y Northem States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401 1927 Telephone (612) 330-5500 November 17,1994 NRC Generic Letter 94-02 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Supplemental Response, NRC Generic Letter 94-02, "Long-Term Solutions and Upgrade of Interim Operating Recommendations for Thermal-Hydraulic Instabilities in Boilina Water Reactors" The purpose of this letter is to provide the completion information for requested action 1.a of NRC Generic Letter 94-02 in accordance with reporting requirement 2 of the Generic Letter. The Generic Letter requested licensees to submit information regarding actions being taken to address thermal-hydraulic instabilities in boiling water reactors. Monticello provided a response to Generic Letter 94-02 by letter dated September 9,1994.
Requested action 1.a of the Generic Letter states:
Ensure that procedural requirements exist forinitiation of a manual scram under all operating conditions when all recirculation pumps trip (or there are no pumps operating) with the reactorin the RUN mode, and ensure that operators are aware of the potential for very large power oscillations and the potential for exceeding core thermal safety limits before automatic p.otection systems function following the trip of all recirculation pumps (the procedural manual scram is not necessary after long-term solutions are approved and implemented forindividualplants.
Reporting requirement 2 of the Generic Letter states:
If the licensee plans to take an action requested, or a substitute action, within thirty (30) days of the completion of the action, inform the NRC, in writing and 2Rflf)R
[/dk' 941'280307 941117
- PDF, AcOCK 0500o263 r'
PDR 9
- NORTHERN STATES POWER COMPANY November 17,1994 Page 2 under oath of affirmation, of the action taken and verify its completion or implementation.
In our September 9,1994 submittal we committed that operating procedures would be revised and operator training provided prior to the end of.1994 to require initiating a manual reactor scram under all circumstances in which there are'no recirculation pumps operating while the reactor is in the RUN mode. These actions have been completed.
This letter contains no new NRC commitments, Please contact Marv Engen, Sr Licensing Engineer, at (612) 295-1291 if you require further information.
b ih770mn
]r kro 4
s William J Hill Manager Monticello Nuclear Generating Plant c:
Regional Administrator-111, NRC NRR Project Manager, NRC i
Sr Resident inspector, NRC
)
State of Minnesota Attn: Kris Sanda i
J S:lberg
Attachment:
Affidavit to the United States Nuclear Regulatory Commission
UNITED STATES NUCLEAR REGULATORY COMMISSION NORTHERN STATES POWER COMPANY MONTICELLO NUCLEAR GENERATING PLANT DOCKET NO. 50-263 Supplemental Response, NRC Generic Letter 94-02, "Long-Term Solutions and Upgrade of Interim Operating Recommendations for Thermal-Hydraulic Instabilities in Boilina Water Reactors" Northern States Power Company, a Minnesota corporation, hereby provides the 30 day completion information for Requested Action 1.a of Generic Letter 94-02.
This letter contains no restricted or other defense information.
NORTHERN STATES POWER COMPANY b'
YAbe By vv William J Hill ~
Manager Montice!!o Nuc! ear Generating Plant On this /7 day of oT4Ae4
/77Y before me a notary public in and for said County, personally appeared William J Hill, Manager, Monticello Nuclear Generating Plant, and being first duly sworn acknowledged that he is authorized to execute this document on behalf of Northern States Power Company, that he knows the contents thereof, and that to the best of his knowledge, information, and belief the statements made in it are true and that it is not interposed for delay.
k IM
'!1331275 TRANSMITTAL MANIFEST.
NORTHERN STATES POWER COMPANY NUCLEAR LICENSING DEPARTMENT MONTICELLO NUCLEAR GENERATING PLANT Supplemental Response, NRC Generic Letter 94-02, "Long-Term Solutions and Update of Interim Operating Recommendations for Thermal-Hydraulic Instabilities in Boiling Water Reators" Manifest Date: November 18, 1994 R O Anderson, Dir LMI, SAC USNRC,.
. e ;,
LAttn s; Doc ' Control Desk T E Amundson, Dir NQD, SAC E L Watzl, VP Nuc Gen Regional Admin-III,NRC J K Gilchrist, LMI
- Dan Weger.er Beth Wetzel, NRR-FM
- Jeff Olson Steve Ray, SR Res Insp, NRC
- Marv Engen
. State of Minn Attn: Kris Sanda NL Monti Plant File J E Silberg USAR File Yes_X_ No NRC Commitment Yes No X Monti Document Control File Response Reminder Yes No X[
~
W J Hill, Plant MGR, SAC, OC Monti OC Sec Yes_X_ No 10 C A Schibonski, GSE, OC Monti SAC Sec Yes_X_ No 6
M F Hammer, GSM, OC Monti Posting Yes No_X_
7*
J E Windschill, GSRS, OC Ext Comm Dept Yes No_X_
M W Onnen, GSO, OC L E Brehm (LERs & Inspection Rpt)
L H Waldinger, GM MNGP, SAC D E Larsen, NGSS GSE, OC L L Nolan, GSSA, OC B D Day, MGR MTC, OC Operating Experience Coord W A Shamla, NQD
- Advance Distribution Correspondence Date November 17, 1994
NRC Correspondence Manifest instructions Document: Go
?cco t4RC fr /-. W 42-0V U
Manifest:
k N Advance Dist.
Additional Dist:
Delete Dist:
D w Ve a e.m u a
Tc,% Olsom O CJ &w a
Special Manifest Requirments USAR Yes N
No (Send copy to Kaleen Hilsenhoff)
NRC Commitment Yes No x
(Send copy to Steve Ludders)
Resp Reminder Yes No k
R:spl. Start Date:-
1Re.s[Perio'd -
f Resp;Due.DateV
~
Actiosi:
iLi.c
Contact:
f Resp Start Date Resp Period Resp Due Date Action:
Lic
Contact:
Resp Start Date"
- Resp Period" TR6sp Due Date Action:
.,Lic
Contact:
Resp Start Date Resp Period Resp Due Date Action:
Lic
Contact:
Monti OC Sec Yes K
No (10 copics to L Imholt, withhold distribution to OC ID addressees)
Monti SAC Sec Yes b
No (1 copy to SAC Sec File,4 Copies to non-NSP SAC members in weekly mailing)
Monti Posting Yes No M (7 advance dist copies to J McNabb)
[
l Ext comm Dept Yes No l
NSP H \\WORDVMOCORRW AN FORM DOC