ML20076A822

From kanterella
Jump to navigation Jump to search
Corrects Final Deficiency Rept 83-01 Re Riley Temp Indicating Switches.Riley Temp Switches Not Recalibr to Modified Calibr Procedure.Calibr to Be Done Prior to Fuel Load
ML20076A822
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 08/08/1983
From: Schroeder C
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, 7106N, 83-01, 83-1, NUDOCS 8308180346
Download: ML20076A822 (1)


Text

['O t

^ Commonwealth

" Edison

) one First National Plata. Chictgo, Illinois "J Address Reply to: Post Office Box 767 (j Chicago, Illinois 60690 August 8, 1983 Mr. James G. Keppler, Director - Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137

Subject:

LaSalle County Station Unit 2 10CFR50.55(e) Notification 83-01 Correction to Final Report, Riley Temperature Indicating Switches NRC Docket No. 50-374 Reference (a): C.W. Schroeder letter to J.G. Keppler dated March 16, 1983.

(b):

C.W. Schroeder letter to J.G. Keppler dated May 3, 1983.

(c): C.W. Schroeder letter to J.G. Keppler dated June 3, 1983.

Dear Mr. Keppler:

4 The purpose of this letter is to correct a statement made in Reference (c). The Unit 2 Riley temperature switches have not yet been recalibrated to the modified calibration procedure suggested by Riley, i ~ 0nly the Unit 1 temperature switches have been recalibrated at this time.

We will complete the calibration on Unit 2, using the same calibration procedure as Unit 1, prior to fuel load.

If there are any questions in this matter, please contact this office.

Very truly yours,

, k C.W. Schroeder l

Nuclear Licensing Administrator 1m cc: Region III Inspector - LSCS Director of Enforcement & Inspection 8308190346 830808

-7106N PDR ADOCK 05000374 S PDR gg ly, DO

_ ggp

- ,_