A o-s GENERAL OFFICE g
Nebraska Public Power District
" " "?efeAY!!e"S s's^es*e^ *** '"
io April 29, 1983 Mr. Dominic B. Vassallo, Chief Operating Reactors Branch #2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Subject:
Mark I Containment Program Plant Unique Analysis Report (PUAR)
Reference:
Franklin Research Center Request for Information TER-C5506-316 transmitted to NPPD on October 29, 1982
Dear Mr. Vassallo:
Attached to this letter is a copy of the Plant Unique Wetwell/Drywell Vacuum Breaker Valve Report for CNS.
NPPD committed on December 1, 1982 to provide you with a copy of this report.
This report shows that the vacuum breakers meet the intended design requirements.
Sincerely, 0.WA
/ayM f
J Pilant Division Manager of Licensing and Quality Assurance JMP/TEH/ck Attachment cc: Darrell Eisenhut d
-e 8305030554 830429 PDR ADOCK 05000298 p
EDS NUCLEAR INC.
REPORT APPROVAL COVER SHEET l
i, f
Client: Kaiser Engineers b
l Project: Cooper Nuclear Station Job Number: 0640-003 Report
Title:
Wetwell-Drywell Vacuum Breaker Valves Structural Evaluation I
Repoit Number:
04-0640-0062 Rev.
1 i
ne work described in this Report was performed in accordance with the EDS Nuclear j
Quality Assurance Program. He signatures below verify the accuracy of this Report and its compliance with applicable quality assurance requirements.
tr e
Date: N 82 Prepared By:
1
- 3 Reviewed By:
/
Date:
' Approved By:
Date:
M/A/L 2/. /9A3 i
/
/
1 REVISION RECORD 1
Rev.
Approval i
No.
Prepared Reviewed Approved Date Revision i
4 1
i i
?
i
. y. ',' ?
j
..