ML20076M186

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Rev 2 to Emergency Plan Implementing Procedure EPIP-5.01, Transportation of Contaminated Injured Personnel & Rev 2 to EPIP-4.20 Health Physics Actions for Transport Of... Personnel
ML20076M186
Person / Time
Site: Surry  
Issue date: 09/14/1983
From: Dewandel E
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML18141A155 List:
References
NUDOCS 8310110268
Download: ML20076M186 (2)


Text

-

ry &

  1. 7 VIRGINIA (L(CTRIC ANo POWER COMPANY Surry Power Station P.O. Box 315 Surry,Virginie 23883 USNRC September 14, 1983 DIVISION OF EMERGENCY PREPAREDNESS. I AND E MS-AR-5011' WASHINGTON, DC 20555 SURRY POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURES Enclosed are recently revis;i pages to the Surry Power Station Emergency Plan Implementing Procedures. Please take.the following actions in order tc keep your manual updated with the most recent revisions.

EPIP 5.01 Transportation Of Contr.minated Injured Personnel Remove and Destrov Enter Entire Old Procedure Entire Procedure E. P. DeWandel Records Management Supervisor EPD/dkp Attachments n.

M 8310110260 831005

/.//

PDR ADOCK 05000200

/

PDR F

)

.4

\\

PCO VIRGINIA ELECTRIC AND PoWE A COMPANY Surry Power Station

)

P. O. Box 315 Surry, Virginia 23883 USNRC September 14, 1983 DIVISION OF EMERGENCY PREPAREDNESS I.AND E

,MS-AR-5011 WASHINGTON, DC 20555 SURRY POWER STATION EMERGENCY PLAN IMPLEMENTING PROCED!MtES Enclosed are recently revised pages to the Surry Power Station Eme gency Plan Implementing Procedures. Please take.the following actions in order to keep your manual updated with the most recent revisions.

EPIP-4.20 Health Physics Actions For Transport Of Contaminated Injured Personnel Remove and Destroy Enter Pa'ges'1, 2, 3, 4, 5, Pages 1, 2, 3, 4, 5, 6, 7, 8, 9 & Act. 5 6, 7, 8, 9 & Act. 5 pg. 1 pg. 1 P

/

E. P. DeWanael Records Management Supervisor

.a EPD/dkp Attachments Yd w-g g,,

y

-m,--

y-g

--,--y

,,--y,

1

.4 g.;..nw VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION EMERGENCY PLAN IMPLi!MENTING PROCEDURE NUMBER PROCEDURE TITLE hEVISION 02 EPIP-5.01 TFJNSPORTATION OF CONTAMINATED INJURED PERSONNEL PA CE, (With No Attachments) 1 of 4 i

PURPOSE To provide actions to be taken when contaminated injured person (s)

)

require transport to an offsite medical facility.

I USER Shift Supervisor or Station Emergency Manager.

ENTRYCON0lTIONS Any one of the following conditions exist:

1.

Activation by another EPIP; 9.R 2.

Concaminated injured person (s) requiring offsite medical treatment; 9.R-3.

Any time deemed necessary by Shife Supervisor or Station Emergency Manager.

REVISION RECORO REV. 00 PAGE(S): Entire Procedure DATE:07-29-82 REV. 01 PAGE(S):

1 of 4 and 2 of 4 DATE:04-15-83 REV. 02 PAGE(S): Entire Procedure DATE:SEP 1 2 1993

~~"

REV.

PAGE(S):

DATE:

i.

REV.

PAGE(S):

DATE:

FIV.

PAGE(S):

DATE:

REV.

PAGE(S):

DATE:

APPROVAL RE ENCEO APPROVED DA TE

/

t 3 fv%

G: REVIEW SEP 121383 CHAIRMANSTA TION NUCLEAR CAFETY O

AND OPERATING COMMITTEE k

s fy 8,

7*

g

.~ n

ese. orsen:o NUMBER PROCEDURE TITLE REVISION 02 l

EPIP-5.01 TRANSPORTATION OF CONTAMININATED INJURED PERSONNEL 2 of 4 STEP ACTION / EXPECTED RESPONSE PESPONSE NOTOBTAINED 1.

INITIATE EPIP-5.01:

a)

BY:

DATE:

TIME:

2.

VERIFY PERSONNEL CONTAMINATED INJURED:

a) Assure HP-3.6.1. Personnel a) Direct Health Physics to Injurv-ACTIVATED initiate HP-3.6.1, Persennel Injury, then GO TO Stap 3,.

3.

VERIFT AtBULANCE:

a) Insurt First-Aid Team a) Verify offsite rescue Member obtains ambulance personnel notified if key from Security onsite ambulance NOT available l

b) Insure ambulance is brought to required location 4.

