Suppls Response to Generic Ltr 82-33 & Suppl 1 to NUREG-0737 Re Emergency Response.Commitments Amended to Include Date for Completion of Reg Guide 1.97 Signal Survey & Const of New Emergency Operations Facility
ML20076F462
Person / Time
Site: FitzPatrick 
Issue date: 08/24/1983
From: Bayne J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Vassallo D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737 GL-82-33, JPN-83-77, NUDOCS 8308260044
Download: ML20076F462 (2)


Text

~

123 Main Street Wh Rains, New York 10601 914 681.6240

  1. > NewYorkPbwer i ' 2 "::"Je.,4en1 4# Authority

""**' o-e="

August 24, 1983 JPN-83-77 Director of Nuclear Reactor Regulation U.S. Muclear Regulatory Commission Washington, D.C.

20555 Attention:

Mr. Domenic B. Vassallo Operating Reactors Branch No. 2 Division of Licensing

Subject:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Supplement No. 1 to NUREG-0737 Requirements for Emergency Response Capability

Reference:

1.

NRC Generic Letter No. 82-33, D.G.

Eisenhut to All Licensees, dated December 17, 1982.

2.

PASNY Letter, J.P.

Bayne to D.B. Vassallo, dated April 15, 1983.

Dear Sir:

The Authority furnished a proposed schedule for completing each of the basic requirements for the items identified in Supplement No. 1 to NUREG-0737 (Reference 1) via our April 15, 1983 letter (Reference 2).

Generic Letter No. 82-33 also requested a description of the Authority's plans for phased implementation and integration of these emergency response facilities.

This was included as Attachment II to Reference 2.

We distinguished between the commitments contained in Attachment I to Reference 2 and the information in Attachment II.

While the dates in Attachment I are formal commitments, the schedules and time frames of Attachment II were for information only and therefore not to be construed as commitments.

h(

1 O 8308260044 830824 l

PDR ADOCK 05000333 F

PDR

During the past few weeks we have discussed these schedules with our NRC Project Manager.

As a result of these negotiations, we agreed to amend our commitments to include two additional items.

These commitments concern a date for the completion of the Regulatory Guide 1.97 Signal Survey and the construction of new Emergency Operations Facility (EOF).

Regulatory Guide 1.97 Signal Survey In section 5.1.1 of Attachment II to Reference 2, the Authority described a plant signal survey.

This signal survey will catalog all of the existing variable signals in the FitzPatrick plant.

The end result of this survey will be a list of all existing signals along with detailed information about each signal (such as type of signal, range, transmitter location, power source, environmental i

qualification and redundancy.)

This survey will be completed by May 1, 1984.

New Emergency Operations Facility (EOF)

In Section.6.4 of Attachment II to Reference 2, the Authority described plans for the construction of a new EOF.

The Authority will construct a new Emergency Operations Facility as described in Section 6.4 of Attachment II to Reference 2.

Based upon our current schedule, we anticipate that this new EOF will be functional by February 1, 1985.

If you have any questions regarding these commitments, please contact Mr.

J.A.

Gray, Jr. of my staff.

Very truly yours, 7.,Ps a ne

~

xecutive Vice President Nuclear Generation State of New York County of Westchester Subscribed and Sworn to before me this.?'/ day of Au9mf 1983

EANss in tuna NOTARY PUBLIC, STATE OF NEW YORIC NO. 60 4614301 QUAllFIED IN WE3fCHE5fER COUNTY

/

TERM EXPigES MARCH 30th 19..M...

'/

Notary Public

(/

cc:

Mr.

J.

Linville Resident Inspector U.S.

Nuclear Regulatory Commission P.O.

Box 136 Lycoming, NY 13093 1

...,_r.

...m,-.__.,

c..., _,. _, _ _ -

_