MONTHYEARML20217H2841999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Seabrook Station. with ML20212B8671999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Seabrook Station. with ML20210R6001999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Seabrook Station, Unit 1.With ML20209H1371999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Seabrook Station, Unit 1.With ML20195G5391999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Seabrook Station, Unit 1.With ML20206N1751999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Seabrook Station, Unit 1.With ML20205L8141999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Seabrook Station. with ML20207F4941999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Seabrook Station. with ML20199E6731998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Seabrook Station, Unit 1.With ML20198B8661998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Seabrook Station, Unit 1.With ML20195D0311998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Seabrook Station, Unit 1.With ML20154M8421998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Seabrook Generating Station,Unit 1.With ML20151V5951998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Seabrook Station, Unit 1.With ML20237B4501998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Seabrook Station ML20236M3591998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Seabrook Station, Unit 1 ML20248M2951998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Seabrook Station, Unit 1 ML20247G2641998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Seabrook Station ML20216F8891998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Seabrook Station ML20248L2811998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Seabrook Station, Unit 1 ML20202G3701998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Seabrook Station ML20198N7021997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Seabrook Station, Unit 1 ML20203D6311997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Seabrook Station, Unit 1 ML20198Q2591997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Seabrook Station ML20217H6101997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Seabrook Station, Unit 1 ML20216H6141997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Seabrook Station ML20210K6011997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Seabrook Nuclear Station,Unit 1 ML20141H1031997-06-30030 June 1997 Monthly Operating Rept for June 1997 for Seabrook Station ML20148K6791997-05-31031 May 1997 Monthly Operating Rept for May 1997 for Seabrook Station ML20141F3331997-04-30030 April 1997 Monthly Operating Rept for Apr 1997 for Seabrook Station Unit 1 ML20137V9651997-03-31031 March 1997 Monthly Operating Rept for Mar 1997 for Seabrook Station Unit 1 ML20147E5891997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Seabrook Station Unit 1 ML20134M2261997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for Sns ML20133M6221996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Seabrook Station Unit 1 ML20132D6251996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Seabrook Station Unit 1 ML20134H3721996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Seabrook Station Unit 1 ML20128N5241996-09-30030 September 1996 Monthly Operating Rept for Sept 1996 for Seabrook Station Unit 1 ML20117N1551996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Seabrook Station ML20116J0761996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Seabrook Station, Unit 1 ML20115B1061996-06-30030 June 1996 Monthly Operating Rept for June 1996 for Seabrook Station Unit 1 ML20117K4941996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Seabrook Station, Unit 1 ML20111B0361996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Seabrook Station.W/ ML20101R2261996-03-31031 March 1996 Monthly Operating Rept for Mar 1996 for Seabrook Station Unit 1 ML20106G8461996-02-29029 February 1996 Monthly Operating Rept for Feb 1996 for Seabrook Station, Unit 1 ML20100G8611996-01-31031 January 1996 Monthly Operating Rept for Jan 1996 for Seabrook Station Unit 1 ML20096B9021995-12-31031 December 1995 Monthly Operating Rept for Dec 1995 for Seabrook Station Unit 1 ML20095C1071995-11-30030 November 1995 Monthly Operating Rept for Nov 1995 for Seabrook Station Unit 1 ML20094L1381995-10-31031 October 1995 Monthly Operating Rept for Oct 1995 for Seabrook Station Unit 1 ML20093F5431995-09-30030 September 1995 Monthly