REQUEST NIGE!INGALE l

AIR AMBULANCE:

a) If requested by first aid a) IF,NOT requested then team call Nightingale Air GO TO Step 5.

Ambulance at 1-800-527-4354 for transport to Medical College of Virginia Dd

ND.97047210

=

NUMBER PROCEDURE TITLE REVISION 02 EPIP-5.01 TRANSPORTATION OF CONTAMININATED INJURED PERSONNEL 3 of 4 STEP ACTION / EXPECTED RESPONSE RESPONSE NOTQBTAINED 4.

(CONTINUED) b) Provida dispatcher with the following information

1) Your name
2) Title
3) Call back number NOTE: Nightingale response time to Surry Training Center Field is approximately 25 minutes.

5.

INITIATE EPIP-4.20 H.P.

Actions For Transport of Contaminated Injured Per-sone _el.

NOTE: Do not notify Medical College of Virginia (MCV) of contaminated injured personnel being transported until ambulance has left the site.

NOTE: Continue with EPIP-1.01 Step 3 for Classification and Notifications 6.

INITIATE MCV-VEPCO RADIA-TION EMERGENCY PLAN:

a) Major radiation emergency-a) IF_ minor radiation emergency-GREATER THAN 10, victims LESS THAN 10, victims call call 9-1-786-0958 9-1-786-9834 AND b)

Provide MCV following GO TO Step 5.b.

information

~

l i

1) Time of accident l

l i

7c

Ns. 97847210 NUMBER PROCEDURE TITLE REVISION 02 EPIP-5.01 TRANSPORTATION OF CONTAMININATED INJURED PERSONNEL 4 of 4 fSTEPl ACTION / EXPECTED RESPONSE RESPONSE NOTOBTAINED 6.

(CONTINUED)

2) Number of victims
3) Severity of injuries
4) Number of neutron irradiated victims
5) Estimate of dose s

received by victims

6) Estimated time of arrival at MCV 7.

NOTIFICATION:

Initiate EPIP-2.01, Notifi-cation of State and Local Governecuts 8.

TERMINATE EPIP-5.01:

a) Close-Out

1) COMPLETED BY:

DATE:

TIME:

b) Forward EPIP-5.01 to SUSOC for review

--.:n END

so vestm VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION l

EMERGENCY PLAN IMPLEMENTING PROCEDURE N'IMBER PROCE00RE TITLE REVISION EPIP-4.20 HEALTH PHYSICS ACTIONS FOR TRANSPORT OF 02 CONTAMINATED INJURED PERSONNEL PACE

.~

(With 5 Attachments)

PURPOSE To provide guidance for health physics personnel accompanying a contaminated injured individual to an offsite medical facility, i

USER l

Health Physics Technician.

ENTRYCONulTiONS Any one of the following:

1.

Activation by Station Abnormal ~ Procedure.

2.

Activation by Ststion Health Physics Procedure.

3.

Activation by another EPIP.

l l

t l

REVISION RECORD l

REV. 00 PAGE(S): Entire Procedure DATE:07-29-82 REV. 01 PAGE(S):

1 of 7, 6 of 7, and 7 of 7 DATE:02-24-83 REV. 02 PAGE(S):

1,2,3,4,5,6,7,8,9,& Act. 5 pg. 1 DATE:SEP 1 :: bsJ REV.

PAGE(S):

DATE-REV.

PAGE(S):

DATE:

REV.

PAGE(S):

DATE:

REV.

PAGE(S):

DATE:

APPROVAL P' C NCEO APPROVE 0 QA TE

.3 W SEP12*2 HAIRMAN STA TION NUCLEAR SAFETY N yy AND GPERATING COMMITTEE

NO.97887250 NUMBER PROCEDURE TITLE REVISION 02 EPIP-4.20 EEALTH PHYSICS ACTIONS FOR TRANSPORT

  1. ^ ##

OF CONTAMINATED INJURED PERSONNEL 2 of 9 STEP ACTION / EXPECTED RESPONSE RESPONSE NOTO8TAINED 1.

INITIATE PROCEDURE:

a)

BY:

DATE:

TIME:

2.

OBTAIN SURVEY RESULTS:

a) Obtain any previous survey a)

I_F,NO, prior survey results results on victim available. C0 To Step 3.

3.

DISCONTINUE DECONTAMINATION:

IF,it has been determined a)

F that the individual is to be transported off-site:

1) Discontinue decontamination effort AND
2) Prepare for transportation 4.

PREPARE INDIVIDUAL FOR TRANSPORTATION:

a) E individual is grossly a) E contamination is local-contaminated:

1:ed, GO TO Step 4.e.

