ML20073R425
| ML20073R425 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 06/04/1991 |
| From: | Hopkins J Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20073R426 | List: |
| References | |
| NUDOCS 9106070098 | |
| Download: ML20073R425 (5) | |
Text
-
/p* *t og As y;
L J'f %
UNITED STATES ij NUCLEAR REGULATORY COMMISSION
- ' -$% yj wAsmNGToN. o.C 20%$
s,,
j
....+
TOLEDO EDISON COMPANY CENTERIOR SERVICE COMPANY AND THE CLEVELAND ELECTRIC ILLUMINATING COMPANY DOCKET NO. 50-346 Dg S-BESSE NUCLEAR POWER STATION, UNIT NO. 1
\\MENDMENT TO FAClllTY OPERATING LICENSE Amendment No. 157 License No. NPF-3 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by the Toledo Edison Company, Centerior Service Company, and the Cleveland Electric illuminating Company (the licensees) dated November 30, 1990 as supplemented December 19, 1990 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B,
The facility will operate in conformity with the application, the provisions of the Act, and the ru'es and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of-this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-3 is hereby amended to read as follows:
60{ggy Q@
6 P
- - =
2 (a) Technical Specifications The Technical Specifications contained i:1 Appendix A, as revised through Amendment No.157, are hereby incerporated in the license.
The Toledo Edisen Company shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of its date of issuance and shall be implemented not later than 45 days after issuance.
FOR THE NUC. EAR REGULATORY COMMISSION
/JonB.Hopkins,Sr.ProjectManager Project Directorate 111-3 Division of Reactor Projects lil/IV/V Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of issuance:
June 4, 1991
= -. -.. _ -. -.
4 ATTACFfTfR TO LICLtiSE AMEt,Dt4ENT h0.157 FACILin orERATit:G LICEt;SE NO. NPF-3 M CKET NO. 50-346 Feplace the following page of the Apper.oix A* Technical Specificatiors with the attached page. The revised page is identified by amendnient nuuber und contains verticci lines indicatir.g the area of change. The corresponding overlect page it pttvided to maintain duut.<ent corr.p.eteness.
Pemove Insert 3/4 3-27 3/4 3-27 I
s i
re,.
r--
w w~
- ~
e
,v.~
-r-
.-w w~
~
v---
. ~.- -.
.. _ _ -. - - - - -..- ~_.-.- - --
TABLE 3.3-11 (Continued)
TABLE NOTATION Hay be bypassed when steam pressure is belov 750 psig.
Bypass shall be i
automatically removed when the steam pressure exceeds C00 psig.
The provisions of Specification 3,0.4 are not applicable.
ACTION STATEMENTS ACTION 16 Vith the number of OPERABLE Channels one less than the i
Total Number of Channels, STARTUP and/or POVER OPERATION may proceed until performance of the next required CHANNEL FUNCTIONAL TEST provided the inoperable section of the channel is placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
ACTION 17 Vith the number of OPERABLE Channels one less than the Total Number of Channels, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at ler.st HOT STANDBY vithin the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHOTDOVN vithin the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
DAVIS-BESSE, UNIT 1 3/4 3-27 Amendment No. /}7,Ay/ AGS,157
-