AUG 101983 ERRATA SHEET for NUREG/CR-3336 EVALUATION OF NUCLEAR FACILITY DECOMMISSIONING PROJECTS Summary Report Ames Laboratory Research Reactor 4
l Prepared by UNC Nuclear Industries for the U.S. Nuclear Regulatory Commission Please make the following changes:
Page 5, Section 2.3.1 The cost per unit to decommission the RRR i
should read as follows:
RRR No. of No. of $
Item (Unit Units Per Unit 1
Radionuclide 1500 566.67 Inventory (C1.)
Radwaste (Cu, Ft.)
5650 150.44 1
1 Lifetime Pwr.
740 1148.65 Output (MWdt) l Spending Rate (Mon) 8.5 100000.
l i
Page 13 - The last sentence of the third paragraph should be changed to read:
The laboratories were decontaminated and surveyed. With the exception of tritium contamination the final survey showed the facility could I
be released for unrestricted use using the guidelines from NRC Regulatory Guide 1.86 " Termination of Operating Licenses for Nuclear Reactors."
Page 15 - The second sentence in the first paragraph which begins, "It is interesting... in 1978-81," should be deleted.
The next sentence should be revised to read "Because of escalation, the cost of decommissioning cannot be directly compared to the construction costs."