1) Continue with this instr-uction b) Spread blanket _or sheet over stretcher i.

c) Place contaminated indi-c)

IF, unable to move indivi-vidual on top of the dual from stretcher:

blanket or sheet

1) Wrap stretcher and individual in blanket or sheet.

4 l

NO. 97887210 NUMBER PROCEDURE TITLE REVISION 02 EPIP-4.20 HEALTH PHYSICS ACTIONS FOR TRANSPORT OF CONTAMINATED INJURED PERSONNEL 3 of 9 1

(

i STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED 4

(CONTIh"JED) i d) Wrap blanket or sheet loosely around individual e)

I_F, contamination is localized e) C0 To Step 5.

I minimize spread of contamina-tion by covering area with cloth or sheet 5.

REPLACE DOSIMETRY:

a) Remove individuals:

1) Dosimetry and
2) Record self-reader on b) Replace TLD and self-reading dosimetry c) Send self-reader and TLD to dose control d) Assess the need for personnel d) E dosimetry NOT needed, dosimetry for the rescue GO TO Step 6_.

squad member

1) Issue dosimetry to squad members 6.

OBTAIN SUPPLIES:

a) Obtain, if possible, the following list of supplies h.

and equipment prior to' transport:

1) Poly bags wa-

No. 9706V210 NUMBER PROCEQURE TITI.E REVISION 02 EPIP-4.20 HEALTH FHYSICS ACTIONS FOR TRANSPORT PACE OF CONTAMINATED INJURED PERSONNEL 4 of 9 STEP ACTION / EXPECTED RESPONSE RESPONSE NOTQBTAINED 6.

(CONTINUED)

2) Cleaning rags (diapers)
3) Gloves and booties
4) RM-14 with a HP-210 probe and portable gamma survey instrument 7.

MINIMIZE SPREAD OF CONTAMINATION:

a) Advise the medical personnel of radiation and contamination problems with the individual b) Advise, if necessary, the use of protective clothing (i.e., gloves) while per-forming first aid e) Monitor all equipment or material used on the indi-vidual 8.

DETERMINE METHOD OF TRANSPORTATION:

a) Ambulanco used a) E NigLeingale Helicopter is to be used accompany ambulance to training center field and g H Step de b) Direct ambulance driver to take Route H West c) Take I-95 North (Richmond -

Petersburg Turnpike)

~'

d) When close to Richmond, use to direct driver to MCV from I-95 i

na

,--e-e c

m

__-y

. no.neen:o NUMBER PROCEDURE TITLE REVISION 02 EPIP-4.20 HEALTH PHYSICS ACTIONS FOR TRANSPORT OF CONTAMINATED INJURED PERSONNEL PAGE 5 of 9 STEP ACTION / EXPECTED RESPONSE RESPONSENOT QBTAINED 8.

(CONTINUED)

~

1) Leave I-95 North at Exit M. Broad Street
2) Turn right on College

$treet

3) Turn left on East Marshall Street
4) Continue across 12th Street and then left into MCV parking lot 9.

PERFORM SURVEY:

a) On route to M'V:

C

1) Perform survey of the containment individual
2) Record data on Attachments 1 and 2 b) Decontaminate the individual as much as medical status allows (i.e. - remove con-taminated clothing) 10.

RELAY VITAL INFORMATION TO MCV:

a) Use the HEAR system in route to provide:

1) Medical information
2) Radiological information
3) Estimated time of arrival
o

r

^

  • 5so.978872:0 NUMBER PROCEDURE TITLE REV/S10N 02 EPIP-4.20 HEALTH PHYSICS /CTIONS FOR TRANSPORT 0F CONTAMINATED INJURED PERSONNEL 6 of 9 STEP l ACTION / EXPECTED BESPONSE RESPONSE NOTOSTAINED
11.,

MONITOR RESCUE SQUAD PERSONNEL:

a). Prior to arrival at MCV:

1) Monitor the rescue squad members for contamination J_F, members are found to be b) E members are NOT contam-b)

F contaminated:

inated, GO TO Step M.

1) Use protective clothing to minimize spread AND
2) Request use of decon-tamination facilities at MCV upon arrival 12.

RELAT RADIOLCG1 CAL INFORMATION:

a) Upon arrival at MCV:

a) E the Emergency Plan for MCV is NOT initiated:

1) Relay radiological infor-mation to the Incoming
1) Contact the MCV Hospital Monitoring Specialist in Superintendent (770-5025)

Area A (see Attach =ent 4) 0.R,

2) Radiation Safety Director in Area B_

b) Request the need for further assistance or information required by the Radiation Safety Director c) Report arrival time at MCV to Surry Control Room (357-7035) n -2

m.oresn:o NUMBER PROCEDURE TITLE REv'ISION 02 EPIP-4.20 HEALTH PHYSICS ACTIONS FOR TRANSPORT PACE OF CONTAMINATED INJURED PERSONNEL 7 of 9 STEP ACTION / EXPECTED RESPONSE RESPONSE NOTOBTAINED 13.

