ML20076N154

From kanterella
Jump to navigation Jump to search
Forwards Central Files & Public Versions of Revised Epips. Central Files Version of Revised EPIPs Withheld
ML20076N154
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 10/31/1994
From: Maxfield G
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19312B553 List:
References
PBL-94-0341, PBL-94-341, NUDOCS 9411090243
Download: ML20076N154 (1)


Text

.t e

6 Wisconsin Electnc POWER COMPANY Point Beoch Nuclear Plant 6610 Nuclear Rd., Two Rivers, WI 54241 (414) 755-2321 PBL 94-0341 October 31,.1994 Document Control Desk U.S. NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, DC 20555 Gentlemen:

QQCKET NOS. 50-266 & 50-301 EMERGENCY PLAN IMPLEMENTING PROCEDURES POINT BEACH NUCLEAR PLANT, UNITS 1 &2 Enclosed are copies of revised procedures to the Point Beach Nuclear Plant Emergency Plan Implementing Procedures Manual. The Procedures consist of changes which should be filed in your copies of the subject document in accordance with the attached instructions.

Please note that the procedures containing names and telephone numbers are stamped "NRC ONLY, NOT FOR PUBLIC DISCLOSURE." A copy of the affected procedures, with names and numbers deleted, are provided and stamped " NAMES AND TELEPHONE NUMBERS DELETED" to assure confidentiality and facilitate your i

distribution to the public documents rooms.

Sincerely,

^

i G. J..

ield Manager

+$

gah Enclosure

]

cc:

NRC Resident Inspector (w/o/e)

Incident Response Center, Region III

$ r.

h j

9411090243 941031

~

Gr, hg,)

PDR ADOCK 05000266 d,/Yol?:iwtu i

,gp mein-> on ennu v

-