ML20077B997

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Request for 60-day Extension for Responding to Emergency Plan Review.Extension Needed to Allow Rewriting,Review & Approval of SOPs to Improve Reactor Operations
ML20077B997
Person / Time
Site: University of Virginia
Issue date: 06/24/1983
From: Brenizer J
VIRGINIA, UNIV. OF, CHARLOTTESVILLE, VA
To: Thomas C
Office of Nuclear Reactor Regulation
Shared Package
ML20077B983 List:
References
NUDOCS 8307250521
Download: ML20077B997 (1)


Text

  • . b UNIVERSITY OF VIRGINIA SCHOOL OF ENGINEERING AND APPLIED SCIENCE C H ARLOTTESVILLE. 22901 sV v D EPARTM ENT OF NUCLEAR ENGIN EERING AND ENGIN EERING FHYSICS TELEPHON E: 804 824 7136 KEACTCR FACILITY June 24, 1983 Mr. Cecil 0. Thomas, Chief Standardization & Special Projects Branch Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Thomas:

The staff of the University of Virginia (UVa) Research Reactor Facility (Docket Nos. 50-62 and 50-396) are currently reviewing your staff's comments from their review of our Emergency Plan. Many of the areas for which additional information or changes in the existing plan have been requested are easily addressed. However, it appears that several of these areas will require a major rework or additions to the existing plan.

As you are probably aware, as a result of a recent reportable occurrence, we are currently. involved in rewriting, reviewing and approving several sections of our Standard Operating Procedures to improve reactor operations of our 2 MW Research Reactor. We are also in the middle of our Reactor Operator Training Program. We have begun to revise our Emergency Plan in response to your review comments. However, we feel that we could do a more thorough rework given a longer response l period.

l Thus, I request a 60 day extension to the 30 day deadline for our' l response to the UVA Emergency Plan Review. Thank you for your prompt consideration of this matter.

Sincerely, l,

@ 'b J.S. Brenizer, Lirector UVA Nuclear Reactor Facility JSB:vs i

8307250521 830719 PDR ADOCK 05000062 PDR p

REGULATURY ANFORf4TkO'MDISTRIOUTIONSYSTEM (RIOS)

' ACCESSION 4bRrt;0;22050 DUC.DATE: 83/06/24 NOTARIZED: NO DOCKET #

FACIL: 50-6d Univ. of Virginia Research Reactor 050000e2 50-396 Univ. of virginia Cavalier Reactor 05000396 AUTH.f4 AFE AUTHUR AFFILIATION bkEAIZER,J.S. Virginia, Univ. et, Charlottesville, VA RECIP.NANt HECIPItNi AFFILIATION T F O .v A S , C . O . Stanuardization & Special Projects Branch

SUBJECT:

Recuests 00-cay extension for responding to emergency plan review. Extension required to allow rewriting, reviewing &

approval of std operating procecures to improve reactor operations.

DISTRIBUTIuN CODE: X009S COPIES RECEIVED:LTR _ EhCL 3 SIZE:.._J _____

TETLE: Critical / Test /Researen Facility: Emery Plans (CF) teC T E S :

kECIPIENT COPIES RECIPIENT COPIES Iu LODE /NAME LTTR Eh L 10 CODE /NAME LTTR ENCL NRd SSPd BC 1 NRR SSPs LA 1 l CARTER,R.E. 01 1 INTEHhAL: CED*70 R3 Od 1 FEMA TECH HAZO9 1 IE/0EPER DIR 1 IE/DEPER/EP6 04 3 .

HEu FILE 03 1 RGN2 07 2 c 0

TuTAL lu *nEn UF CUPIF3 n E .4 U I R L O : LTid id E:,C L \