Interim Deficiency Rept,Item M-87,re Design Control Process Inadequate to Assure Design Output Documents Contain Adequate Erection & Insp Criteria.Initially Reported on 830513.Reportability Per 10CFR50.55(e) Not Yet Determined
ML20076K237
Person / Time
Site: Zimmer
Issue date: 06/30/1983
From: Williams J
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
RTR-NUREG-0969, RTR-NUREG-969 10CFR-050.55E, 10CFR-50.55E, LOZ-83-0074, LOZ-83-74, NUDOCS 8307080327
Download: ML20076K237 (2)


Text

~

TIIE CINCINNATI GAS & ELECTRIC COMIMNY dl~-~

CINCINNATI. OHIO 45201 June 30, 1983 LOZ-83-0074 J. WILLIAM S, JR 6tNsOR vtCE PRESIDCNT NUCLE AN OPER AYiONS Docket No. 50-358 U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attention:

Mr.

J.G.

Keppler Regional Administrator Gentlemen:

RE:

WM.

H.

ZIMMER NUCLEAR POWER STATION - UNIT 1 10CFR50.55(e), ITEM M-87, DESIGN CONTROL PROCESS INADEQUATE TO ASSURE DESIGN OUTPUT DOCUMENTS CONTAIN ADEQUATE ERECTION AND INSPECTION CRITERIA W.O.

57300,' JOB E-5590, FILE NO. 956C, M-87 This letter supercedes our last response, LOZ-83-0045, dated June 15, 1983 and constitutes an interim report concerning the subject condition initially reported to the Commission on May 13, 1983 as a potentially reportable deficiency under the requirements of 10CFR50.55 (e).

The subject condition was identified in NUREG-0969, " Report of the NRC Evaluation Team on the Quality of Construction at the Zimmer Nuclear Power Station" (April 1983).

Section 2.5 of NUREG-0969, entitled Evaluation of Sargent & Lundy Design Practices, identified concerns regarding Sargent & Lundy (S&L) design drawings and specifications.

NUREG-0969 Section 2.5, did not identify any deficiency in design or construction which, were it to have remained uncorrected, could have affected adversely the safety of operations of the plant.

CG&E is conducting a more detailed investigation into the specific items mentioned in NUREG-0969, Section 2.5.

CG&E has not yet determined that any of the subject conditions when taken individually are reportable under the requirements of 10CFR50.55(e).

If this investigation should identify items which meet the 10CFR50.55 (e) reporting criteria, they will be reported.

JUL 5 1983 8307080327 830630 PDR ADOCK 05000358 ff()

d Cc2,!

a S

PDR

e Mr. J.G. Keppler Regional Administrator June 30, 1983 LOZ-83-0074 Page 2 NUREG-0969, Section 2.5 states in part "...given the widespread nature of these concerns when taken in aggregate, there appears to be a clear need to verify the overall quality of the S&L design process."

CG&E is presently conducting an audit af the S&L design process to ensure its overall quality.

CG&E has not yet determined that it represents a condition reportable under the requirements of 10CFR50.55(e).

A follow-up report will be submitted af ter the completion of the S&L audit.

We trust the above will be found acceptable as an interim report under 10CFR50.55 (e).

Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY M

J SENIOR VICE PRE IDENT DJS/sfr cc:

NRC Office of Inspection & Enforcement Washington, D.C.

20555 NRC Senior Resident Inspector ATTN:

W.F. Christianson NRC Zimmer Project Inspector, Region III ATTN:

E.

R. Schweibinz