MONTHYEARML20217F1041999-10-14014 October 1999 Proposed Tech Specs Pages,Revising TS Sections 2.2 & 3.0/4.0,necessary to Support Mod P000224 Which Will Install New Power Range Neutron Monitoring Sys & Incorporate long- Term thermal-hydraulic Stability Solution Hardware ML20217B9061999-10-0101 October 1999 Proposed Tech Specs Re Control Rod Block Instrumentation ML20212H5681999-09-27027 September 1999 Proposed Tech Specs Pages,Revising TS to Clarify Several Administrative Requirements,Delete Redundant Requirements & Correct Typos ML20216J3471999-09-27027 September 1999 Corrected Tech Specs Page,Modifying Appearance of TS Page 3/4 4-8 as Typo Identified in Section 3.4.3.1 ML20212H5261999-09-27027 September 1999 Proposed Tech Specs Pages,Revising TS Re Loss of Power Setpoints for 4 Kv Emergency Buses ML20210N0801999-08-0606 August 1999 Proposed Tech Specs Incorporating Note Which Will Permit one-time Exemption Until 990930,from 90 F Limit Stated in SR 3.7.2.2 ML20210E6001999-07-21021 July 1999 Proposed Tech Specs,Deleting Requirement for Refuel Platform Fuel Grapple Fully Retracted Position Interlock Currently Required by TS Surveillance Requirement 3.9.1.1 ML20209F7751999-07-12012 July 1999 Proposed Tech Specs Sections 2.1.1.2 & 5.6.5,incorporating Revised SLMCPR Due to Use of Cycle Specific Analysis & Deleting Previously Added Footnotes Which Are No Longer Necessary ML20209D9861999-07-0808 July 1999 Proposed Final Tech Spec Pages Correcting Minor Administrative Errors in Figure Showing Site & Exclusion Boundaries & Two SRs ML20209B9211999-07-0101 July 1999 Proposed Tech Specs,Reflecting Change in Corporate Structure ML20196F5551999-06-22022 June 1999 Proposed Tech Specs Pages to Delete Surveillance Requirement 4.4.1.1.2 & Associated TS Administrative Controls Section 6.9.1.9.h,removing Recirculation Sys MG Set Stop ML20196A5441999-06-14014 June 1999 Proposed Final Tech Spec Pages for License Change Request ECR 98-01802 Re Installation of Digital Power Range Neutron Monitoring (Prnm) Sys & Incorporation of long-term thermal- Hydraulic Stability Solution Hardware ML20195H0651999-06-0909 June 1999 Revised Bases Pages B 3/4 10-2 & B 3/4 2-4 for LGS Units 1 & 2,in Order to Clarify That Requirements for Reactor Enclosure Secondary Containment Apply to Extended Area Encompassing Both Reactor Enclosure & Refueling Area ML20195G0481999-06-0707 June 1999 Proposed Tech Specs Section 3/4.4.3, RCS Leakage,Leakage Detection Systems, Clarifying Action Statement Re Inoperative Reactor Coolant Leakage Detection Systems ML20195E7611999-06-0707 June 1999 Proposed Tech Specs Table 3.6.3-1 & Associated Notations, Reflecting Permanently Deactivated Instrument Reference Leg Isolation Valve HV-61-102 ML20195B8431999-05-26026 May 1999 Proposed Tech Specs Section 4.1.3.5.b,removing & Relocating Control Rod Scram Accumulators Alarm Instrumentation to UFSAR & TS Section 3.1.3.5,allowing Alternate Method for Determining Whether Control Rod Drive Pump Is Operating ML20195B8271999-05-25025 May 1999 Proposed Final Tech Specs Pages for License Change Application ECR 96-01511 Re Rev to Loss of Power Setpoints for 4 Kv Emergency Buses ML20206C5821999-04-20020 April 1999 Rev 4 to RW-C-100, Solid Radwaste Sys Process Control Program (Pcp) ML20205F6391999-03-29029 March 1999 Proposed