Text
.
e.
]
i i
l A
i
[
Tennessee Valley Authonty, Post Omce Box 2000. Soddy-Daisy. Tennessee 37379-2000 I
I Robert A. Fenech I
Vice President. Segacyah Nuclear Plant
)
February 8, 1994 TVA-SQN-TS-94-02 10 CFR 50.90 l
U.S. Nuclear Regulatory Commission
+
ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:
l i
In the Matter of
)
Docket No. 50-328 Tennessee Valley Authority
)
SEQUOYAH NUCLEAR PLANT (SQN) - TECHNICAL SPECIFICATION (TS) CHANGE 94-02, "0NE-TIME EXTENSION OF SURVEILLANCE REQUIREMENT (SR) INTERVALS - UNIT 2" i
l In accordance with 10 CFR 50.90, we are' enclosing a requested amendment to License DPR-79 to change the operating license of SON Unit 2.
The proposed change will revise a temporary. license condition that extends certain TS SR intervals to coincide with the Unit 2 Cycle 6 refueling outage. This request increases the extension approved by NRC in a letter j
to TVA dated November 9, 1993, " Issuance of Amendment (TAC No. M87697)
{
(TS 93-12)."
j
(
The proposed operating license change is identified'in Enclosure 1.
The l
justification for the proposed change is provided in Enclosure 2.
A proposed determination of no significant hazards consideration performed pursuant to 10 CFR 50.92 is provided in Enclosure 3.
A listing of SRs to be extended is provided in Enclosure 4.
1 TVA requests NRC approval of this operating license change request by April 1994 to support the extension of SRs that will exceed their l
allowable extension in accordance with TS 4.0.2 and NRC approved Amendment 162 for Unit 2 on April 15, 1994.
TVA requests a 30-day implementation period for this TS change following issuance.
i 1 i'r0 0 l $
9402160206 940208 PDR ADOCK 05000328 f,
p PDR
&1 j
i i
l i
l.
U.S. Nuclear Regulatory Commission Page 2 February 8, 1994 Please direct questions concerning this issue to K. C. Weller at (615) 843-7527.
Sincerely,
'u Robert A. Fenech Sworn to and subscribed before me this 2.4,A day f S>
1994 nk Notary Public My Commission Expires 77 l
l Enclosures cc (Enclosures):
Mr. D. E. LaBarge, Project Manager U.S. Nuclear Regulatory Commission l
One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 Mr. Michael H. Mobley, Director (w/o Enclosures)
Division of Radiological Health 3rd Floor L & C Annex
)
401 Church Street
]
Nashville, Tennessee 37243-1532 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission-Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711
. -