.s' Mailing Addrats
- Atacama Power Company iSCO North 18th Street
. Post Office Box 2641
- 8irmingham Alatama '5291
.,Teiephone 205 783-6081 2.,
F. L Clayton, Jr.
Senior Vice President 3
Flintndge Bui' ding AlabamaPower the sauthern 6eanc sys:em September 7, 1983 Docket Nos. 50-348 50-364 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Attention: Mr. S. A. Varga Joseph M. Farley Nuclear Plant - Units 1 and 2 Licensing Items Requesting NRC Approval Gentlemen:
Attached for your information is a status of all licensing items identified in Alabat,a Power Company's letter dated January 13, 1983.
This status is provided on a monthly basis and updated to include any additional submittals requesting NRC approval. Each updated or revised item is identified by a sideline in the margin. New outstanding items identified since January 13, 1983 are included in the attachment supplement.
If you have any questions, please advise.
l Yours very tru i
f h) &
\\
Q by 1
(,
F. L. Clayton, Jr.
FLCJr/GGY:lsh-039 Attachment cc: Mr. R. A. Thomas Mr. G. F. Trowbridge Mr. J. P. O'Reilly Mr. E. A. Reeves Mr. W. H. Bradford f@f Dr. I. L. Myers
[
h
(.
8309150151 830907 PDR ADOCK 05000340 l
p PDR
ATTACHMENT Page 1 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL SEPTEMBER 7,1983 FIGOSED EllE IIEQESTED AC11R APCo APCo NtC NtC SJMITTAL SEMITTAL APPL 0 VAL APPROWAL TAC ITEM MTE MTE MIE MIE iDNtk5
- 1. tbvable Control Rod Assnblies for 02<22-8 03-04-83 07.-15-83 APto 49951 FrP 1 and 2 (T.S. 3/4.1.3) 06-03-83 requested 4%S2 07-m-83 date past due
- 2. Charcoal Filters for Fff 1 ard 2 03-0143 03 "A-83 03-01-83 NCo 4W53 Note 1 (T.S. 4.7.7. 4.7.8 and 4.9.14) raquested 49954 date past We
- 3. River Water Syster. for FfP 1 and 2 N/A 1?-LT 07-01-63 APCr>
49374 (T.S.3/4.7.5) rerpstej 49375 date past We
- 4. Diesel Generator Overload Test for N/A 08-03-82 07-01-83 49374 FNP1and2(T.S.4.8.1.1.2.c.5) 12-30-82 10-01-83 49375 06-03-83
- 5. BIT Reiction for FfP 1 and 2 N/A 12-30-82 03-31-83 03-15-83 N/A C01PLETE (T.S.3/4.5.4) 03-04-83 03-18-83
- 6. Turbine Valve Surveillance for FfP 2 N/A 10-08-82 12-01-82 48973 APCo to (T.S. 3/4.3.4) 12-10-82 11 8 sutrnit ad-01-18-83 ditional in-05-31-83 fonmtion by 09-15-83
- 7. RCS Pmssum Isolation Valves N/A 08-10-82 07-01-83 AFC0 48714 tbte 1 for FNP 1 and 2 (T.S. 3/4.4.7.2 12-23-82 requested 48715 and3/4.4.7.3) date past se
- 8. Mechanical Snubber Functional Test N/A 11-05-82 12-01-T 01-31-83 N/A C04PLETE Ennption for FNP 1 (T.S.4.7.9.e)
- 1. The 30 day Federal Register notification requirenst of 10 CFR 50.91 has delayed fRC @pmval bqyond APCo requested date.
- 2. Delay of appmval will adversely affect the FNP 2 Refueling Outage in S@teTber 1983.
- 3. Delay of approval could pmcipitate a special outage.
4, Delay of @ proval could preclude startup of each unit after mfueling.
ATTACHMENT Page 2 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL SEPTEMBER 7,1983 ROGED ETIPL REQESHD ETIAL APco Arto mc mc SilMITTM.
SIMITTAL APR O M.
REM 4tKS
- 9. Waste Gas Hydrogen /0ggen Analyzer 12-01-83 06-01-84 for FiP 1 ard 2 (T.S. Table 4.3-9)
- 10. ISI/IST Licensing Program
- a. Unit 1 Inservice Inspection (ISI)
Pmgran for A9E Code Class 1, 7 and 3 Comonents
- 1) Relief Requests on vessel N/A tW 17-81 01-01-83 08-24-83 48559 COWLETE l
cladding exaa:inations 01-10-83
- 2) Relief Requests on hydm-01-18-83 01-28-83 09-01-83 APCo 49547 static test mquimmmts mquested
& te past We b Unit 2 Inservice Inspection (ISI) Program for A9E Code Class 1, 2 and 3 C mponents
- 1) Revision 0 Relief Requests N/A 07-25-80 09-01-83 APCo 51033 Note 2 06-20-83 requestal date past due
- 2) Relief Requests on vessel N/A 01-10-8 09-01-83 0B-24-83 49373 COMPLETE cladding examinations 06-20-83
- 3) Relief Request on hydro-01-18-83 01-28-83 09-01-83 APCo 51062 tbte 2 static test mquirtrents.
