Forwards NPDES Discharge Monitoring Rept,Jan-Mar 1983
ML20076D666
Person / Time
Site: Pilgrim
Issue date: 05/12/1983
From: Mathis C
BOSTON EDISON CO.
To: Mcmahon T
ENVIRONMENTAL PROTECTION AGENCY, MASSACHUSETTS, COMMONWEALTH OF
Shared Package
ML20076D668 List:
References
NUDOCS 8305230535
Download: ML20076D666 (1)


Text

, ..

. ' Etilson we.,

.= ~_suiM N UC:JAa .30WER STAR:CN WC *1GOCKYH u ACA A rvCUTH. MAsEACsusCTT3 COO 6C May 12, 1983 United States Environmental Protection Agency Water Management Division - Room 2103 ,

John F. Kennedy Building Boston, Massachusetts 02203 Attention: Permit Compliance Section Mr. T. C. McMahon, Director Massachusetts Water Resources Commission Division of Water Resources Conmission Division of Water Pollution Control Leverett Saltonstall Building Boston, Massachusetts 02202 Gentlemen:

Enclosed is the Discharge Monitoring Report from Pilgrim Nuclear Power Station, Permit' Number 0003557 (Federal), and Number 359 (State) .

The period covered by this report is January 1,1983 to March 31, 1983.

Very truly yours, f' 'JYf C. J. Mathis, Station Manager Nuclear Operations Department CJM/tmt attachment - Discharge Monitoiing Report cc: J. M. Ballentine A. V. Morisi C. J. Mathis S. Stowe F. Lee T. Sowdon (with att.)

P. D. Smith (with att. ) '

B. Anderson (with att.)

Document Control Center (with att.)

Boston Edison Reading Room (with att.)

[gr.JamesAllen,USNRC(withatt.)

dr. Darrell G. Eisenhut, USNRC (with att.)

SW 8305230535 830512 PDR ADOCK 05000293 R PDR

g..

- " Edison -m P!LGRIM NUCLEAR POWER STAR!CN RFC *1 ROCKY H'LL RCAO P LY M u u T m. M A53aOHLSETTS C23 60 PILGRIM I DISCHARGE PERMIT REPORT In accordance with the Federal Water Pollution Control Act, as amended (33USC 1251 Et. Seg: the "ACT") and the Massachusetts Clean Waters Act, as amended (M.G.L. , C21, as 26-53), concerning effluent limitations, monitoring require-ments, and other conditions set forth in the Pilgrim I Discharge Permits (Federal Permit Nuclear MA0003557, and State Permit Number 259), Parts I, II, and III, the following information is submitted:

I. Discharge Points Covered in this Report Discharge Point Discharge Identification 001 Condenser and Service Cooling Water 001A Radwaste System Effluents 001B Non-Radioactive Makeup System and Demineralizer Effluents 002 Condenser Backwash and Slime Control 003A Intake Screen Wash

! II. Summary and Notes of Discharge Report A. The pH for Intake Screen Wash (Discharge Point 003A) and the Condenser Backwash (Discharge Point 002 1) was not measured.

B. The Total Residual Chlorine for Condenser Backwash, Discharge Point 002 1, was not measured.

C. The flow point 001 is calcualted from system pump capacity and is equal to the total flow for all pumps in the system running at full capacity for a 24-hour period. The flow at point 001A is metered and the volume for each discharge is recorded. The flow at point 001B is measured by noting sump levels before and after discharge. Flow at point 002 is a conservative figure obtained by calculating flow if backwashing took place for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

D. The temperature at points 001 and 002 are measured by resistance temperature directors (RTD's).