ML20073T305
| ML20073T305 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 05/05/1983 |
| From: | Trammell C Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20073T301 | List: |
| References | |
| TAC-51419, NUDOCS 8305110230 | |
| Download: ML20073T305 (2) | |
Text
7590-01
.{
~
UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-336 NORTHEAST NUCLEAR ENERGY COMPANY, ET AL.
NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U.S. Nuclear Regulatory Comission (the Comission) has issued Amendment No. 85 to Facility Operating License No. DPR-65, issued to The Connecticut Light and Power Company, The Hartford Electric Light Company, Western Massachusetts Electric Company, and Northeast Nuclear Energy Company (the licensees), which temporarily revised the Technical
.~
Specifications (TS) for operation of the Millstone Nuclear Power Station Unit i:o. 2 (thh facility) located in the Town of Waterford, Connecticut.
The amendment was effective upon the date of its issuance.
The amendment ~added a footnote to 3.9.4.a to allow the'use of a temporary equipment hatch door to maintain containment integrity during fuel movement or core alterations while the Unit is shutdown for Cycle 6 refueling.
The application for the amendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations. The Comission has made appropriate findings as required by the Act and the Comission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment.
Prior public notice of the amendment was not required since the amendment does not involve a significant hazards consideration.
~
l 8305110230 830505 t
PDR ADOCK 05000336 P
PDR l
7590-01 c
2-The Commission has determined that the issuance of the amendment will not result in any significant environmental impact and that pursuant to 10 CFR 151.5(d)(4) an environmental impact statement, or negative declaration and environmental impact appraisal need not be prepared in connection with issuance of the amendment.
For further details with respect to this action, see (1) the applica-tion for amendment dated April 25,1983,(2) Amendment No. 85 to License l'o. DPR-65 and (3) the Commission's related Safety Evaluation. All of these itemc are available for public inspection at the Commission's Public Document Roon,1717 H Street, N.W., Washington, D.C. and at the Waterford l
Public Library," R' ope Ferry Road, Waterford, Connecticut.'
A copy of items (2) and (3) may be obtained upon request addressed to the U. S. Nuclear Regulatory Commission, Washington, D. C.
20555, Attention: Director, Division of Licensing.
Dated at Bethesda, Maryland, this 5th day of May,1983.
FOR THE NUCLEAR REGULATORY COMMISSION
(.
- /./0~/t o -, d Charles M. Trammell, Acting Chief Operating Reactors Branch #3 Division of Licensing O
4 L_
_,_ -