ML20074B050
| ML20074B050 | |
| Person / Time | |
|---|---|
| Site: | Duane Arnold |
| Issue date: | 05/13/1983 |
| From: | Mineck D IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML20074B051 | List: |
| References | |
| DAEC-83-373, NUDOCS 8305180346 | |
| Download: ML20074B050 (1) | |
Text
-
?
o el gr8 Iowa Electric Light and Ibwer Company May 13, 1983 DAEC-83 373 Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Attn: Document Control Desk
Subject:
Monthly Operating Report File:
A-118d, TE-5
Dear Sirs:
Please find enclosed 12 copies of the Duane Arnold Energy Center Monthly Operating Report for April,1983.
In addition, revised operating data reports for the months of February and March 1983, are provided. These revisions correct minor numeric errors in these previous reports. The report has been prepared in accordance with the guidelines contained in Regulatory Guide 1.16 and distribution is being made in accordance with DAEC Technical Specifications, Appendix A, Section 6.11.1.c and Regulatory Guide 10.1.
Very truly yours, O
()) n r
(
Daniel L. Mineck Plant Sunerintendent - Nuclear Duane Ar nold Energy Center DLM/MWA/pf*
~
Enclosures cc:
B. Peterson Director, Office of Inspection and 7
J Rehnstrom Enforcement L. Root U. S. Nuclear Regulatory Commission
,y H. Rehrauer Region III E. Matthews 799 Roosevelt Road W. Bryant Glen Ellyn, IL 60137 (1)
R. Salmon D. Mineck Director, Office of Management Information B. York and Program Control D. Wilson U. S. Nuclear Regulatory Commission R. Hannen Washington, D. C. 20555 (1)
D. Teply Dennis Murdock George Toyne NRC Site Inspector F. Apicella 8305180346 830513
~
DR ADOCK O5000 gv cemer. P.O. Bos 331. Cedar 11apids, Iowa 5:40s. 319:851 ~s11