Confirms 830901 Discussions Re Remedial Soils Activities. Corrections to Util & NRC Re Installation of Pier W13 Provided
ML20076K593
Person / Time
Site: Midland
Issue date: 09/07/1983
From: Mooney J
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
CSC-6871, NUDOCS 8309150002
Download: ML20076K593 (1)


Text

Consumers OMr J ^ **

Executive Atanager Company su m.,,ow, h

General Offices: 1945 West Pernait Road, Jackson, MI 49201 * (517) 788-0774 y

. 0/RA 3CSA A3 A/RA

  1. Ao d

September 7, 1983 oPRP isto

./D -394 DRMA RC ff 3D J3L)

Esse Mr J J Harrison i JE~

Midland Project Section

1L Lb U S Nucicar Regulatory Commission OL Rtt fL i

Region III 799 Roosevelt Road Glen El'yn, IL 60137 MIDLAND ENERGY CENTER GWO 7020 REMEDIAL SOILS DISCUSSIONS BETWEEN CPCo AND NRC File: 0485.16 UFl: 42*05*22*04 Serial: CSC-6871 70*01 This letter is to confirm discussions with Region III's Dr. Lrndsman and Mr. Gardner and with Mr. Wheeler and Mr. Wieland of CPCo on September 1, 1983.

The following agreements were reached:

1.

Dr. Landsman indicated the NRC concurrs with the Engineering logic change which allows the drifts from Kc-2 to Kc-3 and Kc-10 to Kc-11 to be cons-tructed before Piers Kc-3 or Kc-10 are jacked.

2.

Dr. Landsman concurred with eliminating the activity entitled " Construct Concrete Invert and Layback Soil Kc-2 to Kc-3" and " Construct Concrete Invert and Layback Soil Kc-11 to Kc-10" from the work activity list.

3.

It was pointed out to Dr. Landsman that a Consumers Power letter, serial CSC-6863, dated 8/25/83, has the inccrrect activity number to " Install Pier W13", due to a typing error. The number for this activity should be 165054035 instead of 165053035. This incorrect number was also in an NRC approval letter, dated 8/29/83.

For the purposes of documentation, it was agreed that the NRC approval letter dated 8/29/83 authorized the activity

" Install Pier W13" and an additional authorization letter from NRC is not required.

4.

On September 1, 1983, a discussion was held between Dr. Landsman and our Mr. Puhalla in which Dr. Landsman concurred with relocating LS-10 from an interior piezometer to an exterior piezometer, and also concurred with FCR C-6556 to Drawing C-1320 which deletes wells 555, 561, 576 from the I

dewatering schedule and adds them to the piezometer schedule.

If you have any questions please contact this office.