ML20076N446
| ML20076N446 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 06/13/1983 |
| From: | Might A, Will Smith, Svensson B INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| To: | NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| NUDOCS 8307220008 | |
| Download: ML20076N446 (8) | |
Text
.
t.. d x. _..
$m 3
4.u'..
...... CPIRA :NC DATA R*? ORT
~
DCC*-:.1 NO. 50-316 DATI 6-2-83 CO.%L*LITIO IY A. Mioht TIL.I?.SCNg (316)465-5901 c? nT!NG s ATus DONALD C. COOK 2
Nons
- 1. Uai:b.:me:
MAY 1983
- 2. Repor:is;? :fod:
3411
- 3. Licensed TI ---' ?ower (5tW:):
1133
- 4. N==eplair.h:i=; (Cross atWe): _
1100
- 5. Desi e: Ee==i=1 R::ing (Nec 11We):
t 1I10
- 4. S'. : :u:::Depe=d:h!e Csp ci:7 (Cross 51We):
1082 T. Siaxi==m De---Ahle C:p:=i:7 (Net 31We):
S. If Ch:n;es 0 =::in C:pz=i:y R::i:;s (1:n..s.%mbs:3 Throgh 7) Sine: L:s:Repor:. Give R= sons:
- 9. Power Leve! To Whi:h Rer= iced. !! Any (Ne: 5tWe):
- 10. Re: sons For R..=i::!a:s.If Asy:
This Stonth Y to-Data Cu=u!:tive 744 3,623 47,447
- 11. Hou. s != Repo:.!s; P :fod
- 12. Nu=her Cf Hou.:s R==:r W:s C:i:i=1 744 3,145.5 33.958.9 0
0 0
- 13. Re===r Rese:Te Shu:down Hou=
- 14. Eou.:s Gene =:s Cn.L*=r 744 3.065.8 33.027.5
- 15. Uni: R.se:we Sh::tdown Hoc:s 0
0 0
- 16. Cross The:=:.1 E :::y Cene:-red (5tWM) 2.461.540 10.007,138 106.271.369 816.880 3.317.220 34,274,970
- 17. Cross Ele==i=!Iser;y Gener :=d e,5tWH)
- 13. Net Ee==i=1I==:;y Gene =: d C. WE) 788.913 3.203.322 33.043.114 100 84.6 74.0
- 19. Unit Serrice.::::or 100 84.6 74.0
- 20. Uni: Av-il2 bili:y Fx:or 98.0 81.7 69.8
- 21. Uni: C:::ci:y 7:::=r (Usi=: 3!rC Net)
- 22. Unit Cae: city. :cor (Using DER.4ets 96.4 80.4 68.9 0
0.8 12.9
'3. Unit Forced ou::ge R:t,
- 24. Sh:tdovms Scheduled Over Nec 6 Ston:hs (Type. Oste.: d C==:icn of I:cht:
- 25. If Shu: Down At End Of Report Period. Esti==:ed Date of Star::p:
.25' Units la Tes: S:::us iPnor to C====!:1 Ope =: font:
Forec=st Achieved INITIAL CRIT *CA LITY
~
INiTTAL I'.ICTR:01 Y COS.'.;I?.C:A:. 0?I?.A 7:0N 7
guf ;g 8307220008 830613 1 '2L
(
PDR ADOCK 05000316 R
@7 ;. -
~
AVERAGE DATLY UNIT POWER LEVEL DOCKET NO. 50-316 UNIT 2
DATE 6-2-83 COMPLETED BY A. Might TELEPHONE (616) 465-5901 MONTH May,~1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-Net)
(MWe-Net) 1 1103 17 1103 2
1102 Ig 1091 3
1088 19 1101 4
1093 20 1102 5
1101 21 1096 6
1100 22 1101 1099 7
23 1090 8
1102 24 1098
~
9 1101 25 1095 10 1101 25 1097 l
11 1101 27 1089 l
12 1099 28 880 13 1049 29 1024 14 537 30 1056 15 883 31 1088 16 1101 INSTRUCTIONS l
On this format list the average daily unit power level in MWe-Net for each day in the reporting month. Ccmpute to the nearest whole megawatt.
