Application for Amend to License DPR-79,proposing Changes to Ts,Which Will Revise Temporary License Condition That Extends Certain TS SR Interval to Coincide W/Unit 2 Cycle 6 Refueling Outage
ML20073R973
Person / Time
Site: Sequoyah 
Issue date: 02/08/1994
From: Fenech R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20073R974 List:
References
TVA-SQN-TS-94, NUDOCS 9402160206
Download: ML20073R973 (2)


Text

.

e.

]

i i

l A

i

[

Tennessee Valley Authonty, Post Omce Box 2000. Soddy-Daisy. Tennessee 37379-2000 I

I Robert A. Fenech I

Vice President. Segacyah Nuclear Plant

)

February 8, 1994 TVA-SQN-TS-94-02 10 CFR 50.90 l

U.S. Nuclear Regulatory Commission

+

ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

l i

In the Matter of

)

Docket No. 50-328 Tennessee Valley Authority

)

SEQUOYAH NUCLEAR PLANT (SQN) - TECHNICAL SPECIFICATION (TS) CHANGE 94-02, "0NE-TIME EXTENSION OF SURVEILLANCE REQUIREMENT (SR) INTERVALS - UNIT 2" i

l In accordance with 10 CFR 50.90, we are' enclosing a requested amendment to License DPR-79 to change the operating license of SON Unit 2.

The proposed change will revise a temporary. license condition that extends certain TS SR intervals to coincide with the Unit 2 Cycle 6 refueling outage. This request increases the extension approved by NRC in a letter j

to TVA dated November 9, 1993, " Issuance of Amendment (TAC No. M87697)

{

(TS 93-12)."

j

(

The proposed operating license change is identified'in Enclosure 1.

The l

justification for the proposed change is provided in Enclosure 2.

A proposed determination of no significant hazards consideration performed pursuant to 10 CFR 50.92 is provided in Enclosure 3.

A listing of SRs to be extended is provided in Enclosure 4.

1 TVA requests NRC approval of this operating license change request by April 1994 to support the extension of SRs that will exceed their l

allowable extension in accordance with TS 4.0.2 and NRC approved Amendment 162 for Unit 2 on April 15, 1994.

TVA requests a 30-day implementation period for this TS change following issuance.

i 1 i'r0 0 l $

9402160206 940208 PDR ADOCK 05000328 f,

p PDR

&1 j

i i

l i

l.

U.S. Nuclear Regulatory Commission Page 2 February 8, 1994 Please direct questions concerning this issue to K. C. Weller at (615) 843-7527.

Sincerely,

'u Robert A. Fenech Sworn to and subscribed before me this 2.4,A day f S>

1994 nk Notary Public My Commission Expires 77 l

l Enclosures cc (Enclosures):

Mr. D. E. LaBarge, Project Manager U.S. Nuclear Regulatory Commission l

One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 Mr. Michael H. Mobley, Director (w/o Enclosures)

Division of Radiological Health 3rd Floor L & C Annex

)

401 Church Street

]

Nashville, Tennessee 37243-1532 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission-Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711

. -