06-20-83 nquested date past We
- 1. The 30 day Federal Register notification mquirtrent of 10 CFR 50.91 has delayed tRC @pmval beymd APCo requested date.
- 2. Delay of @pmval will adversely affect the FNP 2 Refueling Outam in S@teter 1983.
- 3. Delqy of @ proval could pmcipitate a special outage.
- 4. Delay of @pmval could preclude startup of each unit after mfueling.
ATTACHNENT Page 3 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL SEPTEMBER 7, 1983 FROF0 SED ACilE IBJESTED ACilE AFCo AFCo NIC NtC SilMITTAL Sl1MITTAL APRIOVAL APPRDWAL TAC ITEM MTE MIE MTE MTE 10.
RMRKS
- c. Unit 1 Inservice Testing (IST)
Pnyyam for At4SE Code Class 1, 2 arki 3 Corponents
- 1) Revision 2 Relief Requests N/A 04-21-W 03-15-83 05-02-G N/A EMR.ETE See Iten 10, Pag 2 of Suppleent
- 2) Revision 3 Relief Rquests N/A 07-15-81 03-15-9 054 PAG N/A QNPLETE See Its 10, Pa y 2 of Supplecent
- 3) Revision 4 Relief Requests N/A 10-25-E 03-15-83 05-02-83 N/A EMPLITE See Item 10, Page 2 of
- d. Unit 2 Inservice Testing (IST)
Pmgram for ASE Code Class 1, 2 and 3 Caponents
- 1) Revision 0 Relief Requests N/A 03-12-80 02-15-83 01-08-83 N/A CQiPLETE 06-20-83 See Item 10, Page 2 of Supplenent
- 2) Revision 1 Relief Rquests N/A 03-17-82 02-15-83 04 8 N/A CQiPLETE 06-20-83 See Iten 10, Page 2 of Supplenent
- 3) Revision 2 Relief Requests N/A 08-06-82 02-15-83 04-08-83 N/A QNPLETE 06-20-83 See Iten 10, Page 2 of Supplenent.
- 1. The 30 day Federal Register notification mquimment of 10 CFR 50.91 has delayed PRC appmval txymd APCo requested date.
- 2. Delay of appmval will adversely affect the FNP 2 Refueling Outage in Septenber 1983.
3, Delay of @ proval could pmcipitate a special outage.
- 4. Delay of appmval could preclude startup of each unit after mfueling.
ATTACHMENT Page 4 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL SEPTEMBER 7,1983 RWOSED ACRML REIRESTED ACRAL APCo AFCo RC mC SllMITTAL SIMITTAL APFR00L APR MAL TAC ITEM MIE MTE MTE MIE 10.
IBMS
- 11. Spent Fuel Pool Storage Additions N/A 03-19-82 11-01-82 01-15-0 N/A W1PLETE for FtP 1
- 12. CMnge 18 Month Ir.terval to 01-01-83 04-05-83 10-01-83
[bnied 51408 COFMETE i(efueling 06-22 0 51409
- 13. Meteorological Torer Surveillance 02-01-83 01-24-83 08-01-83 APCo 51437 tbte I for FfP 1 and 2 (T.S. 3/4.3.3.4) nquestei 51438 date past che 14 In-Core Thinbles for FfP 1 and 2 N/A N/A N/A N/A N/A Requires no (T.S.3.3.3.2) tRC action
- 15. Safety Evaluttions for Next fuel Reloads:
- a. Unit 1 tpflow flodification N/A 08-16-82 N/A N/A N/A Requims no tRC action
- b. Unit 1 Cycle 5 03-14-83 03-17-8 N/A N/A N/A RegJires no tRC action
- c. Unit 2 Cycle 318 Month Fuel 09-01-83 09-02-83 N/A N/A N/A Repires no Cycle fRC action
- 16. F delta H and Positive Moderator 10-15-83 02-01-84 Tameratum Coefficient
- 17. Containnent Sprqy N/A N/A N/A N/A N/A Requires no tRC action
- 18. Tedinical Specification Optimi-07-01-84 zation-Westin(fiouse Nners Group l
- 19. Safety Related Battery Changes 04-15-83 05-03-83 11-03-0 51631 07 8 51629 l
l
- 1. The 30 day Federal Register notification mquirenent of 10 CFR 50.91 has delayed fRC @ proval beyald APCo mquested date.
