ML20076N205

From kanterella
Jump to navigation Jump to search
Forwards Midland Independent Design & Const Verification Program, Second Monthly Status Rept for 830528-0630
ML20076N205
Person / Time
Site: Midland
Issue date: 07/15/1983
From: Levin H
TERA CORP.
To: Jackie Cook, Eisenhut D, James Keppler
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III), Office of Nuclear Reactor Regulation
Shared Package
ML20076N208 List:
References
ISSUANCES-OL, ISSUANCES-OM, ISSUANCES-ON, NUDOCS 8307210225
Download: ML20076N205 (3)


Text

\\/.

Jh 2h&.

[

l EE;sE;Ev D A?.t-5 Ei'E:DA E '3

~ SE DE. '/2 ; tdW Giv I'N E ':* ~

Ci 40-339 July 15,1983 3). 33 0 Mr. James W. Cook

/

Vice President petit 4ctPAL STAFF Consumers Power Company AAgbEr:F '

/(fdf 3 1945 West Pornoll Road oh1A scs v

A/RA i

?AO

()

Jackson, Michigan 49201 OPRP' 5 !,0, d

Mr. J. G. Keppler MM-Administrator, Region Ill 0RMSF "M

Office of Inspection and Enforcement i

U.S. Nuclear Regulatory Commission FM E

799 Roosevelt Road Glen Ellyn,il 60137 Mr. D. G. Eisenhut Director, Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 Re: Docket Nos. 50-329 OM, OL and 50-330 OM, OL Midland Nuclear Plant - Units I and 2 Independent Design and Construction Verification (IDCV) Program Second Monthly Status Report Attached is our second Monthly Status Report covering the period from May 28, 1983 through June 30,1983. Included in this report are:

e Introduction and Purpose e

Midland IDCV Program Status Summary Programmatic Activities (including project chronology)

Design Verification Activities Construction Verification Activities Confirmed and Resolved item Reports, Finding Reports and Finding e

Resolution Reports Financial Status Report (CPC only) e Sin ere

).

Howard A. Levin Project Manager Midland IDCV Program cc:

See Attoched Sheet 9307210225 830715 E 18 gt gg DR ADDCK 05000 TERA CORPORATION 7101 WISCONSIN AVENUE BETHESDA. M ARYL AND 208'4 301 654 6060 1

[

r

(

.e..

e

. cc:

L. Gibson, CPC F. Buckman, CPC D. Miller, CPC D. Hood, NRC -

J. Taylor, NRC, l&E J. Clements, Bechtel F. Levondoski, B&W IDCV Service List i

l W

t a

f l-4 f'.

f l.~

w. w n~

p L

Service List for Midland Independent Design and Construction Verification Program cc: Harold R. Denton, Director Ms. Barbara Stamiris Office of Nuclear Reactor Regulation 5795 N. River U.S. Nuclear Regulatory Commission Freeland, Michigan 48623 Washington, D. C.

20555 Mr. Wendell Marshall James G. Keppler, Regional Administrator Route 10 U.S. Nuclear Regulatory Commission, Midland, Michigan 48440 Region III 799 Roosevelt Road Mr. Steve Gadler Glen Ellyn, Ill~nois 60137 2120 Carter Avenue St. Paul, Minnesota 55108 U.S. Nuclear Regulatory Commission Resident Inspectors Office Billie Pirner Garde Route 7 Director, Citizens Clinic Midland, Michigan 48640 for Accountable Government Government Accountability Project Mr. J. W. Cook Institute for Policy Studies Vice President 1901 Que Street, N.W.

Consuners Power Company Washington, D. C.

20009 1945 West Parnall Road Jackson, Michigan 49201 Charles Bechhoefer Esq.

Atomic Safety & Licensing Board Michael I. Miller, Esq.

U.S. Nuclear Regulatory Commission Isham, Lincoln & Beale Washington, D. C.

20555 Three First National Plaza, Sist floor Dr. Frederick P. Cowan Chicago, Illinois 60602 Apt. B-125 6125 N. Verde Trail James E. Brunner, Esq.

Boca Raton, Florida 33433 Consuners Power Company 212 West Michigan Avenue Jerry Harbour, Esq.

Jackson, Michigan 49201 Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Ms. Mary Sinclair Washington, D. C.

20555 5711 Summerset Drive Midland, Michigan 48640 Mr. Ron Callen Michigan Public Service Commission Cherry & Flynn 6545 Mercantile Way Suite 3700 P.O. Box 30221 Three First National Plaza Lansing, Michgian 48909 Chicago, Illinois 60602 Mr. Paul Rau Midland Daily News 124 Mcdonald Street Midland, Michigan 48640

.L

'