Georg=a Power Company 333 Piedmont Avenue Atlanta, Georgia 30308 Telephone 404 526-7726

[fg Maing Address:

/

,}

Post Othce Box 4545

'~t ii Atlanta, Georg:a 30302 83 Au@pr@per D. o. Foster the southern ei x.ac s t

Vice President and General Manager V9"*""'

August 15, 1983 United States Nuclear Regulatory Commission Office of Inspection and Enforcement File: X78G03 - M46 Region II - Suite 3100 L g:

GN-251 101 Marietta Street Atlanta, Georgia 30303

Reference:

Vogtle Electric Generating Plant - Units 1 and 2 50-424,50-425; Pullman Power Products Hanger Reinspection Findings Attention: Mr. James P. O'Reilly Gentlemen:

On July 15, 1983, Mr. C. W. Hayes of Georgia Power Company reported a potential deficiency to the USNRC concerning numerous discrepancies identified by Georgia Power Company Construction and Q. A. personnel in the installation of pipe supports. The reinspection was initiated due to questions raised by the USNRC Construction Assessment Team.

The reinspection team examined approximately 100 pipe hanger installations and due to the number of discrepancies identified, recommended that project management review the situation in more ' depth. On July 24, 1983, Georgia Power Company organized a task force of cognizant personnel to per-form an in-depth review and evaluation of the Pullman Power Products Program for the installation of piping systems, focusing heavily on pipe support

-installation and inspection.

At this time, Georgia Power Company cannot commit to a schedule for resolving this cor.cern.

Georgia Power Company intends to submit an interim report on this concern to the NRC by November 18, 1983.

This response contains no proprietary information and may be placed in the NRC Public Document Room upon receipt.

You-uly e

D. O. Fost r D0F/REF/cc xc:

U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C.

20555 R. J. Kelly R. H. Pinson E. D. Groover D. O. Foster B. M. Guthrie L. T. Gucwa G. F. Head R. A. Thomas M. Malcom

(

J. T. Beckham Jr.

J. A. Bailey G. Bockhold l

D. N. MacLemore

0. Batum P. D. Rice l

D. E. Dutton H. H. Gregory III J. L. Vota W. F. Sanders R. E. Folker gCON

,y 8308220133 830815 g JL b PDR ADOCK 05000424 S

PDR

..