ML20076H061
| ML20076H061 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 09/30/1994 |
| From: | Richard Anderson, Paustian H NORTHERN STATES POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9410210063 | |
| Download: ML20076H061 (5) | |
Text
-
Northem States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401 1927 Telephone (612) 330-5500 October 12, 1994 Monticello Technical Specifications Section 6.7.A.3 US Nuclear Regulatory Commission Attn Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Monthly Operating Report September, 1994 Attached is the Monthly Operating Report for September, 1994, for the Monticello Nuclear Generating Plant.
[Jys & 4 4
or ger O Anderson Director Licensing and Management Issues c:
Director, Office of Resource Management Regional Administrator-III, NRC NRR Project Manager, NRC NRC Resident Inspector State of Minnesota - Kris Sanda Attachment 1'. C f ' r :u d u.L s)
N 9410210063 94o930
/
U DR ADOCK 05000263 Iq eda
j OPERATING DATA REPORT DOCKET NO.
50-263 DATE 10- 3-94 COMPLETED BY H.
H.
Paustian TELEPHONE 612/295-5151 OPERATING STATUS
] Notes
]
1.
Unit Name :
Monticello
]
]
2.
Reporting period:
September
]
]
- 3. Licensed Thermal Power (MWt):
1670
]
]
4.
Nameplate Rating (Gross MWe) :
569
]
]
- 5. Design Electrical Rating (Net MWe):
545.4
]
]
l
- 6. Maximum Dependable Capacity (Gross MWe) : __564
)
]
i
- 7. Maximum Dependable Capacity (Net MWe) :
536
]
]
8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9.
Power Level To which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any: __N/A THIS MONTH YR.-TO-DATE CUMULATIVE
- 11. Hours In Reporting Period 720 6551 203832
- 12. Number Of Hours Reactor Was Critical 342.3 6011.5 165387.2
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 940.7
- 14. Hours Generator On-Line 337.0 5973.3 162574.0
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
, 16. Gross Thermal Energy Generated (MWH) 457738 9689662 250954442
! 17. Gross Electrical Energy Generated-(MWH) 149701 3259763 84814426
- 18. Net Electrical Energy Generated (b98) 140621 3121217 81140010
- 19. Unit Service Factor 46.8%
91.2%
79.8%
- 20. Unit Availability Factor 46.8%
91.2%
79.8%
- 21. Unit Capacity Factor (Using MDC Net) 36.4%
88.9%
74.3%
- 22. Unit Capacity Factor (Using DER Net) 35.8%
87.4%
73.0%
- 23. Unit Forced Outage Rate 0.0%
3.2%
3.6%
- 24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each) l
- Refueling Outage - 9/15/94 - 39 days
- 25. If Shut Down At End Of Report Period, Estimated Date Of Startup:10/21/94
- 26. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION i
I
l e'
l I
AVERAGE DAILY UNIT POWER LEVEL l
DOCKET NO.
50-263 UNIT Monticello l
DATE 10- 3-94 COMPLETED BY H. H.
Paustian TELEPHONE 612/295-5151 l
l MONTH OF September l
l DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) l 1
437.
17
-6.
i i
2 438.
18
-4.
3 439.
19
-3.
4 437.
20
-4.
5 435.
21
-4.
6 432.
22
-4.
7 428.
23
-4.
8 424.
24
-2.
9 423.
25
-4.
i I
l 10 419.
'26
-3.
1 t
l 11 412.
27
-3.
12 402.
28
-4.
13 413.
29
-3.
14 382.
30
-3.
15
-6.
16
-7.
INSTRUCTIONS l
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
l I
l
i NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE l
I DOCKET NO.
50-263 t
DATE 10- 3-94 i
COMPLETED BY H.
H.
Paustian TELEPHONE 612/295-5151 MONTH SEP i
l 09-01-94 to Power operation (End-of-cycle coastdown began 7/18/94.)
l 09-15-94 1
09-15-94 l
to Shutdown for 1994 Refueling Outage.
l 09-30-94 l
l t
i I
l l
l Note: Power operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance testing.
i l
1
-~
k UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-263 UNIT NAME l onticello DATE 70-07-94 COMPLETED BY 1. H. Pausclan REPORT MONTH _ September _
TELEPHONE [612/295-5151 -
Duration Reason Method LER System Comp.
Cause & Corrective No.
Date Ty(pe (hours)
(2) of No.
Code Code Action to 1)
Shutdown (4)
(5)
Prevent Recurrence (3) 6 09-15-94 S
383.1 C
1 N/A Plant shutdown for 1994 (EOC16) refueling outage.
I' 1
2 3
4 F: Forced Reason:
Method:
Draft IEEE Standard S: Scheduled A-Equipment Failure (Explain) 1-Manual 805-1984(P805-D5)
B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram 5
D-Regulator Restriction 4-Other (Explain)
IEEE Standard 803A-1983 E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
-