Operating Rept for Sept 1995 for Seabrook Station Unit 1 ML20092G2781995-08-31031 August 1995 Monthly Operating Rept for Aug 1995 for Seabrook Station Unit 1 ML20087F1521995-07-31031 July 1995 Monthly Operating Rept for Jul 1995 for Seabrook Station Unit 1 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H2841999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Seabrook Station. with ML20212D1461999-09-17017 September 1999 SER Accepting Request to Use Proposed Alternative to Certain Weld Repair Requirements in ASME Boiling & Pressure Vessel Code ML20216F5141999-08-31031 August 1999 Rept on Status of Public Petitions Under 10CFR2.206 ML20212B8671999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Seabrook Station. with ML20210Q7581999-08-11011 August 1999 SER Approving Proposed Merger of CES & Bec,Which Will Create New Parent Company of Canal ML20210R9781999-08-0606 August 1999 ISI Exam Rept of Seabrook Station, for RFO 6,period 3 ML20210J8681999-08-0303 August 1999 SER Approving License Transfer from Montaup Electric Co to Little Bay Power Corp & Approval of Conforming Amend for Seabrook Station Unit 1 ML20210R6001999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Seabrook Station, Unit 1.With ML20210H1151999-06-30030 June 1999 Naesc Semi-Annual Fitness-for-Duty Rept for 990101-0630 ML20209H1371999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Seabrook Station, Unit 1.With ML20195G5391999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Seabrook Station, Unit 1.With ML20195C0491999-05-25025 May 1999 Offshore Intake Seal Deterrent Barrier Design ML20206E4761999-04-30030 April 1999 LER 99-S01-00:on 990408,contractor Employee Was Granted Temporary Unescorted Access to Seabrook Station Protected Area.Caused by Failure of Contractor Employee to Provide Accurate Info.Individual Access Revoked.With ML20206N1751999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Seabrook Station, Unit 1.With ML20196L2081999-04-19019 April 1999 Rev 01-07-00 to RE-21, Cycle 7 Colr ML20205K5441999-03-31031 March 1999 Decommissioning Update ML20205L8141999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Seabrook Station. with ML20205C1981999-03-24024 March 1999 Safety Evaluation Concluding That Proposed Relief Request IR-8,Rev 1,provides Acceptable Alternative to ASME Code Requirements.Recommends Authorization of Proposed Alternative Pursuant to 10CFR50.55a(a)(3)(i) ML20207F4941999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Seabrook Station. with ML20199E6731998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Seabrook Station, Unit 1.With ML20198P1831998-12-31031 December 1998 LER 98-S01-00:on 981214,incomplete pre-employment Screening Records Was Noted.Caused by Failure of Contractor Employee to Provide Accurate Info.Subject Contractor Employees Employment Was Terminated.With ML20202E8241998-12-31031 December 1998 Naesc Semi-Annual Fitness-for-Duty Rept for 980701-981231 ML20196F5741998-12-0202 December 1998 Safety Evaluation Concluding That Licensee Has Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Seabrook ML20198B8661998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Seabrook Station, Unit 1.With ML20195D0311998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Seabrook Station, Unit 1.With ML20154H5291998-10-0808 October 1998 Special Rept:On 980928,meteorological Monitoring Instrumentation Channel Inoperable for Period Greater than 7 Days.Caused by Vendor to Follow Std Industry Practice for Calibr of Instrumentation.Instruments Installed ML20154M8421998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Seabrook Generating Station,Unit 1.With ML20151V5951998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Seabrook Station, Unit 1.With ML20237B4501998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Seabrook Station ML20236R1781998-06-30030 June 1998 Naesc Semi-Annual Fitness-for-Duty Rept for 980101-0630 ML20236M3591998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Seabrook Station, Unit 1 ML20237A4871998-06-0303 June 1998 North Atlantic Seabrook Station 1998 Exercise on 980603 ML20248M2951998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Seabrook Station, Unit 1 ML20247G2641998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Seabrook Station ML20247H3171998-04-27027 April 1998 Rev 1 to Seabrook Station SGs B & C Isi,May/June 1997 ML20216F8891998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Seabrook Station 05000443/LER-1998-002, Re