~
3M)CKE I NO. 5_0-316 IINlf Silll'IDOWNS AND POWER REDlH"IIONS llNil' NAhlE D.C. Cook - Unit 2 DA'IE 6-13-83 COkiPI EIED isy B. A. Svensson MAY, 1983 Hll*OR I &IONill TEl.LPilONE 616/465-5901 SHEET 1 of 1 1
h 'y:.
'b
!E I iccusce E 8,,
Cause a ronective No.
D ale R
13 @
_E s $
livene gy e
At n.ni co 3 iyi F liepent #
- E O E'
Psevens Hecinscate P
u g
O 125 830513 S
0 B
4 N.A.
CH ZZZZZZ Reactor power reduced to 54% to re-move the east main feed pump turbine from service to permit replacement of the hydraulic fluid in the turbine control system due to contamination with lubricating oil. Reactor power was returned to 100% on 830515.
126 830528 F
0 A
4 N.A.
CH ZZZZZZ Reactor power reduced to 54% to re-move the east main feed pump turbine from service to repair tube leaks in the F.P.T. condenser. One tube was plugged. Reactor power was returned to 100% on 830530.
t 4
l 1
2
_I 1
1: 1 enceil Reason; hicilioil:
linintut G Institutions S. Silicainleil A 1 einspinesis l ailuie (Laplain)
I hlannat fin Pacguaation of Data 15 klainicnance or Test 2 klannat Sciain.
Enisy Sliceis fue I itensee C Hefueling l Antoinatic Ssam.
livens l<epos 18 l'RI I ile INilRI G-D Regulainey itesinicsson 1 Hilies (limplanal ill fil i l' Opeulos I'sanning & I st cuse 1:xaminalfori ItAilmentslaatsve 5
G Opesaisonal 1.nos IExplaint I Alnt>is 1 - Same Sonice 08// /)
ll Ot her Il!xplain) 4
m UNIT SHUTDOWNS AND POWER REDUCTIONS INSTRUCTIONS This report snould des;n:e 211 plant shutdowns during the ut m:ordance uth de (2:le apceanng on de report form.
report penod. In addit:on, tt snould be the sour:: of expt =-
If:stegory 4 must be used. supply bnef:cmments.
suon of signzdeant dips m 2verage power levels. Es:h sigm.
L!CENSEE EVENT REPORT :. Referen:e de app'u=ble
$:2nt reducuon m power level (3 rester dan OM reducucn m sverage dany power level for the pre: ding 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />) repor:sble oc:urrence pensemg to it outage or ;ower reducen. nn:: de :,:rs: : ur pans (event yest. sequent:21 sou!d be noted, even thcugh te umt may not have been shut down completely!. For sus reducuens :n power level.
report numcer, o::urrence ::de sad report type) or tne uve tne durstion should be !!sted :s zero.the medod of reducucn part desi;nstion as desenbed :n Item 1, et Instru;::cns tot should be listed as 4 (Other). 2nd de Cause and Corte:nve Pre;2rsuon of Dats Entry Sheets for L::ensee Event Reper:
Acuen to Prevent Re:urrence ;olumn should explsm. The (LER) File tNUREG-0161). Th:s infor=2uon may ::ot be Cause sad Corre:uve Acuen to Prevent Re:unence column immediately ev: dent :or 2d such shutdowns. of : curse, smee should be used to provide any needed explanation to fully further mvest:gation may be rece: red to ascertam whether or desence the cir:umstan;es of tne outage er power reduction.
not a reportso!e oc:urrence was involved.) If the outage or power reduc: ion will not result m a repor: sole oc:urrence.
