6 Be ver Valley Power Station SNppingport, PA 15077-0004 JOHN O SIEBER Senior Vice President and (412) 393-5255
$*ar"eY.'ErS$*'on Fax (412) 643-8069 February 9, 1994
,U.
S. hup' ear Regulatory Commission
' Attn:
Document Control Desk Washington, DC 20555
Subject:
Beaver Valley Power Station, Unit No. 1 and No. 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Fitness-For-Duty Program Six Month Report In accordance with 10 CFR 26.71(d) attached is the Fitness-For-Duty Program Six Month Report for the period of July 1, 1993 through December 31, 1993.
If there are any questions concerning this report, Mr.
E.
P. Edwards at (412) 393-5288.
please contact Sincerely,
/
w D. Sieber Attachment cc:
Mr.
L.
W. Rossbach, Sr. Resident Inspector Mr.
T.
T. Martin, NRC Region I Administrator Mr.
G.
E. Edison, Project Manager
,r.m,n s +
o.
s 2...,;e,j,,y gp_c m-BICTRIC
.UIluTYof 9402160368 940209 THEYEAR DR ADOCK 0500 4
2/
ofn
Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 f
l DUQUESNE LIGHT COMPANY 12-31-93 Caneany a Mwes Enang BEAVER VALLEY POWER STATION tocenan i
JOHN M. MAURER, GEN. MGR., HUMAN RESOURCES (412)393-5238 Conna Name Phone enauos ares case)
Cutotts: ScreervConfirmaton (ng/mi)
$ Appendix A to 10CFR 26 Manjuana
/
Amphetamines
/
/
l Cocaine
/
Phencyclidine
/
/
Opiates
/
Alcohol (% BAC)
/
Testing Results Long-Term ShortJerm Licensee Employees Contractor Personnel Contractor Personnet Average Numoer with i
Unesconed Access 1,327 218 513 Categories Tested Positive Tested Postive Tested Positive l
Preeccess 91 0
29 0
940 5
k Post accident 0
Observed behavor i
o Random 647 2
108 1
262 2
I Follow-up 5
0 1
0 22 0
Other l
Total l
744 2
138 1
1,224 i
~7 REV.1/92
D o
4 e
0 4
0 A
1 e
5 4
3 2
1 lats s e uT fe o Rt o
s h
y 1
3 e
oc c
lA na ts b
gne i i u
mid S
tl c P
c if i
s c
e e h n e
pi p
m ma S
At ro s
f e
t s
t iap se O
Te en v
y 1
2 i
i a
t c
i o
s C
oP an d
a 5
5 u
e ji m
ra r
M ifn s
s r
o r
s o
o C
e d
c t
e a
a f
y r
r t
o o
n n
t l
n p
o o
m C
C w
E m
m o
r e
r d
e e
e k
s T-T-
t n
g l
r a
e n
o a
t e
c o
h o
i r
L L
S T
B 4_
I FITNESS-FOR-DUTY REPORT PERFORMANCE DATA l
f MRO SIX (6) MONTH REPORT From July 1,
1993 through December 31, 1993, our records l
indicate two (2) confirmed positive tests in the random program for Duquesne Light Company employees.
Both employees
'l experienced denial of unescorted access, evaluation by the EAP Program and are presently participating in an intensive out-patient rehabilitation program.
One (1) employee, by job descript' ion ' and ' review of ' 10CFR, Part 26.73, proved reportable to 'the NRC Operation Center, by the Duquesne Light Company Security Department, on December 20, 1993 at 1715 hours0.0198 days <br />0.476 hours <br />0.00284 weeks <br />6.525575e-4 months <br />.
Report #26518'was.made to Operations Duty Officer Thomas Andrews.
The licensee was aware of the confirmed l
l positive test result on December 20, 1993 at 1130 hours0.0131 days <br />0.314 hours <br />0.00187 weeks <br />4.29965e-4 months <br />.