ML20073N024
Jump to navigation
Jump to search
| ML20073N024 | |
| Person / Time | |
|---|---|
| Site: | Calvert Cliffs |
| Issue date: | 04/15/1983 |
| From: | Lotito E BALTIMORE GAS & ELECTRIC CO. |
| To: | |
| Shared Package | |
| ML20073M994 | List: |
| References | |
| NUDOCS 8304220358 | |
| Download: ML20073N024 (1) | |
Text
'
OPERATING DATA REPORT DOCKET No. 50-317 DATE 4/15/83 COMPLETED BY Elaine Lotito TELEPl!ONE 301-787-5363 OPE RATING STAT L'S Calvert Cliffs #1 Notes g, g,g gg,.
September 1982 Revision
- 2. Reportmg Period.
- 3. Li:cnsed Thermal Power (Mwil.
- 4. Nameplate Rating (Gr ns MWe):
- 5. Desi;;n Eledries!ILisag INet Mhe):
- 6. Maximum Dependab;e Capacity (Gross MWep:
- 7. 4tasimum Cependable Capacity (Net MWe):
- 8. If Charges Oecer in Capseity Ratings iltems Nunter 3 Thrnugh 7) Since Last Report.Gise Reasons.
- 9. Power Leiel To hhich Re.tri:ted. If Any (Net 4the):
- 10. Ressura For Restricts-<. ll Any:
This Month Yr.to Date Cs.rnablise
- 11. llours in Reporting Period
- 12. Number Of timirs Reactor Was Critien!
- 13. Resercr Res ne Shutdown Haurs
- 14. Hours Generator On Lme
- 15. Unit Resene Shutdown linurs
- 16. Groes Thermal Energy Generated (MWHi
- 17. Gross Eicctrical Energy Generated IMWill
- 18. Net Electrical Energy Centrated (MWHi
- 19. Onst Senice Factor
- 20. Unit Assilability Factor
- 21. Unit Capacit., Facter (Using MDC Neti
- 22. Unit Capacity F.ictor tusing DER Nett
- 23. Unit iorced Outage Rate 0.0 2.1 8.3
- 24. Shutdowns Scheduled 0.cr Sest 6 Montin (Type. Dste.snJ Duration of Eacht.
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Unit:In Test Status (Prior to Commercial Operationi:
Forecast Achieved INITIA L CRITICALITY INITIAL El ECTRICITY COMMERCIAL OPERATION Ohohf7 PDR