NUMBER. T*-is :olumn should ind!=:e the secuenti:1 nu=,
the positive 9tdi:suert ei this !:ck of :orte!2t:en should be her ass:gned to each shutdown or sigmilcant redue' tion m power noted as not applic:ble (NiA).
for that eslendar year. When a shutdown or sigmcesnt power SYSTEM CODE. The, system in whid the outage or pcwer reduenon begms m one recort pened and ends m another.
ndum n ong:nated should be noted.my the two p..
de or.
g:t co an entry should be made for both report penods to be sure Ex&oit G. Instmuons *or Paparsuu of Data nm antes si snutdowns or sigrud: ant power redu: dens are reported.
for Licensee Event Report (LER) r, u,e (NLREG4161)
Unt:1 a unit has 2dieved its 6:st power ;eneration, no num.
ber snould be assigned to each entry.
Sys: ems mat do not St any existmg ode shouic te deups-ted XX. The ;oce ZZ should be u:ed f:r those events where DATE. This column shou'd indics:e the date of the start a system is not appa:2cle.
of each shutdown or sigmil:2nt power reducuen. Report as year. =cnth, and asy. August 14.1977 would be repor:ed COMPONENT CODE. Seis:: de most apptcpnate :omponent as 770514 When a shu:down or sigmfleut power adu con from Exh: bit I.1:s: ucuens for Preparsuen of Data Ent:3 begms m one report ;er:od and ends :n anomer. an entry should Sheets for Licensee Event Report (LER) Fde (NUREC4161),
}
be made for both report penods :o be sure all srtutdowns usmg the followmg :ntiena:
or s:g:uS snt power reductions are reported.
A. If a corrponent f2: led.use the component dire::!y:nvolved.
l TYPE. Use -F" er "S" to indicate either " Forced" or "Sde.
duled." respe:dvely, for each shutdown or significant power B.
If not a :omponent fadure. use de reisted ecmponent:
reducuen. Ferced shutdowns include those required to be e.g., wrong valve oeersted througn error: !!st valve as mitiated by no later than the weekend followmg discovery component.
of an off. normal condition. It ts re:cgni:ed that some judg.
ment is required in estegonz:ng shutdowns in th:s way. In - C.
If a dain of fattures occurs. e nrst component :o mai-general, a for:ed shutdown is one that would not have been function should be listed. The secuence or, events.mciud; compic:ed in the absen:e of the =ndition for which :orrecuve ing the other :omponents which rad, snou,d,:e des:nbe..
r seuen was taken.
under the Cause and Correcuve Acuan to P: event Recur.
tence column.
DURATION. Self-explanatory. When a shutdown extends C me nents that do not fit any existmg : ode snould be de.
beyond the end of a report penod. count only the uma to the signated XXXXXX. The code ZZZZZZ should be used for.
end of the report pened and pick up the ensumg down time events where 2 component designauon is not appts: sole.
m the foi!cwmg report penods. Report durauon of outages rounded to :ne nearest tenth of an hour to facditate summancn.
CAUSE & CORRECTIVE ACTION TO'. PREVENT RECUR.
the sum of the total outage hours plus the hours the genera-RENC.,.. L.se the :clumn :n a narrat:ye rasluon :o ampiify or tor was on line should equal the gross hours in the reportmg aan t e mstances oMe snutdown or power nacum.
d" d~
The column sncuid include the soec:d: :suse for each snut.
down or stgmnant power reducuan and the immediate anc
-REASON. Catesonze 5v :etter demnanun m ae:ordan:e
- ' " " **
- N '"*
- M "'
with de rabie aipearme ^vn the report form. If :stegory H ste. Th:s ciumn in uld also be used for a desenpt:en or tne must 5e used. suepiv bnef eumments.
maior safety.relsted correenve main:enance performed dunna
- he ou:see or power redue:icn in:!uding an : denude: tion of METHOD OF SHUTTING DOWN THE REACTOR OR the enual pad acuvny and 2 epan or any saga messe.f REDUCING POWER. Categonee ov numner des:ansuun
~
radtosenvity or smg!e tsdisuon ex:csare spee:6aily ssee:.
4 1%e that this differs trom the Edison E:e :n: Insutute atec with the out:ge wruch accounts for more tnan 10 :ereent iEEI) defminons or " Forced Paru 1 Outsge" and "Sene.
of de 2ilowso;e 2nnual values.
