Provides Partial Response to IE Bulletin 83-05, ASME Nuclear Code Pumps & Spare Parts Mfg by Hayward Tyler Pump Co. Spare Parts Used But No Original Pumps Mfg by Hayward
ML20076B425
Person / Time
Site: Midland
Issue date: 08/10/1983
From: Buckman F
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
REF-SSINS-6820 IEB-83-05, IEB-83-5, NUDOCS 8308190352
Download: ML20076B425 (3)


Text

,

P Consumers P0Mr F ' d '** * ===* - a Executive Afanager O

Afidland Project Office General offices: 1945 West Parnall Road, Jackson, MI 49201 * (517) 788-1933 August 10, 1983 J G Keppler, Administrator US Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 MIDIAND ENERGY CENTER MIDLAND DOCKET NOS 50-329, 50-330 IE BULLETIN 83-05 ASME NUCLEAR CODE PUMPS AND SPARE PARTS MANUFACTURED BY THE HAYWARD TYLER PUMP COMPANY" FILE: 0505.12 SERIAL: 23900

REFERENCE:

(1) F W BUCKMAN TO J G KEPPLER DATED AUGUST 10, 1983 SERIAL 23902 1

(2) R C DEYOUNG TO J W COOK DATED MAY 19, 1983 This letter provides a partial response to IE Bulletin 83-05.

Consumers Power Company has determined that no pumps which are used in safety-related systems in the Midland Plant and are original equipment, were manufactured by the Hayward Tyler Pump Company (HTPC). However, Consumers Power Company has determined that spare parts for several pumps used in safety-related systems at the Midland Plant were procured from HTPC. These spare part procarements were initiated following Hayward Tyler's acquisition of the B&W Canada pump Company.

The pumps involved, their service application and associated HTPC spare parts has'been tabulated and transmitted as proprietary information in referenced-letter (1). This-information is being treated as proprietary per the NRC follow-up letter, reference (2) above.

CPCo is presently evaluating whether the additional cost associated with testing the limited number of spare parts affected is justifiable.

Specifically, CPCo is essessing whether replacement of the affected spare parts is more cost effective than the required additional testing of them.

Depending on the results of this study, CPCo will either replace the parts in question or propose an acceptable testing procedure for NRC approval.

CPCo plans to submit a complete response to Bulletin 83-05 for the Midland Plant by December 12, 1983. This date is consistent with Bulletin 8300190352 830810 PDR ADOCK 05000329 G

PDR AUG 151883 -

oc0883-0346a100 L

15/! $

2 requirements to complete actions prior to issuance of an Operating License for Midland which is presently expected by October 1984.

4bu-r FWB/MFC/bjw CC RJCook, Midland Resident Inspector MAMiller, Midland Project Manager, US NRC l

oc0883-0546a100

r-CONSUMERS POWER COMPANY Midland Units 1 and 2 Docket No 50-329, 50-330 r.etter Serial 23900 Dated August 10, 1983 At the request of t.he Commission and pursuant to the Atomic Energy Act of 1954, and the Energy Reorganization Act of 1974, as amended and the Commission's Rules and Regulations thereunder, Consumers Power Company submits a partial response to IE Bulletin 83-05.

CONSUMERS POWER COMPANY

~By si1Atw W

^ F W Buckman, Executive Dire Midland Project Office Sworn and subscribed before me this //

ay of

>>Au/)h, /[8 gi