MONITOR TRANSPORTING VEHICLE:

a) Survey the vehicle inside and outside b) E the vehicle is found contaminated outside

1) Decon before return to the station c) E vehicle is found to be contaminated on the inside:
1) Return to the station for further decontamination 14.

ADMINISTRATION:

a) Gather all information and survey results b) Present all in2 ore:ation and survey results to the Radio-logical Assessment Director upon arrival at the station l

15.

TERMINATE EPIP-4.20:

a) COMPLETED BY:

DATE:

l TIME:

N=

M

,y-esn+--

p, y

y a, - -

7--,

-,,---g

.-y

,,y-

+

o,

,-y..

9

  • N3.97887210 NUMBER PROCEDURE TITLE REVISION 02 EPIP-4.20 HEALTH PHYSICS ACTIONS FOR TRANSPORT PACE OF CONTAMINATED INJURED PERSONNEL 8 of 9 STEP ACTION / EXPECTED RESPONSE RESPONSE ACTOBTAINED 16.

PERFORM SURVEY:

a) On route to training center field

1) Perform survey of the contaminated individual
2) Record data on Attachments 1 and 2 b) Decontaminate the individual as much as medical status allows (i.e. - remove contaminated clothing) 17.

FORWARD SURVEY AhD SUPPLIES a) Give Attachment I and 2 to Nightingale Crew.

b) Give Attachment 5 to i

Nightingale Crew.

I c) Give radiological supplies from ambulance to Nightingale j

Crew.

j l

d) Give RM-14 with HP 2.10 probe to Nightingale crew NOTE: HELICOPTER SAFETY RULES l

1) Never approach aircraft until signaled to do so by the pilot
2) Never approach aircraft when blades are in motion
3) Never approach aircraft from the rear
4) Never open or close doors on aircraft

~

^

5) Keep the landing area clear of spectators
6) Protact your eyes from debris which may be thrown up p

y.

e c

-p.-

py s-y 7--,

y e-r4 ar 7

w e

ND,97887210 NUMBER PROCEDURE TITLE PEVISION 02 EPIP-4.20 HEALTH PHYSICS ACTIONS FOR TRANSPORT OF CONTAMINATED !NJURED' PERSONNEL 9 of 9 STEP ACTION / EXPECTED RESPONSE RESPONSE NOTOBTAINED 18.

ADVISE BELICOPTER CREW a) Dosimetry requirements if any b) Protective clothing requirements if any j-19.

TEFRINATE EPIP-4.20 a) COMPLETED BY:

DATE:

TIME:

1

(

l END l

l l

,...:a a

~Y p

1---

w

-w

- < - -+

9t m

te--e m--

e en e-w--e*

v e

,r

~

' No. 97687220 NUMBER A TTACHMENT TITLE REVIS10N EPIP-4.20 02 GUIDELINES FOR HELICOPTER CREW A TTACNMENT PAGE 5

1 of 1 THE FOLLOWING GUIDELINES ARE PROVIDED TO HELP YOU MANAGE THE RADIOLOGICAL PART OF THIS EMERGENCY 1.

RELAY INFORMATION TO MCV a)

Medical Information b)

Radiological Information (use survey sheets given you) c)

ETA 2.

MONITOR YOURSELF AND YOUR SUPPLIES WITH THE INSTRUMENT PROVIDED 3.

IF YOU DETECT CONTAMINATION USE PROTECTIVE CLOTHING TO MINIMIZE SPREAD AND REQUEST USE OF DECONTAMINATION FACILITIES AT MCV UPON ARRIVAL 4.

RELAY RADIOLOGICAL INFORMATION UPON ARRIVAL AT MCV TO INCOMING MONITORING SPECIALIST OR RADIATION SAFETY DIRECTOR 5.

PONITOR TRANSPORTING VEHICLE (HELICOPTER) a)

Survey the helicopter inside - instruments or anything that may have come in contact with patient b)

Survey the helicopter outside - this should not be necessary unless recommended by VEPCO c)

If helicopter is found to be contaminated inside return to Surry Power Station for decontamination 6.

PLACE ALL DISPOSABLES THAT CAME INTO CONTACT WITH THE PATIENT IN THE YELLOW PLASTIC BAG, SEAL IT AND RETURN IT TO SURRY POWER STATION 7.

RETURN RM-14 WITH HP-210 PROBE TO SURRY POWER STATION.

n-n

__g m

p----w-.m--

-,-w 3-

,w