- uled P:rual Outae For these tenn>. eel uses 4 s.hange or For long textual reports centmue nattsuve on secar:te : scer
~
.0 MW as the creai ;mmt. For larger power rese:urs.30 MW
.nd rereren.e the shutdown or power re:u nun (J "m
.5 rm. mall a.hange to wanant espu.nanoo.
narrative.
@i" 94-e v
y e-*1 e.*---
-y e
a-q.
1est-e a
g e---e m..m 3
r7- = = -
p---
v-e
t Docket No.: 50-316 Unit Nims:
D. C. Cook Unit 2 Completed By:
R. S. Lease Telepbone:
(616) 465-5901 Date: 6/7/83 Page:
1 of 2 A
MONTHLY OPERATING ACTIVITIES - MAY 1983
,ll Highlights:
,'a,,
si L The Unit entered the reporting period operating it 100% power and remained //
in service for the entire reporting period. Ther'e were five power '
'?
reductions with return to 100%. These are detailed in the Summary.
/'l Total electrical generation was 816,880 MWH.-
f' Summary:
,I >
5/3/83 Unit power reduction was initiated at 0916 nours. Train"B"ofthe)[
Solid State Protection System (SSPS) of Reactor Protection had bee 6 bypassed for 58 minutes for surveillance testing and it was evident that the testing would exceed the G hour allowed by the Technical Specifications. The testing had id_entified a problem with one of the Solid State Boards. The failed board was identified, replaced
/
and tested. The Reactor Protection System was returned te normal at 0924.
Power reduction had been less than 1% by this time, so the' Unit was immediatelv reloaded to 100%.
j
,i 1 5/4/83 Reactor power suddenly reduced to 97% at 0910 hours0.0105 days <br />0.253 hours <br />0.0015 weeks <br />3.46255e-4 months <br /> as the Boron
j{
Injection Tank (BIT) was being'. test pressurized.
It was immediately realized that the power reducti,oh was due to leak through of Boric jr[
Acid from the BIT and the pressurization stopped. Further testing
' l indicated that the pressurization had been performed too s1owly.
A more rapid pressurization causLJ the BIT outlet valvfs to -seal off t ~ J ~
Reactorpowerwasreturnedtoj00%. Total time below 100% was 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
9 5/5/83 The East Residual Heat Renoval Pump and the North Safety Injection '
PumpweredeterminedtobeinoperablebytheInServiceInspect)3on r
j (ISI) Program. These pumps were in this inoperable status for-hours while they were retested ar.d found to be within the limits '
/
of the ISI Program.
5/13/83 Unit power was reduced to 54%.over a 1-3/4 hour ramp starting at 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br />. The East Main Feedpump was removed from service to drain, clean and refill the Turbine Hydrauli^c Fluid Reservoir. _
- n This cleaning and replacement had beccme necessary due to the Hydraulic Fluid becoming contaminEted by inleakage of lubricacing oil. WhiletheTurbine/Pumpwsou(ofserviceaHydraulicrelay '
that interfaces the Hydraulic Fluid and Lubricating 011 Circuits.
was replaced because it was suspect.ed..of cross-leakage.
5/15/83 The East Main FeedpuMp was raturned tv, service at 0245 hours0.00284 days <br />0.0681 hours <br />4.050926e-4 weeks <br />9.32225e-5 months <br />, but-loading was maintained at the 54% level due to low customer demaid. -
Wh_
m N,
~,ry-r (c
.i.
Dockst No.: 50-316 Unit NImet D. C. Cook Unit 2
~
Completed By:
R. S. Lease k
4
. Telephone:
(616) 465-5901 i
Date:
6/7/83 h
Page:
2 of 2
,1 s.
9
[<
TheUnitwasreturnedto100%powerovega7 hour ramp starting at Of'O hours.
