ML20076C001

From kanterella
Jump to navigation Jump to search
Ro:On 830803,while Performing Periodic Surveillance Testing on RCIC Sys,Discharge Pressure Instrument PI 2506 Displayed Erroneous Indications.Hpci Turbine Speed Indication Failed Downscale During Testing
ML20076C001
Person / Time
Site: Duane Arnold 
Issue date: 08/03/1983
From: Mineck D
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
DAEC-83-634, NUDOCS 8308220137
Download: ML20076C001 (1)


Text

'~

4 4

Iowa Electric Light and Ibwer Company August 3, 1983 DAEC 634 Mr. James G. Keppler Regional Administrator Region III U. S. Nuclear Regulatory Commission.

799 Roosevelt Road Glen Ellyn, IL 60137

Subject:

Duane Arnold Energy Center Op. License No. DPR-49 Docket No. 50-331 Prompt Notification of a Reportable Occurrence File: A-118a

Dear Mr. Keppler:

This ' letter telecopied to your office, provid.es written confirmation of a prompt notification pursuant to DAEC Technical Spacifications, Appendix A, Section 6.11.2.a.7.

~

On the morning of 8/3/83,'at approximately 0317 while performing. periodic surveillance testing on the RCIC System, discharge pressur,e instrument-PI 2506 displayed erroneous indications. Although this instrument.provides no automatic control functio _n, its failure prevents confirming RCIC discharge ~ pressure and flow as required in our surveillance procedure. The RCIC System, therefore,,

was declared inoperable.

In accordance with DAEC technical spacifications, Appendix A, surveillance testing of the HPCI and other. systems commenced.

~

At approximately 0417 hours0.00483 days <br />0.116 hours <br />6.894841e-4 weeks <br />1.586685e-4 months <br />, HPCI turbine speed indication failed downscale.

Although this instrument also performs no automatic' control function, HPCI was declared inoperable.

Pursuant to technical specification 6.11.2.a and 10 CFR 50.72, notifications were made to the NRC and an unus'eal event declared: 'An orderly shutdown was initiated in accordance with Technical Specification 3.5.D.3.

t

?-

Very truly yours, 8308220137 830803 PDR ADOCK 05000331 Daniel L. Mineck S

PDR Plant Superintendent - Nuclear Duane Arnold Energy Cer.ter DLM/WJM/pf cc: NRC Resident Inspector 081983 sunw anwho energy amer. In nos an cake mpkk,1cmu swm. 31stassan

-[f)y