1 OPERATING DATA REPORT DOCKET NO.
50-244 DATE W _O' 1983 COMPLETED BY E. W e m
Andrew E. bhNamn'a-1 (315) 524-4446 TELEPilONE OPERATING STATUS Ext. 301, at G1nna
- 1. Unit Name:
GINNA STATION. UNIT #1 Notes 'Ihe unit remained shut-
- 2. Reporting Period:
May, 1983 down at the end of the report 1520 period for Annual Refueling
- 3. Licensed Thermal Power (MWt):
49
- 4. Nameplate Rating (Gross MWe):
and Maintenance.
470
- 5. Design Electrical Rating (Net MWe):
490
- 6. Maximum Dependable Capacity (Gross MWe):
4
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level to Thich Restricted, if Any (Net MTe):
- 10. Reasons For Restrictions, if Any:
This Month Yr. to-Date Cumulative 744 3,623.00 118,439.00
- 11. Ilours In Reporting Period 0
2,001.08 88,887.23
- 12. Number of Ilours Reactor Was Critical 0
0 1.631.32 *
- 13. Reactor Reserve Shutdown flours 0
1,998.0 86,978.13
- 14. Ilours Generator On-Line 0
0 8.5 *
- 15. Unit Reserve Shutdown Ifours 0
2,921,472 119,504,026
- 16. Gross Thermal Energy Generated (Mill) 0 955,257 38,922,054
- 17. Gross Electrical Energy Generated (MWil) 0 907,546 36,893,608
- 18. Net Electrical Energy Generated (MTil) 0%
55.15%
73.44%
- 19. Unit Service Factor 0%
55.15%
73.44%
- 20. Unit Availability Factor 0%
53.30%
68.12%
- 21. Unit Capacity Factor (Using MDC Net) 0%
53.30%
68.12%
- 22. Unit Capacity Factor (Using DER Net) 0%
.99%
8.38%
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
- 25. If Shut Down At End Of Report. Period, Estimated Date of Startup: June 17, 1983
- 26. Units In Test Status (Prior to Commercial Operation):
Forecas t Achieved Lb INITIAL CRITICALITY INITIAL ELECTRICITY
\\
COMMERCIAL OPERATION Cwmulative 'Ibtal comencing January 1,1975
.....,,, a y.
in.,
8307220178 830608 PDR ADOCK 05000244 R
. ^ *
. AVERAGE DAILY UNIT POWER LEVEL l
DOCKET NO.
50-244 UNIT
- 1, Ginna Station DATE J u_n g, 8, 1983 COMPLETED BY A F- - E. hFrfg - -.
Andrew E. McNamara 1
1 TELEPHONE 1 (315)'524-4446 Ext. 301 at Ginna MONTH May, 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) l 17.
1.
18.
2.
19.
3.
20.
4.
21.
5.
22.
6.
23.
7.
24.
8.
25.
9.
26.
l 10.
27.
11.
l 28.
12.
29.
13.
30.
I 14.
l 31.
15.
16.
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
D(X:KET NO.
50-744 t!NITNAME '81 Girna Station t
DA rE _ June 8' 1983 UNIT SHUTDOWN AND POWER REDUCTIO.NS
_- - #E* Al_ tl2M '
l COMPLETED HY S Arsir69 E.
May, 1983 1 (315) 524-4446' REPORT MONTil liLEPilONE Ext. 301, at'Ginna m
O e
N
. EO Licensee e,
gm Cause & Corrective 52 o
e No.
Date jj
} g,g j Event j.g g,j Action to g
Report #
yj
!u Prevent Recurrence e
gz g
e 2
g u
C
'Ihe unit remained shutdown at the end of the report period for Annual Refueling and m intenance.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1 -Manual for I reparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & l.icense Examination F-Administrative G-Operational Error (Explain) u 4...
in s v. ine.
Il-Other (Explain)
Exhibit 1 - Same Source
I e.
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-244 UNIT _Ginna Station, Unit #1 DATE J u n e._ 8, 1983 COMPLETED BY. 4 Y-e f, />f(yfe. _ _. _~'
Andrew E. McNahara TELEPHONE 1 (315) 524-4446:
EXT. 301 at Ginna MONTH May, 1983 The unit remained shutdown at the end of the report period for Annual Refueling and Maintenance.
