ML20077B655
Jump to navigation
Jump to search
| ML20077B655 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 07/15/1983 |
| From: | Brandt C TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | |
| Shared Package | |
| ML20077B645 | List: |
| References | |
| NUDOCS 8307250359 | |
| Download: ML20077B655 (1) | |
Text
f t
which have this requirement are the main steam and feedwater lines.
Consequently, the piping runs in each of the areas were reviewed and it was determined that if main steam or feedwater pipe is in those areas there are no integral attachments to those pipes requiring Charpy impact testing.
Accordingly, there is no reason to believe that any instances of weave welding identified by the Stiners involved material which requires Charpy impact testing.
C. Thomas Brandt County of Somervell)
Subscribed and sworn to State of Texas
)
before me this /A day of July, 1983.
i e 'k bdsw Notary Publiit' U
8307250359 830721 PDR ADOCK 05000445 O