- 2. Delay of @ proval will adversely affect the FNP 2 Refueling Outage in Septeber 1983, i
- 3. Delay of approval could pmcipitate a special outage.
- 4. Delay of approval could preclude startup of each unit after mfueling.
ATTACHMENT Page 5 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL SEPTEMBER 7,1983 ROOSED ERE REI)fSTED EllE APCo APCo NtC NtC S11MITTAL SIMITTAL APROVAL APIH0 VAL TAC IIIM MIE MIE MIE MIE fo.
RD#RKS
- 20. Rod Swap Test During Low Power 03-01-83 03-01-83 N/A N/A N/A Ragdru no Physics Testing tRC action
- 21. Red Drop Timing During Lov Po,er 07-01-M N/A N/A N/A Rapitu in Prysics Testing E action
- 22. Auto Rod Contml Abovu 9f]'. Ptwr il/A 01-11 d3
%U143 0324-Ed NA CMETE for Unit 2, Cycle 2 and thit 1, 3 32 12-01-82 Cycle 5
- 23. thit 2 Licensing Deletim 01-12-83 61-37-83 N/A N/A N/A Requires no Acen&ent Clarification Lettur PCC action
- 24. FS/R Update 07-01 83 074)1-83 N/A N/A N/A Requiree ro tRC action
- 25. Adninistrative Changs
- a. Accunulator and ECCS Subsysten 02-01-83 02-01-83 09-01-83 APCo 49184 for FNP 1 and 2 (T.S. 4.5.1.1 nquested 49185 (c) and 4.5.2.(a))
date past We
- b. Generic Letter 82-17 on Audit N/A 10-25-82 03-01-83 APCo 49068 of Energency Plan for FNP 1 mquestal 49069 and 2 (T.S. 6.5.2.8.e) date past
&e
- c. fiechanical and Hydraulic 06-01-83 05-27-83 09-01-83 APCo Note 1 Smbber Lists for FNP 1 mquested (T.S. Table 3.7-4Aand date past 3.7-4b)
We
- 1. The 30 day Federal Register notification mquirenent of 10 CFR 50.91 has delayed tRC @pmval beymd APCo mquested date.
- 2. Delay of appmval will adversely affect the FNP 2 Refueling Outage in Sgtehr 1983.
3 Delay of appmval could pmcipitate a special outage.
4.,
Delay of approval could pmclude startup of each unit after mfueling.
ATTACHMENT Page 6 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL SEPTEMBER 7,1983 REF0 SED ACTIML REGESTID ACilW.
AFCo NCo NtC NtC Sl1MITTAL SIMITTAL APFROVAL APPROVAL TAC ITEM MIE MTE m1E IRIE 70.
RDMRKS
- d. Administrative Changes for FNP 03-01-83 02-01-8 09 8 APCo 49184 1 and 2:
08 23-83 requested 49185 date past
- 1) Fire Detectors Table 3.3-12 che
- 2) RlR Isolation 4.5.2.d.1
- 3) River Water Sury 3/4.7.5
- 4) Yard Fire Hydr 6nt Table 3.7-7
- 5) S(rvice Water Battery Note 2 4.8.2.5.2(d)
- 6) Organization CMrt Figure 6.2-2
- e. Unit 2 Pressurizer Sensor TaWe C3-01-83 02-01-83 09 01-83 AFCo 49185 (T.S.3.3.3.7) requested date past che
- f. Unit 1 Refueling Outage Chancy: 03-01-83 02-01-83 09-01-83 APCo 49184 Containrent Vent requestal date past me
- g. Turbine Building Hydraulic N/A 12-10-82 09-01-83 APCo 49287 Snubbers for FrP 2 nquested date past che h.
Incorporation of Licensing N/A 11-24-82 09-01-83 APCo 49182 Requiru:ents for FNP 2 nquested date past
- 1) FtP 2 License Cordition che 2.C.(17) - Ccntairvient Vent Line
- 2) Mechanical Snubber List for FtP 2 (T.S. Table 3.7-46)
- 1. The 30 day Federal Register notification requirtrent of 10 CFR 50.91 has delayed tRC approval beyond APCo requested date.
- 2. Delay of approval will adversely affect the FNP 2 Refueling Outage in S@tenber 1983.
- 3. Delay of approval could precipitate a special outage.
- 4. Delay of approval could preclude startup of ech unit after refueling.
ATTACHMENT Page 7 STATUS OF LICENSING ITEMS REQUIRING NRC APPROVAL SEPTEMBER 7, 1983 FIOPOSED ACTIE REQESTED ACilM.