4 5/27/83 TheReheaterCoilswereremovedfromserdiceat0623hourstocheck for suspected coil leaks. The two north coils in the right hand Reheater were identified to have developed leaks. Of the eight
,-Q coils four are now known to have problemst,
d j
5/28/83 Unit, power was reduced to 95% over a h hour ramp starting at 0006 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> in anticipation of placing the Rehet4ter Coils in service. Due L'
to other,s&ation problems the coils were'not placed in service and the
>Tll Unit wJs reloaddl td 100% over a 2/3'..hSr ramp starting at 0340 hours0.00394 days <br />0.0944 hours <br />5.621693e-4 weeks <br />1.2937e-4 months <br />.
g
(
Unit powed v$ef reducLd to 54% over a;I hour ramp starting at 1155 hours0.0134 days <br />0.321 hours <br />0.00191 weeks <br />4.394775e-4 months <br />
'y/ t
/
to remove tt: N ast Main Feedpump frem; service to plug a leaking O /
~
condenser tube *. The,pupp was returned to service and the Unit loaded to 95% power frer a 7 hour8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> ~ ramp starting at 1728 hours0.02 days <br />0.48 hours <br />0.00286 weeks <br />6.57504e-4 months <br />.
,s, e
<s g
5/30/83 The Reheater' Coils were.Ipla,ced in seivice at 1320 hours0.0153 days <br />0.367 hours <br />0.00218 weeks <br />5.0226e-4 months <br />. All eight
-f coils were returned to, service operating'at reduced coil pressure.
.s r Unit loitding was returned /;o 100' power over a 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> ramp starting at 1411 hsars.
Main condenser halfs were but of service, one half at a time, for a total of 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> during the rep 6cting period for identification and repair of, circulating 6ater ILaks.
f:
~~
The Control Room Cable Vault "Halon" Fire Suppression System remained inoperable for the' entire reporting pe-fod while additional testing
{,,
- was conducted.
y
(
P 6,,
p
-) /
/
r
/, -
j.
.3
,M k
. j s/
ls
,c'
'_g, "Y
e#
j m,
a g
9 A
b S
4
~
,e m
V f
pp e~
+,.,
-y p,
l.
.; 3 DOCKET NO.
50 - 316 UNIT NAME D. C. Cook - Unit No. 2 DATE 6-13-83
- ~
COMPLETED ~BY B. A. Svensson.
\\,
g TELEPHONE (616) 465-5901
\\
PAGE 1 of 1
)
s hi
,,.x y;
,. 2, ' '
MAJOR SAFETY-RELATED MAINTENANCE
[
.,a.
t',
f
j MAY. 1983
%[
5 6,
.,s M'-l' "
The seal witer' supply check valve for the hydrogen monitoring 1
'3
,' 't system, NS 262, leaked by during a waste gas leak test. Dis-s k' f '
assembled the valve, cleaned and checked the seating surfaces and reassembled the valve.
x
+
a.
M-2Y,TkkewestESWpumpsuctionstrainerwouldnotshift.- Both
/
' strainer outlet valves, WRV-774 and WRV-764, were found to be
'. f j
leaking by.
Cleaned the internals and repacked WRV-774.
Re-
'f built WRV-764. Had the valves and the strainer tested.
M-3 No. 4 boric acid transfer pump discharge pressure was low.
Adjusted the pump impeller clearance and had the pump retested.
JJ"'
C&I-l Solid-state reactor protection system train B, logic switch D, position 13, was inoperable via the test signal. Universal logic card A212 was replaced and the system was satisfactorily
.n cented. Total time out of service was 21 minutes.
s
~
3 I s.3 i
p.
]j\\
L' t
A 3
s
'a
(
k
\\
r
?
i s
i t
4 k
~ }^\\
l
- ?), fj i
y.\\
gs e
'g t
6 94 t
(-I h
r 1,
~.
j
'l
-q
I:
4 I
g:
" INDIANA & MICHIGAN ELECTRIC COMPANY DONALD C. COOK NUCLEAR PLANT P.O. Box 468, Bridgman, Michigan 49106 (616) 465-5901 June 13, 1983 Director, Office Of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Gentlemen:
Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.6, the attached Monthly Operating Report for the Month of May, 1983 is submitted.
Sincerely, 7
W. G. Smith, Jr.
Plant Manager WGS:ab Attachments cc:
R. S. Hunter J. E. Dolan M. P. Alexich R. W. Jurgensen NRC Region III E. R. Swanson R. O. Bruggee (NSAC)