ML20073K475
| ML20073K475 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 10/03/1994 |
| From: | Wadley M NORTHERN STATES POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20073K479 | List: |
| References | |
| NUDOCS 9410110251 | |
| Download: ML20073K475 (2) | |
Text
'
Northern States Power Company Prairie Island Nuclear Generating Plant 1717 Wakonade Dr. East Welch, Minnesota 55089 October 3, 1994 10 CFR Part 50 Section 50.90 U S Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 License Amendment Request Dated October 3, 1994 Emernency Diesel Generator Testing Reauirements Attached is a request for a change to the Technical Specifications, Appendix A of the Operating Licenses, for Prairie Island Nuclear Generating Plant, Units 1 and 2.
This request is submitted in accordance with the provisions of 10 CFR Part 50, Section 50.90.
The main purpose of this License Amendment Request is to provide a wider band during the 24-hour load test which is performed every 18 months. The specification currently calls for a 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> run at 105 - 110% of the continuous load rating of the diesel generator.
This range is too narrow when we consider the potential instrument error and the inherent load swings associated with running the diesel generator connected to the system grid.
The proposed specification provides a range of an indicated load of 103 - 110%
of the continuous rating.
Exhibit A contains a description of the proposed changes, the reasons for requesting the changes and the supporting safety evaluation /significant hazards determination.
Exhibit B contains pages of the Prairie Island Technical Specifications rev1 sed to show the proposed changes.
Exhibit C contains the revised Technical Specifications pages.
l o7 6
1.iF'v'u, 9410110251 941003 l f1 PDR ADOCK 0500028,,
PDR p
i t
i
r T
=,
4 4
- USNRC Page 2 of 2 October 3, 1994 Please contact Jack Leveille (612-388-1121, Ext. 4662) if you have any questions concerning this License Amendment Request.
/'lk <C sa b (Gh4 he m
Michael D Wadley Site General Manag r Prairie Island Nuclear Generating Plant c: Regional Administrator - Region III, NRC NRR Proj ect Manager, NRC Senior Resident Inspector, NRC State of Minnesota Attn: Kris Sanda J E Silberg Attachments:
Affidavit Exhibit A -
Evaluation of the Proposed Changes to the Technical Specifications Exhibit B -
Proposed Changes Marked Up on Existing Technical Specifications Pages Exhibit C -
Revised Technical Specifications Pages p
p L-