Tech Specs Pages,Deleting Requirement for Refuel Platform Fuel Grapple Fully Retracted Position Interlock Currently Required by TS Surveillance Requirement 3.9.1.1 ML20207L6591999-03-11011 March 1999 Proposed Tech Specs Section 2.1, Safety Limits, Revising MCPR Safety Limit ML20207E2551999-03-0101 March 1999 Proposed Tech Specs Supporting PBAPS Mod P00507 Which Will Install Power Range Neutron Monitoring Sys Incorporate long-term T/H Stability Solution Hardware ML20199G2021999-01-12012 January 1999 Proposed Tech Specs Section 3/4.4.2 & TS Bases Sections B 3/4.4.2,B 3/4.5.1 & B 3/4.5.2 to Increase Allowable as-found Main Steam SRV Code Safety Function Lift Setpoint Tolerance from +1% to +3% ML20199A7271999-01-0404 January 1999 Proposed Tech Specs Revising Administrative Section of TS Re Controlled Access to High Radiation Areas & Rept Dates for Annual Ore Rept & Annual Rer Rept ML20202E6251998-12-31031 December 1998 PBAPS Unit 2 Cycle 13 Startup Rept. with ML20198N2531998-12-24024 December 1998 Proposed Tech Specs Revising Setpoints & Limits of Allowable Values for LOP Instrumentation for 4kV Emergency Buses Contained in TS Table 3.3.8.1-1, LOP Instrumentation ML20195J1541998-11-16016 November 1998 Rev D to PBAPS Emergency Preparedness NUMARC Eals ML20195J1651998-11-16016 November 1998 Rev D to LGS Emergency Preparedness NUMARC Eals ML20155H6401998-10-30030 October 1998 Proposed Tech Specs Pages Revising TS SRs 4.8.4.3.b.1, 4.8.4.3.b.2 & 4.8.4.3.b.3 in Order to Reflect Relay Setpoint Calculation Methodology ML20154Q8941998-10-15015 October 1998 Proposed Tech Specs Re Addition of Special Test Exception for IST & Hydrostatic Testing ML20154L3971998-10-13013 October 1998 Revised Tech Spec Bases Pages,Clarifying Thermal Overload Operation for Motor Operated Valves with Maintained Contact Control Switches ML20154C8271998-09-29029 September 1998 Proposed Tech Specs SR 3.6.4.1.2,revising Wording to Maintain Requirement That Secondary Containment Is Not Breached at Any Time When Secondary Containment Is Required ML20151Y3841998-09-14014 September 1998 Revised Proposed Final TS Pages for License Change Application ECR 97-02809,incorporating end-of-cycle Recirculation Pump Trip Sys at Units 2 & 3 ML20151Z4721998-09-14014 September 1998 Proposed Tech Specs Revising Table 4.4.6.1.3-1,re Withdrawal Schedule for Reactor Pressure Vessel Matl Surveillance Program Capsules ML20151Y3711998-09-11011 September 1998 Proposed Final TS Pages for License Change Application ECR 98-01403,revising SLMCPRs for Unit 2 ML20151Y3651998-09-11011 September 1998 Proposed Final TS Pages for License Change Applications ECR 96-02324 & 98-00499,revising MSIV Leakage & Safety Relief Valve Surveillance Testing ML20151V0951998-09-0404 September 1998 Proposed Tech Specs Ensuring Fidelity Between TS Pages & 970324 Submittal ML20151T0421998-08-31031 August 1998 Proposed Final Tech Specs Pages for License Change Application ECR 97-02809,incorporating end-of-cycle Recirculation Pump Trip Sys at Plant ML20236W2201998-07-29029 July 1998 Proposed Tech Specs,Supporting Installation of Mod P00271 for Unit 2 Re Replacement of Source Range & Intermediate Range Monitors W/New Wide Range Neutron Monitoring Sys ML20236R3121998-07-10010 July 1998 Proposed Tech Specs Pages for License Change Application