ML20074B068

From kanterella
Jump to navigation Jump to search
Forwards Preliminary Design Assessment of Byron/Braidwood Generating Station & Control Room Human Factors Engineering Review, Suppls I & II
ML20074B068
Person / Time
Site: Byron, Braidwood, 05000000
Issue date: 05/09/1983
From: Swartz E
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20074B069 List:
References
RTR-NUREG-0660, RTR-NUREG-0737, RTR-NUREG-660, RTR-NUREG-737 6546N, NUDOCS 8305180385
Download: ML20074B068 (1)


Text

-

/^NO Commonwealth Edison

) One First Nationit Ptiza, Chicago, Ilhnois (C7 Address Reply to: Pkst Office Box 767

/ Chicago, tilinois 606v0 May 9, 1983

- Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washingtc;i, DC 20555

Subject:

Byron Station Units 1 and 2 Control Room Preliminary Design Assessment - Supplements I and II NRC Docket Nos. 50-454/455 Reference (a): T. R. Tramm letter to H. R. Denton dated November 12, 1981

Dear Mr. Denton:

Reference (a) provided the preliminary assessment of the Byron Statio.n control room in response to NUREG 0660 Task Action Plan Item I.D.l. The purpose of this letter is to provide Supplements I and II to that report as required by Section 18.0 of the Byron SER.

One (1) signed original and forty (40) copies of this letter with Attachment are provided for your use.

Very truly yours

[ _

E. Douglas Swa z Nuclear Licensing Administrator Attachment ,

6546N gf

'[49 8305100385 830509 PDR ADOCK 05000 A

_ . . _ . . . _ _ ._