Suppls 830523 Response to NRC Re Violations Noted in IE Insp Rept 50-374/83-11.Corrective Actions:Drawing for Internal Panel Wiring Will Not Be Completed by 830615. Meeting Requested to Dispute Violation
ML20076K255
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 06/14/1983
From: Farrar D
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20076K242 List:
References
6769N, NUDOCS 8307080338
Download: ML20076K255 (2)


Text

-

3

~

Commonwealth Edison C

one First NItional Plaza. Chicago. Illinois O-Addrass Rep y to: Post Othee Box 767 Chicago, lihnois 60690 June 14, 1983 Mr. James G. Keppler, Regional Administrator

- Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137

Subject:

LaSalle County Station Unit 1 Supplemental Response to Inspection Report No. 50-374/83-11 NRC Docket No. 50-374 References (a):

W. S. Little letter to Cordell Reed dated April 26, 1983.

(b):

D. L. Farrar letter to J. G. Keppler dated May 23, 1983.

Dear Mr. Keppler:

Reference (a) indicated that certain activities appeared to be in noncompliance with NRC requirements.

Reference (b) provided the Commonwealth Edison Company (CECO) response to Reference (a).

The purpose of this letter is to revise and provide the updated status of Reference (b).

In the section Corrective Action Taken to Avoid Recurrence, it was stated Sargent & Lundy Engineers would develop by June 15, 1983 a drawing similar to IE-0-3333 for internal panel wiring.

Additionally, it was stated that the H. P. Foley Company procedure addendums would be re-reviewed against the revised drawings and necessary procedural adjustments made and training conducted.

The above corrective actions will not be completed prior to June 15, 1983.

Commonwealth Edison Company Project Engineering and Project Construction Departments wish to meet with Messrs. R. R. Naidu and I.

Ahlmed during the week of June 20, 1983 to discuss the IE report issues and corrective actions.

Our Project Engineering Department has information which may indicate that the Item of Noncompliance may not be a violation.

Mr. I. Ahlmed was contacted by the LaSalle County Site Project Construction Superintendent on June 9, 1983 regarding this possibility and requested the meeting.

8307000338 830630 PDR ADOCK 05000374 JUN 16 E63 O

PDR

4 2-June 14, 1983 J. G. Keppler To the best of my knowledge and belief the statements contained herein are true and correct.

In some respects these statements are not based on my personal knowledge but upon information furnished by other Commonwealth Edison employees and consultants.

Such information has been reviewed in accordance with Company practice and I believe it to be reliable.

If there any any further questions regarding this matter, please contact this office.

Very truly yours,

,,M c//v/9:s t

,tv'-

D. L. Farrar Director of Nuclear' Licensing i

1m cc:

NRC Resident Inspector - LSCS

't 1