Stephen E. ouinn Vice Preaicent I

Consohdated Edtson company of New York,Inc.

Indian Point Station j

Broadway & Bleakley Avenue October 28,1994 Buchanan. NY 10511 Telephone (914) 734-5340 Docket No. 50-247 j

Document Control Desk US Nuclear Regulatory Commission Mail Station P1-137 Washington, DC 20555

SUBJECT:

Response to Operational Safeguards Response Evaluation (O.S.R.E.)

This letter responds to the concerns identified during the Operational Safeguards Response Evaluation (O.S.R.E.) that was conducted by your office at the Indian Point Unit 1 and 2 site from March 25 to March 30,1994.

The findings of the O.S.R.E., which were identified in your letter of August 31,1994 as Part I, Operational Safeguards Readiness review, are responded to in Attachment A of this letter.

As a result of this intensive inspection, a review of our training program is in progress and a number of areas mentioned in the report have been addressed. We are continuing to look at the remaining matters and will implement appropriate modificanons upon the completion of this review.

10 CFR Section 73.21 provides that correspondence and reports to and from the NRC which relate to the physical protection of power reactors, including the information enumerated in subsections (b)(1)(1) through (xiii) of 10 CFR Section 73.21, are to be protected from unauthorized disclosure, in accordance with these requirements, we therefore understand that the Attachment A will not be placed in the Public Document Room and will receive limited distribution.

Should you have any questions regarding this matter, please contact Mr.

Charles W. Jackson, Manager, Nuclear Safety and Licensing.

Very truly yours,

+& C s -

a 3[0 SAFEGUARDS INFORMATION g

Attachment contains Safeguards information, upon separation this page is

(

decontrolled.

9411070132 941028 PDR ADOCK 05000247 F

PDR

~

9 cc:

Mr. Thomas T. Martin Regional Administrator - Region i 1

US Nuclear Regulatory Commission i

475 Allendale Roa1 King of Prussia, P/ 19406 i

i Mr. Francis J. Williams, Jr., Project Manager (w/o attachment)

Project Directorate 1-1 i

Division of Reactor Projects 1/II US Nuclear Regulatory Commission

+

Mail Stop 14B-2 Washington, DC 20555-Senior Resident inspector US Nuclear Regulatory Commission PO Box 38 Buchanan, NY 10511 l

i 4

i i

t

?

i l

l l

i j

t l

l 1-l-

gi,y;p m 7 cc " p c 1:!F.'

Tc;15 Flu.c i.L:.:.-..:-. :.

-