Amends 198 & 175 to Licenses DPR-53 & DPR-69,respectively, Revising TS Re Surveillance Requirements Associated W/Edg
ML20073K222
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 09/27/1994
From: Michael Case
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20073K226 List:
References
NUDOCS 9410110098
Download: ML20073K222 (11)


Text

__

ps acoqk UNITED STATES

., v

[d Jif., j D

NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. N0001 s y..... /

BALTIMORE GAS AND ELECTRIC COMPANY DOCKET NO. 50-317 CALVERT CLIFFS NUCLEAR POWER PLANT UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 198 License No. DPR-53 1.

The Nuclear Regulatory Comission (the Commission) has found that:

A.

The application for amendment by Baltimore Gas and Electric Company (the licensee) dated November 2,1993, as supplemented on June 22, 1994, complies with the standards and requirements of the Atomic.

Energy Act of 1954, as amended (the Act) and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the '

Comission; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraoh 2.C.2. of Facility Operating License No. DPR-53 is hereby amended to read as follows:

9410110098 940927 DR ADOCK 050003 7

i l,

l 2.

Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 198, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance and shall be implemented within 30 days.

FOR THE NUCLEAR REGULATORY COMMISSION W

Michael J. Case, Acting Director Project Directorate I-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation I

Attachment:

Changes to the Technical Specifications Date of Issuance:

September 27, 1994 i

i I

i l

l

  1. MC y

. k UNITED STATES l

,j NUCLEAR REGULATORY COMMISSION WASHINGTON. D.C. 20655-0001 4

0 9....

4 BALTIM0RE GAS AND ELECTRIC COMPANY DOCKET NO. 50-318 CALVERT CLIFFS NUCLEAR POWER PLANT. UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.175 License No. DPR-69 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment by Baltimore Gas and Electric Company (the licensee) dated November 2,1993, as supp1mented on June 22, 1994, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.2. of Facility Operating License No. DPR-69 is hereby amended to read as follows:

4,

2.

Technical Soecifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.175, are hereby incorporated in the license. The i

licensee shall operate the facility in accordance with the Technical i

Specifications.

3.

This license amendment is effective as of the date of its issuance and i

shall be implemented within 30 days.

r FOR THE NUCLEAR REGULATORY COMMISSION l

Michael J. Case, Acting Director

!~

Project Directorate I-l Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation l

Attachment:

i Changes to the Technical Specifications Date of Issuance:

September 27, 1994 l

I i

l l

1

i ATTACHMENT TO LICENSE AMENDMENTS i

AMENDMENT NO. 198 FACILITY OPERATING LICENSE NO. DPR,

AMENDMENT NO. 175 FACILITY OPERATING LICENSE NO. DPR-69 i

DOCKET NOS. 50-317 AND 50-318 l

Revise Appendix A as follows:

Remove Paaes Insert Paaes 3/4 8-4

'3/4 8-4 3/4 8-5 3/4 8-5 3/4 8-8 3/4 8-8 i

I i

  • Pages that did not change, but are overleaf.

i l

J I

3/4.8 ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) 2.

For the 69 kV SMECO offsite power circuit, within one hour of substitution for a 500 kV offsite power circuit, and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter during use by verifying correct breaker alignments and indicated power availability; and b.

Demonstrated CPERABLE at least once per REFUELING INTERVAL during shutdown by manually transferring unit power supply from the non..el circuit to the alternate circuit.

4.E.1.1.2 Each diesel generator shall be demonstrated OPERABLE:

a.

At least once per 31 days on a STAGGERED TEST BASIS by:

1.

Verifying the fuel level in the day fuel tank.

2.

Verifying the fuel level in the fuel storage tank.

3.

Verifying the fuel transfer pump can be started and transfers fuel from the storage system to the day tank.

4.

Verifying the diesel starts and achieves a generator voltage and frequency,of 4160 + 420 volts and 60 + 1.2 Hz, respectively.

5.

Verifying the generator is synchronized, loaded to 11250 kW, and operates for 1 60 minutes.

6.

Verifying the diesel generator is aligned to provide standby power to the associated emergency busses.

7.

Verifying that the automatic load sequencer timer is OPERABLE with the interval between each load block within i 10% of its design interval.

b.

At least once per 92 days by verifying that a sample of diesel fuel from the fuel storage tank is within the acceptable limits specified in Table 1 of ASTM D975-81 when checked for viscosity, water and sediment.

All engine starts for the purpose of this Surveillance Requirement may be preceded by an engine prelube period and/or other warmup procedures recomended by the manufacturer so that mechanical wear and stress on the diesel engine is minimized.

CALVERT CLIFFS - UNIT 1 3/4 8-4 Amendment No. 198

b 3/4.8 ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) 2.

For the 69 kV SMECO offsite power circuit, within one hour of substitution for a 500 kV offsite power circuit, and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter during use by verifying correct breaker alignments and indicated power availability; and i

b.

Demonstrated OPERABLE at least once per REFUELING INTERVAL during shutdown by manually transferring unit power supply from the nomal circuit to the alternate circuit.

3 i

4.8.1.1.2 Each diesel generator shall be demonstrated OPERABLE:

a.