ECR 98-01403,revising TS Section 2.0.W/non-proprietary Addl Info Re 1.10 Cycle Specific SLMCPR Cycle 13 ML20236P7531998-07-0909 July 1998 Proposed Tech Specs Supporting Installation of Mod P00271, for Unit 2 Re Facility Operating License Change Request 93-18 ML20236M1221998-07-0202 July 1998 Proposed Tech Specs Change Request 96-06-0,modifying FOL Page 8 ML20247C2611998-05-0101 May 1998 Proposed Tech Specs Deleting Requirements for Functional Testing of SRVs During Each Unit Startup ML20217K3651998-04-28028 April 1998 Proposed Tech Specs Bases Through Unit 2 Bases Rev 17 & Unit 3 Bases Rev 19 ML20217K5291998-04-24024 April 1998 Proposed Tech Specs Page 6-18a Revising MCPR Safety Limit for Lgs,Unit 1,cycle 8 ML20206C5711998-04-16016 April 1998 Rev 11 to ODCM for Pbaps,Units 1 & 2 ML20217G7531998-03-20020 March 1998 Proposed Tech Specs Re end-of-cycle Recirculation Pump Trip Sys at Plant ML20217Q4711998-03-0202 March 1998 Proposed Tech Specs Adding Requirements to Achieve Compliance w/10CFR50.36a, TS on Effluents from Nuclear Power Reactors ML20202G7871998-02-0909 February 1998 Proposed TS Section 2.1, Safety Limits, Revising MCPR Safety Limit.Nonproprietary Supporting Info Encl ML20202F4201998-02-0404 February 1998 Proposed Tech Specs Revising SR 3.6.4.1.2 & Associated Bases to Reflect Changes in Requirements for Secondary Containment Doors ML20202H4141998-01-31031 January 1998 Cycle 12 Startup Rept Unit 3 1999-09-27
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20206C5821999-04-20020 April 1999 Rev 4 to RW-C-100, Solid Radwaste Sys Process Control Program (Pcp) ML20195J1541998-11-16016 November 1998 Rev D to PBAPS Emergency Preparedness NUMARC Eals ML20195J1651998-11-16016 November 1998 Rev D to LGS Emergency Preparedness NUMARC Eals ML20206C5711998-04-16016 April 1998 Rev 11 to ODCM for Pbaps,Units 1 & 2 ML20198N8061997-12-31031 December 1997 NPDES Permit PA-0052221 Study Plan for Fecal Coliform Bacteria in Pont Pleasant Water Diversion Sys During May- Sept 1998 ML20203H2501997-12-31031 December 1997 Rev 19 to Odcm ML20211P9471997-10-15015 October 1997 Revised MSRV Tailpipe Temp Action Plan ML20141J0311997-05-0808 May 1997 Rev 7 to Pump & Valve IST Program Third Ten Yr Interval ML20203H2701997-04-30030 April 1997 Rev 18 to Odcm ML20217M8301997-01-30030 January 1997 Rev 10 to ODCM, for Peach Bottom Atomic Power Station Units 1 & 2 ML20138B0081996-09-27027 September 1996 Rev 3 to Solid Radwaste Sys Process Control Program (Pcp) ML20113E0491996-06-28028 June 1996 Technical Basis & Description of Approach for Review Method Selection ML20107L9271996-01-0303 January 1996 Offsite Dose Calculation Manual,Rev 9,Peach Bottom Atomic Power Station Units 2 & 3 ML20100L9131995-11-30030 November 1995 Rev 17 to LGS Units 1 & 2 Odcm ML20094B5391995-10-24024 October 1995 Scenario Manual for Limerick Generating Station Emergency Preparedness Annual Exercise (Radiological Scenario) ML20094B5041995-10-24024 October 1995 Scenario Manual for Limerick Generating Station Emergency Preparedness Annual Exercise (General Scenario) ML20095G0791995-09-22022 September 1995 Addendum 1 to Rev 2 to ISI Program Second Ten Yr Interval Units 2 & 3 for Peach Bottom Atomic Power Station ML20092C6141995-08-23023 August 1995 Rev 2 to Fabrication Spec 25A5601, Fabrication of Shroud