Potential Safety Injection Pump Runout Conditions Identified on 980113.LER 98-002-00 Retracted1998-03-20020 March 1998 Re Potential Safety Injection Pump Runout Conditions Identified on 980113.LER 98-002-00 Retracted ML20216H9211998-03-13013 March 1998 Fitness for Duty Program Performance Data Personnel Subject to 10CFR26 ML20248L2811998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Seabrook Station, Unit 1 ML20197A7531998-02-27027 February 1998 Safety Evaluation Accepting License Request for Relief from ASME Code,Section IX Requirements Re Inservice Insp of RHR Heat Exchanger Nozzle Welds & Reactor Vessel Closure Head Nuts ML20202G3701998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Seabrook Station ML20198G0271997-12-31031 December 1997 Commonwealth Energy Sys 1997 Annual Rept ML20248L7711997-12-31031 December 1997 Western Massachusetts Electric 1997 Annual Rept. Supporting Info,Encl ML20198G1021997-12-31031 December 1997 Baycorp Holdings 1997 Annual Rept ML20198N7021997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Seabrook Station, Unit 1 ML20198G0351997-12-31031 December 1997 Eastern Edison Co 1997 Annual Rept ML20198G0681997-12-31031 December 1997 Taunton Municipal Lighting Plant 1997 Annual Rept ML20248L7671997-12-31031 December 1997 North Atlantic 1997 Annual Rept ML20198F9511997-12-31031 December 1997 United Illuminating Co 1997 Annual Rept ML20236M9561997-12-31031 December 1997 Amended Public Service of New Hampshire 1997 Annual Rept 1999-09-30
[Table view] |
Text
North Atlantic Energy Service Corporation a NortL11 p.o. 3,, 300 L
Atlantic seabrook.xiio3874 (603) 474-9521, Fa, (603) 474-2987 The Northeast Utilities System Ted C. Feigenbaum NYN 94116 Senior Vice President &
Chief Nuclear Officer October 12,1994 United States Nuclear Regulatory Commission Washington, DC 20555 Attention: Document Control Desk
Reference:
Facility Operating License NPF-86, Docket No. 50-443
Subject:
Monthly Operating Report Gentlemen:
Enclosed please Gnd Monthly Operating Report 94-09. This report addresses the operating and shutdown experience relating to Seabrook Station Unit i for the month of September,1994 and is submitted in accordance with the requirements of Seabrook Station Technical-SpecIiic'a ' n 6.8.1.5.
V r truly yours,
- p y ;,%,'
Ted'C. Feigenbaum V
Enclosure cc: Mr. Thomas T. Martin Regional Administrator United States Nuclear Regulatory Commission ,
Region I '
475 Allendale Road King of Prussia, PA 19406 Mr. Albert W. De Agazio, Sr. Project Manager Project Directorate 1-4 Division of Reactor Projects U.S. Nuclear Regulatory Commission Washington, DC 20555 Mr. Richard Laura NRC Senior Resident Inspector PO Box I149 , ,m Seabrook, Nll 03874 1 o U, yU .;. J ;
9410190178 940930 PDR R ADOCK 05000443 L pyg , ;
OPERATING DATA REPORT 4
DOCKET NO. 50-443 UNIT Seabnok 1 DATE 10/12/94 COMPLETED BY P.E. Nardone TELEPilONE 603/474-9521 Ext. 4074 OPERATING STATUS
- 1. Urut Name: Seabrook Statmn Unit 1
- 2. Reporung Period: SEPTEMBER 1994
- 3. Licensed Thermal Power (MWO: 3411
- 4. Narneplate Rating (Gross MWe): 1197
- 5. Design Electrical Ratmg (Net MWe): 1148
- 6. Maximum Dependable Capacity (Gross MWe): 1200
- 7. Maximum Dependable Capacity (Net MWe): 1150
- 8. If Changes Occur in Capacity Ratmgs (Items Number 3 through 7) Smce Last Not Applicable Report, Give Reasons:
- 9. Power I.evel To Which Restricted, if Any: None
- 10. Reasorn For Restrictions, if Any: Not Applicable This Month Yr-to-Date Cumulative
- 11. llours in ReportmF Perimi 720.0 6551.0 69744.0
- 12. Number of Ilours Reactor Was Cntical 720 0 3350.9 31058.0
- 13. Reactor Reserve Shutdown llours 0.0 0.0 953.3
- 14. Ilours Generator On-Line 720.0 3258.0 28935.2
- 15. Unit Reserve Shutdown llours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWil) 2455597 10867523 94299WO
- 17. Gross Elec. Energy Generated (MWil) 863207 3801855 32775599 1R. Net Electrical Energy Generated (MWil) 830831 3654566 31478184
- 19. Unit Service l' actor 100.0 49.7 76.4
- 20. Urut Asailabihty Factor 100.0 49.7 76.4
- 21. Umt Capacity Factor (Using MDC Net) 100.3 48.5 73.4
- 22. Umt Capacity Factor (Usmg DER Neo 100,5 48.6 73.5
+23. Urut li orced Outare Rate 0,0 14.5 7.3
- 24. Shutdowns Scheduled Over Next 6 Months (Type Date, None Scheduled and Duration of Each):
- 25. Il Shut Down At End Of Report Period. Estimated Date of Not Applicable Startup:
- NOTE: *Cumulatne" values based on total hours starung 8/19% date Regular Full Power Operation began.
