ML20073S022
| ML20073S022 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 02/09/1994 |
| From: | Horn G NEBRASKA PUBLIC POWER DISTRICT |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| IEB-93-003, IEB-93-3, NSD940148, NUDOCS 9402160289 | |
| Download: ML20073S022 (2) | |
Text
-
l COOPER NUCLEAR STATON
=~-
P.O. BOX 98. BROWNVILLE. NEBRASKA 68321 j Nebraska Public Power District
WE""
j NSD940148 February 9,1994 U.S. Nuclear Regulatory Commission j
Attention: Document Control Desk i
Washington, D.C. 20555
Subject:
Completion of Actions Pequested by NRC Bulletin 93-03, Cooper Nuclear Station, NRC Docket 50-298, DPR-46
Reference:
Letter from G. R. Horn (NPPD) to USNRC dated July 29,1993,
" Response to NRC Bulletin No. 93-03" Gentlemen:
l The Nebraska Public Power District (District) has completed the actions requested by NRC Bulletin No. 93-03, l
as comrnitted to in its earlier response (References 1). This notification fulfills the final reporting requirement specified in NRC Bulletin 93-03. As instructed by the bulletin, this information is being provided under oath.
NRC Bulletin 93-03, requested licensees to implement short term compensaroti actions, and hardware modifications necessary to ensure that Reactor Pressure Vessel (RPV) water level instrumentauou j*ign is of high functional reliability, with respect to the effect of noncondensible gases for long term system operation. Reference j
1, identified the hardware modification the District would install to address and resolve this issue.
l The District installed a continuous backfill system into the two divisional RPV water level instrumentation cold reference legs. This system uses a continuous backfill of water from the Control Rod Drive Hydraulic System to the cold reference legs (condensing chambers) in the Nuclear Boiler Instrumentation System. Acceptance testing was satisfactorily performed on this continuous backfill modification under various plant conditions and the backfill system was then placed into service for both divisions on January 21,1994, i
Pleas,e contact me if you have any questions or require any additional information.
a o-
. Horn Vice President - Nuclear GRH:tja/93-03.rrq cc:
NRC Regional Administrator i
Region IV Arlington, TX NRC Resident Inspector Cooper Nuclear Station l1Annr.n,
ggy; 9402160289 940209 h
i PDR ADOCK 05000298
' 4 7 7. & 3 3 ; ; ;
- .D
= = _ = = = = = = = = = = = = = = = = -..-.. - - -. -
.,,-,w
-,e
~n--
n,,
e.g--n.-.e
i
~
1 U. S. Nuclear Regulatory Commission February 9,1994 Page 2 of 2 1
i STATE OF NEBRASKA )
)
PLATTE COUNTY
)
G. R. Horn, being first duly sworn, deposes and says that he is an authorized representative of the Nebraska Public Power District, a public corporation and political subdivision of the State of Nebraska; that he is duly authorized to submit this response on behalf of Nebraska Public Power District; and that the statements contained herein are true to the best of his knowledge and belief.
k et- _. -
via "Ci. R. Horn l
Subscribed in my presence and sworn to before me this W day of DtLW
,1994.
O NAEN M[
"$$$M NOTARY PUBLl'C My Comm. Exn Dec.19,1995 l
i i
l
- -. i