Stabilizer ML20100L9051995-05-0808 May 1995 Rev 16 to LGS Units 1 & 2 Odcm ML20100L9001995-01-19019 January 1995 Rev 1 to RW-C-100, Solid Radwaste Sys Pcp ML20080N1461994-12-31031 December 1994 Rev 15 to LGS Units 1 & 2 Odcm ML20086A5531994-09-29029 September 1994 Rev 6 to GP-23, Diesel Generator Outages ML20073J7311994-09-24024 September 1994 Rev 1 to Fabrication Spec 25A5601, Fabrication of Shroud Stabilizer ML20073J7171994-09-24024 September 1994 Rev 1 to Design Spec 25A5579, Shroud Stabilizer Hardware ML20073J7251994-09-24024 September 1994 Rev 1 to Core Design Spec 25A5580, Shroud Stabilizers ML20073J7701994-09-24024 September 1994 Rev 0 to Installation Spec 25A5581, Stabilizer Installation ML20086A5211994-09-16016 September 1994 Rev 5 to Administrative Guideline Procedure AG-43, Guideline for Performance of Sys Outages ML20073F5441994-09-12012 September 1994 Shroud Stabilizer Hardware Legend or Description of Groups ML20073F5541994-09-12012 September 1994 Shroud Stabilizers Legend or Description of Groups ML20073F5671994-09-0909 September 1994 Fabrication of Shroud Stabilzer Legend or Description of Groups ML20073F5331994-08-31031 August 1994 Rev 0 to GENE-771-54-0894, Project Instruction Shroud Repair for H1 Through H7 Welds for PECO Energy Peach Bottom Atomic Power Station ML20073F6811994-08-29029 August 1994 Draft Rev 0 to Installation Spec 25A5581, Stabilizer Installation ML20073S9471994-06-21021 June 1994 Non-proprietary Revised Emergency Response Procedures, Including Revs 43 & 44 to Index,Rev 10 to ERP-300 & Rev 9 to & ERP-500 ML20080N1401994-06-0909 June 1994 Rev 14 to LGS Units 1 & 2 Odcm ML20080N1291994-06-0606 June 1994 Rev 13 to LGS Units 1 & 2 Odcm ML20080N1171994-04-30030 April 1994 Rev 12 to LGS Units 1 & 2 Odcm ML20056G0941993-07-0101 July 1993 Rev 5 of ODCM for Pbaps,Units 2 & 3 ML20056G0981992-12-28028 December 1992 Rev 0 to Procedure RW-C-100, Solid Radwaste Sys Pcp. Procedure Supersedes RW-800 at LGS & RW-120 & RW-121 at PBAPS ML20098D9641992-05-20020 May 1992 Rev 57 to Limerick Generating Station Off-Normal (on) (Bases) Procedures Index,Reflecting Rev 0 to ON-123 Bases, Mispositioned Control Rod ML20098D9501992-05-18018 May 1992 Rev 0 to Off-Normal (on) Procedure ON-123 Bases, Mispositioned Control Rod ML20098D9451992-05-18018 May 1992 Rev 0 to Off-Normal (on) Procedure ON-123, Mispositioned Control Rod ML20113G9421992-05-0101 May 1992 Rev 2 to Spec ML-008, Limerick Generating Station,Units 1 & 2 First Ten Yr Interval Pump & Valve IST Program ML20094S5671992-04-0303 April 1992 Rev 54 to Operational Transient Procedures Index ML20094S5881992-04-0303 April 1992 Rev 54 to Operational Transient Bases Procedures Index ML20094S5751992-04-0101 April 1992 Rev 9 to OT-100 Bases, Reactor Low Level - Bases ML20094S5931992-04-0101 April 1992 Rev 9 to OT-100 Reactor Low Level ML20091N2791991-10-0404 October 1991 Inservice Insp Program, First 10-Yr Interval ML20085E4601991-07-12012 July 1991 Rev 2 to M-710, Peach Bottom Atomic Power Station Units 2 & 3 Spec for Pump & Valve Inservice Testing Program Second 10-Yr Interval ML20082L8791991-06-0606 June 1991 Rev 4 to ODCM ML20065S1171990-12-0606 December 1990 Procedures Index to Rev 2 to ON-120 Bases, Fuel Handling Problems 1999-04-20
[Table view] |
Text
"
!!PC/CO-6."
, Page 1 of 3 E .
