ML20073L322
| ML20073L322 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 04/30/1991 |
| From: | Parker T, Paustian H NORTHERN STATES POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9105130282 | |
| Download: ML20073L322 (5) | |
Text
_ _ _ - _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -. _ _ _ _ _ _
<$4[
Northem States '.cwer Company 414 Nicollet Malt Minneapoks. Minnesota 55401 1927 Telephone (612) 330-5500 May 7, 1991 Monticello Technical Specifications Section 6.7 A.3 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Monthly Operating Report April. 1991 Attached is the Monthly Operating Report for April, 1991, for the Monticello Nuclear Generating Plant.
//f7W Thomas M Parker Manager Nuclear Support Service TMP/j lk C:
Director, Office of Resource Management Regional Administrator III, NRC NRR Project Manager, NRC NRC Resident Inspector MPCA Attn: J W Ferman Attachment 9105130282 910430 PDR (aDOCK 05000263 g
$b
- I s
OPERATING DATA REPORT DOCKET NO.
50-263 DATE 5-1-91 COMPLETED BY H.
H.
Paustian TELEPHONE 612/295-5151 OPERATING STATUS INotes 1
Monticello 1
1
- 1. Unit Name :
- 2. Reporting period:
APRIL I
- 3. Licensed Thermal Power (MWt):
1670 t
1
- 4. Nameplate Rating (Gross MWe):
569 1
1
- 5. Design Electrical Rating (Net MWe):
545.4 I
I
- 6. Maximum Dependable capacity (Gross MWe):
564 1
1
- 7. Maximum Dependable Capacity (Net MWe):
- 536
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) SInce Last Report, Give Reasons:
9.
Power Level To which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any: __N/A THIS MONTH YR.-TO-DATE CUMULATIVE
- 11. Hours In Reporting Period 719 2879 173856
- 12. Number Of Hours Reactor Was Critical 0.0 1981.7
" 138324.5
~~
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 940.7
- 14. Hours Generator On-Line 0.0 1959.9
---135710.4
~~
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH)
~
0
- 2866989 207109923 0
- 17. Gross Electrical Energy Generated (MWH) -- -1557
~~ 960203 70088763
- 18. Net Electrical Energy Generated (MWH)
~~
0.0%
~~ 917783
- 67025030
- 19. Unit Service Factor 68.1%
-~
78.1%
0.0%
68.1%
78.1%
~~
- 20. Unit Availability Factor
-- -0.4%
59.5%
71.9%
- 21. Unit Capacity Factor (Using MDC Net)
--_ -0.4%
58.4%
70.7%
- 22. Unit capacity Factor (Using DER Net)
- 22. Unit Forced Outage Rate 0.0%
5.0%
4.0%
- 24. Shutdowns Scheduled Over Next 12 Months TType, Date, and Duration of Each)
__ Refueling Outage, April 1, 1991, 56 Days
- 25. If Shut Down At End Of Report Period, Estimated Date Of Startup:May 26, 1991
- 26. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
-NARRATIVE
SUMMARY
OF OPERATING EXPERfENCE
+
DOCKET NO.
50-263 DATE 5-1-91 COMPLETED BY
!!. 11. Paustian TELEPl!ONE 612/295-5151 MONTil APRIL 4-1-91 to Plant shutdown for End-of-Cycle 14 refueling outage.
4-30-91 l
Note:. Power operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance testing.
l' u
AVERAGE DAILY UNIT-' POWER LEVEL
[.
l i
DOCKET NO.
50-263 UNIT Monticello~
DATE-5-1-91 COMPLETED J'
H.
H.
Paustian TELEPH 11 612/295-5151 MONTH APRIL DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL l
(MWe-Net)
(MWe-Net) 1
-6 17 0
-2
-5 18
-3
~
(
3
-3 19
-1 4
-3 20
-1 i
5
-4 21
-3 6
-2 22
-1 7
-3 23
-2 8
-2 24
-2 L
9-
-2 25
-2 10
-2 26
-2 i
11
-2 27
-1 L_
_12
-2 28
-2 L.
[
13-
-2 29
-2 14
-2 30
-2 L
15
-2 31 l.
l 16 -
-INSTRUCTIONS On this format, list th6 average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
I i,
. _ - ~
~
~
UNIT SHlTfD0VNS AND POVER REDUCTION 3 D00TT No. 50-263 INIT NAME l onticello DATE 1 5-01-91
~ REPORT MON 111 April
[62/ 5-515$
No.
Date Type Duration Reason Method LER System Comp.
Cause & Corrective (1)
(hours)
(2) of No.
Code Code Action to i
Shutdown (4)
(5)
Prevent Recurrence (3) 3 04-01-91 S
719.0 C
1 N/A Plant shutdown for 1991 (EOC14) r 21ing outage i
I 1
2 3
4 F: Forced Reason:
Method:
Draft IEEE Standard S: Scheduled A-Equipment Failure (Explain) 1-Manual 805-1984(P805-DS)
B-Maintenance or Test 2-Manual Scram C-Refueling 3 Automatic Scram 5
D-lator Restriction 4-Other (Explain)
IEEE Standard 803A-1983 E
rator Training & License Examination F-inistrative G-Operational Error (Explain)
H-Other (Exnlain)
-