1 of 4
7 l
, AVERAGE DAILY UNIT POWER LEVEL !
a .
l 1
DOCKET NO. 50443 UNIT Seabrook 1-DATE - ' 10/12/94 COMPLETED BY P.E. Nardone TELEPilONE - 603/474-9521
- Ext. 4074 f
-i MONTil: SEPTEM11ER,1994
?
DAY AVERAGE DAILY POWL'.R LEVEL DAY AVERAGE DAILY POWER LEVEL !
(MWe-Net) (MWe Net) l I 1- 1154 17 1154 2 1154 18 1154 I 3 1154 19 1155 ;
4 1154 20 1155 l t
5 1153 21 1155 ,
s 6 1153 22 1155 ,
7 1153 23 1154 ,
i h 1153 24 1153 ;
I 9 1154 25 1153 -
10 1154 26 1153 11 1154 27 1153 12 1154 28 1153 l
~
13 1155 29 1153 14 1155 30 1155 15 1154 16 1154 INSTRUCTIONS ,
On this format, list the averaFe daily unit power level in MWe-Net for each day in the reponing month. Compute to the nearest whole megawatt.
i 2 of 4
UNIT SIIUTDOWNS AND POWER REDUCTIONS .
DOCKET NO. 50443 .
UNIT Seabrook I )
i-DATE 10/12/94 -
COMPLETED BY - P.E. Nardone TELEP110NE N)3/474-9321 Ext. 4074 REPORT MON 111 SEPTEMBER.1994
~
NO. DATE TYPE' DURATION REASON: AIET110D OF SliUTTING LICENSEE EVENT CAUSE & CORRECTIVE ACTION TO PREVENT (llOURS; DOWN REACTOR' REPORT # RECURRENCE Page i ofI No entries for this month.
t I
t 2 1 F: Forced Reason: Method.
S: Scheduled A - Equipment Failure (Explain) - 1 - Manual B - Maimenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Continued from previous month E - Operator Training & License Examination 5 - Power Reduction (Duration = 0)
F- Administrative 9 - Other (Explain)
G - Operational Error (Explain)
II - Other (Explain) i 5
\
3 of 4
, ,. REFUELING INFOR31ATION REQUEST DOCKET NO. 50-443 UNIT Seabrook t DATE 10/12/94 COMPLETED BY P.E. Nardone TELEPHONE 603/474-9521 Ext. 4074
- 1. Name of Facility: Seabrook Unit 1
- 2. Scheduled date for next refueling shutdown: Refueling Outage 4,01/06/96
- 3. Schululed date for restart following refueling: Refueling Outage 4,02/28/96
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Yes, Technical Specification Figures 3.4-2 and 3.4-3 will require revision.
- 5. Schedule date(s) for submitting licensing action and supporting information:
N/A
- 6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
None
- 7. The number of fuel assemblics (a) in the core and (b) in the spent fuel storage pool:
(a) In Core: 193 (b) 208
- 8. The present licensed spent fuel pool storage capacity and the size of any increase vn licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
Present licensed capacity: 1236 No increase in storage capacity requested or planned.
- 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
Licensed capacity of 1236 fuel assemblies based on two annual and twelve eighteen-month refuelings with full core offload capability.
The current licensed capacity is adequate until at least the year 2010.
1 4 of 4 i