4 l
l l
t I
t i
i 1
e
r Page 5
-GINNA STATION Maintenance Report Summary May, 1983 During the month of May, routine maintenance and inspections
-were completed, along with maintenance scheduled during the Refueling Outage.
Safety-related_ maintenance included:
1.
Annual maintenance and inspection of the 1A and 1B Emergency Diesel Generators, and cleaning of both Diesel Fuel Oil Storage Tanks.
2.
Replacement of Boric hcid Piping and valves on both 1A and 1B Boric Acid Transfer Pump Discharges, and a section of piping on a pressure tap off of the outlet of the Boric Acid Filter.
3.
Minor ~ inspections were completed on the 1A and 1B Safety Injection Pumps, the 1A CV Recirc. Fan, the 1B Motor Driven Auxiliary Feedwater Pump, the 1A and 1B RHR Pumps, the 1B Component Cooling Water Pump and the Personnel Airlock.
4.
Inspection and Testing of Hydraulic Snubbers.
5.
Calibration of Reactor Protection Channels.
6.
Inspection, maintenance and test of 480 Volt Breakers and Reactor Trip Breakers.
7.
Inspection and maintenance of the Boric Acid Transfer Pumps.
8.
Preventive replacement of various valve diaphragms on CVCS Valves.
9.
Maintenance and mechanical seal conversion of the 1A Component Cooling Water Pump.
10.
Inspection and maintenance of the 1A, 1B and 1C Service Water Pump Discharge Check Valves.
11.
Replace "C"
Incore Detector and repair the "D"
Detector Drive Unit.
12.
Replace manual Blowdown Isolation Valves 5701 and 5702.
13.
Inspect and rework check valve internals on the Standby Auxiliary Feedwater Pump suction lines per vendor recommendation.
l w.
>w if + 6 :.
p Page 6 14.
. Inspect and clean. Buses 13 and.15.
15.
Majorfinspection'and maintenance of the -1B CV Recirc.. Fan and Motor.
- 16.. Isolation and inspection-of #12 - Transformer, and associated relay maintenance and testing.-
117.- -In'spection and maintenance on RCS sample valves 955,.953 ar.d 951.
18.
Inspection and repacking of various primary an'd secondary.
systems valves.
- 19.
, Inspection and maintenance on Instrument Air and Nitrogen
. supply systems in Containment.
20.
Ma'intenance support for Refueling activities including
' Reactor Vessel Head Disassembly and reaseembly,. inspection and cleaning ~of vessel studs, fuel handling system ~ checkout,
- lifting rig inspections, cavity seal ring placement, Reactor
' head-cable inspection, clean and install vessel 0-rings, reconnect reactor head vent' valves, reinstall control rod
~ drive ventilation system, reinstall' seismic supports on reactor. head, remove cavity filtration system, decontaminate and clean the reactor cavity, and replace the fuel transfer tube gasket'and flange.
21.
Steam Generator maintenance included replacement of J-nozzles:
on both Steam Generator Feedrings, installation of tube
~
sleeves' in both Steam Generators, repair of ' leaking explosive tube: plugs in the "B" Steam Generator, removal and plugging of'one tube in the."B"-Steam.G'enerator, and water lancing both Steam Generators before and after secondary side main-tenance.-
t i
/
I l
///
J
~
J '. * * ** s
- , n
. -+
yartC'TGi t:::-+
Rf6$td/ BEY
.;;fYny
- ?
\\ >~
657 ROCHESTER GAS AND ELECTRIC CORPORATION
- 89 EAST AVENUE, ROCHESTER, N.Y.14649 T E L E P e4 0 N E
..t. c cn. 64e.2700 GINNA STATION June 8, 1983
' Director, Office of Management.Information and Program Analysis U.S. NUCLEAR REGULATORY COMMISSION Washington, DC 20555
Subject:
Monthly Report for May, 1983 Operating Status Information R.
E. Ginna Nuclear Power Plant Unit No. 1 Docket No. 50-244
Dear Sir:
Pursuant.to our Technical Specification 6.9.1, attached herewith is the monthly. operating status report for Ginna Station for the-month of May, 1983 l
Very truly yours, Bruce A.
Snow Plant Superintendent BAS /kdg Attachments cc:
Mr. James M. Allan NRC (1)
\\
p