ML20077B655

From kanterella
Jump to navigation Jump to search
Original Signature Page to Util 830715 Summary of Record Re Weave & Downhill Welding
ML20077B655
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 07/15/1983
From: Brandt C
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20077B645 List:
References
NUDOCS 8307250359
Download: ML20077B655 (1)


Text

f t which have this requirement are the main steam and feedwater lines. Consequently, the piping runs in each of the areas were reviewed and it was determined that if main steam or feedwater pipe is in those areas there are no integral attachments to those pipes requiring Charpy impact testing. Accordingly, there is no reason to believe that any instances of weave welding identified by the Stiners involved material which requires Charpy impact testing.

C. Thomas Brandt County of Somervell) Subscribed and sworn to State of Texas ) before me this /A day of July, 1983.

i e 'k bdsw Notary Publiit' U 8307250359 830721 PDR ADOCK 05000445 O PDR