Interim Deficiency Rept,Item 87 Re Possible Brown Boveri Ite Circuit Breaker Failures Due to Defective Capacitor in Trip Circuit.Initially Reported on 830304.Replacement Solid State Trip Devices to Be Installed
ML20076B518
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 08/02/1983
From: Wells D
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, EF2-64307, NUDOCS 8308190389
Download: ML20076B518 (2)


Text

. __ _

... w, 4 Donald A Wells Meaum oo uf M .meo (113; .*17'M M Ecison Efn?E==

August 2, 1983 EF2-64307 1 Mr. Jamon G. Keppler, Regional Administrator Region III U. S. Nuclear Reguintory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 i

Subject:

Interim Report of 10CFR50.55(e) Item on Possible ITE Circuit Brenker Failures (#87) l l

Dear Mr. Keppler:

This interim report involving ITE circuit breaker failures has been prepared to provide the current status of this problem.

This item was originally reported to Mr. P. Pelke of NRC Region III by

]

Detroit Edison's Mr. D. Ferencz, Acting Supervisor - Construction Quality Assurance on March 4,1983.

f A memo received f rom the NRC, concerning Brown Boveri Electric, Inc.

4 (formerly ITE) low voltage circuit breakers, described a problem involving a defective capacitator in the trip circuit which, upon failure, prevents the breaker from opening during an overcurrent condition. The failure of this capacitator and the trip device can result in failure to interrupt a fault.

The Edison Startup Organization has completed a survey of all solid l state trip devices in the 480V switchgear at Fermi 2. The survey found one hundred thirty (130) devicca equipped with a Type 400 capacit stor, which has been found to degrade over time.

Detroit Edison is awaiting a shipment of rep 1ncement solid state trip devices from Brown Bovert Electric, Inc. for all one hundred thirty devices.

i Another report on this item, either interim or finni, will be sent when further information is available. If you have questions concerning this matter, please contact Mr. G. M. Trahey, Assistant l Director - Project quality Assurance.

0308190309 030002

} '

DR ADOCK 05000 Very truly yours, t ,S. AN'~

p t s mL

s i

4 Mr. James G.-Keppler,. Regional Administrator 1

August 2, 1983-EF2-64307 4 Page 2 DAW /WEM/pn

.i

! cc: Mr. Richard DeYoung, Director Office of Inspection and Enforcement i

U. S. Nuclear Regulatory Commission l

Washington, D. C. 20555 j Mr. Paul Byron, Senior Resident Inspector U. S. Nuclear Regulatory Commission 6450 North Dixie Highway Newport, MI 48166 4

4 e

2 1

l 4

i l

I i

I

, - , _ _ , , - , _ . , . . , - - - - - - , , , . . , - - - - , . . , , . . ~ - - _ .

, . ~ . - , , - . , - - , ,-.m,. - . . , _ ,. , , . - .. ,-, - - . ~ - , - --,.+y . - . , . - , -- - - _ . -