THE CINCINNATI GAS & ELECTRIC COMPANY W
Ct NCIN N ATf, OHIO 4 5201 April 12, 1983 L A 80RGMANN
.v..o v.cc m s.o w LOZ-83-0014 Docket No. 50-358 U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137
-Attention:
Mr. J.G. Keppler Regional Administrator Gentlemen:
RE:
WM. H.
ZIMMER NUCLEAR POWER STATION - UNIT 1 10CFR50. 55 (e), ITEM E-16,- GE HFA RELAYS W.O.
57300, JOB E-5590, FILE NO. 956C, E-16 This letter constitutes an interim report concerning the subject condition reported under the requirements of 10CFR50.55(e).
Our last report on this matter was submitted on February 18, 1983.
our last response stated the scope of corrective actions, previously limited to HFA relays manufactured between 1974 and
.1979 (clear or beige bobbins) had been expanded to cover all HFA relays manufactured prior to 1979.
The scope was changed because three (3) cracked coil bobbins were discovered during a re-inspection of a sample of relays manufactured prior to 1974 (black bobbins).
Due to'the change in scope, the corrective actions have been re-evaluated.and revised.
All HFA relays in safety related NSSS systems will be modified by replacing the existing coils with replacement coils made of-Tefzel.
The HFA relays in safety related BOP systems will be re, laced since the manner in which the relay is mounted precludes coil replacement without determinating leads and dismounting the relay.
A Construction Work Authorization Request (CWAR) is being'
~
prepared to perform'the work for each of the proposed corrective actions.
Completion of the replacement of the affected items is contingent upon the HRC's approval of these CWAR's.
A follow-dp report will be submitted on June 30, 1983.
f, B304210369 830412 (pg ggg83
/y PDR ADCCK 05000358 S
+
Mr. J.G.
Keppler Regional Administrator April 12, 1983 LOZ-83-0014 Page 2 We trust the above will be found acceptable as an interim report under 10CFR50.55 (e).
Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY
/
By E.A. BORGMANN SENIOR VICE PRESIDENT RNT/WPC/csc cc:
NRC Office of Inspection & Enforcement Washington, D.C.
20555 NRC Senior Resident Inspector ATTN:
W.F. Christianson NRC Zimmer Project Inspector Region III 4
1 T
e s
e