ML20076H934

From kanterella
Jump to navigation Jump to search
Forwards LERs 83-023/03L-0,83-023/03L-0 & 83-024/03L-0
ML20076H934
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 06/10/1983
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20076H937 List:
References
NUDOCS 8306200216
Download: ML20076H934 (1)


Text

-

'Malling Address Al:Damt Powzr Company 600 North 18th street e

Post Offica Box 2641 Birmingham. Alabama 35291 Telephone 205 783-6081 F. L Clayton, Jr.

Senior Vica President AlabamaPower Flintridge Building the southern thritc system June 10,1983 co DC W

e,,m 1

c Docket No. 348 l';$

Docket No. 364 t,3 m

  • G
.'3MU O

W U. S, Nuclear Regulatory Commission C

3'S Office of Inspection and Enforcement Region II 101 Marietta Street, N.W.

Suite 3100 Atlanta, Georgia 30303

Dear Sir:

Joseph M. Farley Nuclear Plant, Unit 1, Licensee Event Report No. LER 83-023/03L-0 and Unit 2, Licensee Event Reports Nos. LER 83-023/03L-0 and LER 83-024/03L-0 are forwarded with three (3) copies of each in accordance with FNP Technical Specification 6.9.1.13 to provide thirty (30) days written notification of the occurrences.

If you have any questions, please advise.

Yours very truly, h

F.L.Clayton,fr.

FLCJ r/KWM:nac Enclosures xc: Director, IE (30 copies)

Director, MIPC (3 copies)

UFFICI AL COP,)

Y aA sao6200216 830610 t)

PDR ADOCK 05000348 g

PDR