PllILADEf.'PHIA ELECTRIC COMPA!PI EEKClfisOTTOM UNITS 2 AND 3 11PO/CO-65 FIELD USE OF A LOW VOLUME PORTABLE AIR SAMPLER ,
PURPOSE:
This procedure lists the steps required to place the F.ade Co. Model 1: 209-and H 809B2 low volume air samplers in service to collect a sample during l
an emergency to determine the concentration of airborne particulate and radioactive iodine.
REFEREN'C'E :
None ~
,.4 PREREQUISITES,:
Nono
.P.R.OC. EDURE :
A. Rado Co. Model II 809C Battery Powered Air Sampler
- 1. Remove the protective covering form a Iodine swpling car tridge (Silver Zeolight) and mark the cartridge to indicate the direction of air flow through it.
- 2. Remove the retaining ring from the filter holder on the sarupler and place the cartridge in the holder. Check that the cartridge seath properly and that the cartridge is installed as the flow marking indicates.
- 3. Place a piece of filtet paper on the surface of the holder and replace the retaining ring.
- 4. Attach the black jumper cable (ground) to any availabla contact on the car fra:ve/or fender. Attnch the red junper cable to the positive Dattery terminal. Start the car and let it idic during sampling.
- 5. Start the air samplcr. Inspect the filter for tears and leakage paths. Read the flow motor and determine the tinc recuired to sample 60 ft3 of air. If a smaller saceJe volume is requested by the Radiation Survey Team Leader or Emerrtency Director reduce t.he sempling time to obtain a smaller sampic -.nd make a corrcction m for the cmaller sample volume when the activity in calculated (IIPO/CO-64 and 67).
- 6. Record date, time, f]ow rate, sample location, and your initials on the envelope which will be used to transport the sample.
8305180431 830516 PDR ADOCK 05000352 E PDR
, , HPO/CO-65
.PIge 2 of 2 , "
i
- 7. Record time at the end of the sample period and the flow meter reading on the transport envelope.
O 8. Turn the air sampler off. Remove the black jumper cable first, and then remove the red jtucper cable.
J
- 9. Remove the filter paper and analyze it in accordance with procedure HPO/CO-64. .
- 10. Remove the iodine cartridge and analyze it in accordance with pracedure HPO/CO-67. Procedure HPO/CO-64 may be used as an alternate to HPO/CO-67.
- 11. If later laboratory analysis is required, package both samples for transport.
B. Rade Co. Model H 809B2 Portable Battery Powered Air Sampler l '. ' Remove the' protective covering from a Iodine' sampling cartridge (Silver Zeolight) and mark the cartridge to indicate the direction of air flow through it.
A
- 2. Remove the retaining ring from the filter holder on the sampler and place the cartridge in the holder. Check that the cartridge is installed as the air flow markings indicate.
- 3. Place a piece of filter paper on the surface of the holder and replace the retaining ring.
- 4. Set appropriate sampling time by adjunting thumb wheels.
Sampler will automatically shut off at pre-set time. .
- 5. Depress START button (sample run can be manually stopped by depressing the STOP button) to turn the air sampler on.
Inspect the filter for tears and leakago paths. Read the 3 flow meter and determine the time required to sampic 60 ft of air. If a smaller sample volume is requested by the Radiation Survey Team Leader or Emergency Director reduce the sampling time to obtain a smaller sample and make a correction
^
for the smaller sample volume when the activity is calculated (HPO/CO-64 and 67) .
l 6. Record date, time on, flow rate (indicated by rotometer), sample location and initials of technician on the envelope which wil]
be used to transport the saeple. .
- 7. Record time at the end of the sample period and the flow meter reading on the transport envelope.
- 8. Unit will stop at the end of the sample time or when the STOP button is depressed.
- 9. Remove the filter paper and analyze it in accordance with j procedure HPO/CO-64.
- 10. Remove the iodino cartridge and analyze it in accordance with procedure HPO/CO-67. Procedure HPO/CO-64 may be used as an alternate
(
to !!PO/CO-67.
- 11. If later laboratory analysis in rcquired, package both sampics
- . - . .-. -- - - . . . - . - - . . - - - _ . - - . . , , . - - - - - . - .