AFco AFco mc mc SIMITTAL SIMITTAL APIROVAL APFROVAL TAC ITEM MIE MIE MIE MIE 10.
IB WRKS
- 3) FNP 2 License Cmdition 2.C.(19)(b) - Containntnt Overcertent Prutection
- i. Org3rdratioq Change to Offsite N/A 11-16-E 09-01-83 AFCo 51999 Frmprcnt for FTP 1 and 2 06-29-83 mquested 52000 date past die
- 1. The 30 day Federal Register notification mquirment of 10 CFR 50.91 has delayed WC appmval txyond APCo mquested date.
- 2. Delay of approval will adversely affect the FNP 2 Refueling Outage in S@teter 1983.
3, Delay of approval could pmcipitate a special outage.
- 4. Delay of appmval could pmclude startup of each unit after mfueling.
ATTACHMENT SUPPLEMENT Page 1 LICENSING ITEMS REQUESTED SUBSEQUENT TO APCo's JANUARY 13, 1983 LETTER SEPTEMBER 7, 1983 PRWOSED ACTUAL REQESTED ETURL APCo APCo RC NtC SimITTAL SMITTAL APIROVAL APPROVAL TAC ITEM MTE MIE MIE MIE M).
REMRkS
- 1. Adninistrative Changes N/A 02-01-83 09-01-83 APCo 49184 rapestal 49185
- a. Engineered Safety Actuation date past System Instruentation We ACTION Statenait 20 Error
- b. Security Plan Audit Freqwncy
- c. Envircuatal Qualification (FNP1)
- d. Augnented Lw Pmer Test Pmgran (FIP 2)
- 2. Turbine Valve Surveillance N/A 05-27-83 07-29-83 07-15-83 N/A CQ1PLETE One-Tine Change (T.S. 3/4.3.4) 06-20-83 08-01-83 for FtP 2 07-13-83 07-18-83 07-15-8
- 3. Snubber Visual Inspection 06-17-83 06-17-83 10-01-83 51891 Note 1 & 3 One-Time Change (T.S. 3/4.7.9) 06-20-0 07-08-83
- 4. Enviromental Qualification N/A 05 8 10-14-83 Note 4 Extension Request OB-24-83
- 5. Italtiplant Action Item B-32 N/A 04 8 09-01-83 APCo 49184 riquested 49185 date past me
- 6. River Water System One-Tine N/A 06-20-83 08-03-83 08-02-83 N/A C0'1PLETE Technical Specification Change 06-20-83 06-29-83
- 1. The 30 day Federal Register notification mquirtrent of 10 CFR 50.91 may delay EC approval beyond APCo requested date.
- 2. Delay of approval could adversely affect the FNP 2 Refueling Outage in S@teter 1983.
3 Delay of approval could pmcipitate a special outage.
- 4. Delay of approval could pmclude startup of each unit after mfueling.
ATTACHMENT SUPPLEMENT Page 2 LICENSING ITEMS REQUESTED SUBSEQUENT TO APCo's JANUARY 13, 1983 LETTER SEPTElWER 7, 1983 IHOFOSED ACTIML RESESTED ACilML Nto AFCo fRC NtC SLEMITTAL SMITTAL APFROVAL APmDWAL TAC ITEM MTE mlE MIE MTE 70.
RElWtkS
- 7. RCS Pmssum Isolation N/A 06-20-83 08-15-83 APCo 51990 Note 2 Valve One-Tice Technical 07 8 nyested Specification Change date past for Unit 2 dm
- 8. Hydraulic Snubber List 60 days after 07-01-EM for Fff 2 startup follcwing the Unit 2 2nd R. O.
- 9. Unit 2 Inservice N/A 0B-04-83 09 01-83 APCo fbte ?
Inspection Program, requested Relief Request on date past first 40-montn We Reactor Vessel Examination
- 10. Relief Request Appeal, N/A 03-12-80 09-01-8 APCo 52015 Note 2 Unit 1 and Unit 2 04-21-80 nquested 52016 Inservice Testing (IST) 07-16-81 date past Program 03-17-82 We 08 4 -82 10-25-82 06-20-83 07-05-83
- 11. Auto Shunt Trip N/A 8-25-83 09-16-83 tbte 2 of RTB, DS-416
- 12. Fire Protection Systen N/A 0B-26-8 Considemd Adninistrative T.S. Changes Part of Iten 25
- 1. The 30 day Federal Register notification mquimTent of 10 CFR 50.91 ray delay PRC appmval beymd APCo requested date.
- 2. Delay of appmval could adversely affect the FNP 2 Refueling Ou*. age in S@teiber 1983.
3, Delay of appmval coulri precipitate a special outage.
- 4. Delay of appmval could pmclude startup of each unit after mfueling.