Forwards Summary of Environ Protection Program Re Const of Unit 2 for 6-months Ending 910630.Application Requesting Termination of CPPR-119 Submitted Via
ML20076D502
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 07/24/1991
From: Cottle W
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GNRO-91-00131, GNRO-91-131, NUDOCS 9107290197
Download: ML20076D502 (4)


Text

F M

Entergy Operanons,Inc.

e-E'NTERGY W. T. Cottle July 24, 1991 U.S. Nucient Regulatory Commission Maii Station P1-137 Wnt hingt on, D.C.

20555 Attnntion:

Documerit Control Desk

Subject:

Grnnd Gulf Nuclent Station Unit 2 Decit et No. $0-417 Const ruct ion Permit No. C PIT'- 119 Transmitt al of Envit onmental Pt otection Program Report for Six Months Ending June 30, 1991 GNRO-91/00111 Gentlemen:

Attached is a report ontitled " Summary of Environmental Protection Program Respecting Construction of Grand Gulf Nuclear Station (GGNS) Unit 2 for Six Months Ending June 30, 1991 " This report is submit t ed as required by St.af f Exhibit 2-A r eferenced in Subsect ion 3.E.1 of Const ruct ion Permit No. CPPR-119.

An application request ing t ermluntion of t he constinct ion perrrit for GGNS Unit 2 was submit ted t o thn St af f by Ent ergy Operat ions, Inc. In a letter dated December 27, 1990 (AECM-90/2-0004).

A responsn to this tequent is pt.nd i ng.

Yours truly, C< c' WC.w:rc.

WTC/DPM/mtc attnchment:

Envi ror. ment al Prot ect f on Program Report cc:

(See Next. Page) 09107231/SNLICFI,R - 1 200C 9107290197 +10724 POR ADOCK 05000417 COO l R

PDR I t,

I-July 24, 1991 GNRO-91/00131 Page 2 of 3 cc:

lir. D. C. Itintz (w/n)

Mr. J. l.. Ma t tils (w/n)

M r. R. it. McGohne (w/n)

Mr. N. S. Reyrioltin (w/n)

Mr.11. l.. Tlioman (w/o)

Mr. F. W. Titun (w/n)

Mr. St ewart. D.1;bneter (w/n)

Regional Arimiulstrator U.S. Nucient Reguintory Commission Region 11 101 Mntlett.n St.. N.W.,

Sultn 2900 Atlanta, Goorgin 30323 Mr. l.. l.. K intner, Project Hnnnger (w/a)

Of flee of Nuclenr Ronctor Regulat ton U.S. Nucient Regulatory Commission Mail Stop 11D21 Washington, D.C.

20555 G9107231/SNI.ICFl,R - 2

Attnchment to GNRO-91/00131 Page 1 of 2 1-

SUMMARY

OF ENVIRONMENTAL PROTECTION PROGRAM RESPECTING CONSTRUCTION OF GRAND GULF NUCLEAR STATION (GGNS) UNIT 2 FOR SIX HONTilS ENDING JUNE 30, 1991 Const.ruction liighlights A rectuest to terminate the Unit 2 Const ruct ion Permit was submitted to the NRC December 27, 199n by Entergy Operations.

The Grnnd Gulf 2 site hns been stabilized in accordance wit h all Const ruction Permit and UFSAR re<piirements. This includes the backfill of Grand Gulf 2 excnyntion site and the reseeding and turnover of formerly used constructlou sites to Grand Gulf I operations. Grnnd Gulf 1 operations has assumed responsibility for maint.cnnnce nnd upkeep of the entire site.

Final reclamation nnd restornt ton of the Grnnd Gulf Nucicar Station site will be addressed upon the decommissioning of Grntul Gul f 1.

Vehicular Movumont No "of f limit" vloint lons were observed during the teporting period.

Dust Control No dust u ntrol vlointions were observed during the reporting period.

Smoke Control No smoke violations ocrurred during the reporting period.

The GGNS 11 urn Pit, which was officially closed on Februnty 22, 1990, was filled with dirt during t he week of June 11, 1990 thus prohibiting any future use.

Erosion Control Rainfall was recorded on % occasions during t he reporting period, with an accumulat ed total of 44.07 inches.

Chemical & Solid Waste Control No violations or improprieties of Mississippi wnste disposal regulations occurred during the reporting porlod.

Noise Control No excessive noise levels were detected during the reporting period.

G9107231/SNLICFLR - 4

r' e

Attachment to GNRO-91/00131 i

Page 2 of 2 Sediment Basins A & B There worn no construction-associated problems with Sediment flasin A or B during the reporting period.

Regional Groundwater Wells The twelvo regional groundwater wells were read 13 timos during the reporting period with no problems encountered.

Vegetation Survey No vegetational abnormalities worn obantved during the reporting period.

Trensmission Lines Trnimmission lino surveys worn sinspended in 1988 basnd on the stabilization of soil and vegetation observed along those lines during previous surveys.