor Projects - I/II l
Office of Nuclear Reactor Regulation
Attachment:
Page 7 of license DPR-50 Date of Issuance: November 28, 1994
- Page 7 is attached for convenience, for the composite license to reflect this change I
a ;
5.
GPU Nuclear Corporation shall provide routine reporting of the long-term corrosion " lead tests" test results on a quarterly basis as well as more timely notification if adverse corrosion test results are discovered.
1 (9) lona Ranae Plannina Proaram The revise.: Pitn for the Long Range Planning Program for the Three Mile :st and Nuclear Station - Unit 1" (the Plan) submitted by GPUN letter c'll-94-2124 dated September 26, 1994 is approved.
a.
The Plan shall be followed by the Licensee from and after November 28, 1994.
7 b.
The Category A schedule shall not be changed without prior approval from the NRC. Categories B and C schedules may be changed without prior approval by NRC.
6.
This license is effective as of the date of issuance and shall expire at midnight, April 19, 2014.
FOR THE ATOMIC ENERGY COMMISSION Original Signed by A. Giambusso A. Giambusso, Deputy Director for Reactor Projects Directorate of Licensing
Attachment:
Appendix A Technical Specifications Date of Issuance: April 19, 1974 t
Amendment No.192