At least once per 31 days on a STAGGERED TEST BASIS by:

1.

Verifying the fuel level in the day fuel tank.

2.

Verifying the fuel level in the fuel storage tank.

j 3.

Verifying the fuel transfer pump can be started and transfers fuel from the storage :ystem to the day tank.

4 4.

Verifying the diesel starts and achieves a generator voltage and frequency,of 4160 1 420 volts and 6011.2 Hz, 4

respectively.

5.

Verifying the generator is synchronized, loaded to 21250 kW, and operates for 1 60 minutes.

6.

Verifying the diesel generator is aligned to provide standby power to the associated emergency busses.

7.

Verifying that the automatic load sequencer timer is OPERABLE with the interval between each load block within i 10% of its design interval.

b.

At least once per 92 days by verif;ing that a sample of diesel fuel from the fuel storage tank is within the acceptable limits specified in Table 1 of ASTM D975-81 when checked for viscosity, water and sediment.

All engine starts for the purpose of this Surveillance Requirement may be preceded by an engine prelube period and/or other wamup procedures recommended by the manufacturer so that mechanical wear and stress on the diesel engine is minimized.

CALVERT CLIFFS - UNIT 2 3/4 8-4 Amendment No. 175

3/4.8 ELECTRICAL POWER SYSTEMS SURVEIll ANCE REQUIREMElTS (Continued) c.

At least once per 184 days by verifying the diesel starts from ambient condition and accelerates to at least 900 rpm in 5 10 seconds.

l d.

At least once per REFUELING INTERVAL by:

l 1.

Subjecting the diesel to an inspection in accordance with procedures prepared in conjunction with its manufacturer's recomendations for this class of standby service.

2.

Verifying the generator capability to reject a load of 2 500 hp without tripping.

3.

Simulating a loss of offsite power in conjunction with a safety injection actuation test signal, and:

a) Verifying de-energization of the emergency busses and load shedding from the emergency busses.

b) Verifying the diesel starts from ambient condition on the auto-start signal, energizes the emergency busses with pennanently connected loads, energizes the auto-connected emergency loads through the load sequencer and operates for 15 minutes while its generator is-loaded with the emergency loads.*

l c) Verifying that the high jacket coolant temperature and low Jacket coolant pressure trips are automatically bypassed on a Safety Ir.jection Actuation Signal.

j 4.

Verifying the diesel generator operates for 160 minutes while loaded to 1 2500 kW.

5.

Verifying that the auto-connected loads to each diesel generator do not exceed the 2000 hour0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> rating of each diesel generator.

All engine starts for the purpose of this Surveillance Requirement may be preceded by an engine pre-lube period recommended by the manufacturer so that mechanical wear and stress on the diesel engine is minimized.

CALVERT CLIFFS - UNIT 1 3/4 8-5 Amendment No. 198

j.-

j 3/4.8 ELECTRICAL POWER SYSTEMS i

SURVEILLANCE REQUIREMENTS (Continued) l c.

At least once per 184 days by verifying the diesel starts from 510 seconds.} ion and accelerates to at least 900 rpm in l

ambient condi j

d.

At least once per REFUELING INTERVAL by:

l 1.

Subjecting the diesel to an inspection in accordance with procedures prepared in conjunction with its manufacturer's recommendations for this class of standby service.

2.

Verifying the generator capability to reject a load of 1 500 hp without tripping.

3.

Simulating a loss of offsite power in conjunction with a safety injection actuation test signal, and:

a) Verifying de-energization of the emergency busses and load shedding from the emergency busses.

b) Verifying the diesel starts from ambient condition on the auto-start signal, energizes the emergency busses with' pennanently connected loads, energizes the auto-connected emergency loads through.the load sequencer and operates for 2 5 minutes while its generator is loaded with the emergency loads.*

l c) Verifying that the high jacket coolant temperature and low jacket coolant pressure trips are automatically bypassed on a Safety Injection Actuation Signal.

4.

Verifying the diesel generator operates for t 60 minutes while loaded to 2 2500 kW.

5.

Verifying that the auto-connected loads to each diesel generator do not exceed the 2000 hour0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> rating of each diesel generator.

All engine starts for the purpose of this Surveillance Requirement may be preceded by an engine pre-lube period recommended by the manufacturer so that mechanical wear and stress on the diesel engine is minimized.

CALVERT CLIFFS - UNIT 2 3/4 8-5 Amendment No. 175

3/4.8 ELECTRICAL POWER SYSTEMS i

LIMITING CONDITION FOR OPERATION (Continued) l c.

With No.11 Fuel Oil Storage Tank inoperable, demonstrate the OPERABILITY of No. 21 Fuel Oil Storage Tank by:

1) perfonning Surveillance Requirement 4.8.1.1.2.a.2 (verifying 74,000 gallons) within I hour; and 2) verifying the flow path from No. 21 Fuel Oil Storage Tank to the diesel generator within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

d.

With No. 21 Fuel Oil Storage Tank inoperable, restore No. 21 Fuel Oil Storage Tank to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or suspend all operations involving CORE ALTERATIONS, positive reactivity j

changes, movement of irradiated fuel and movement of heavy loads over irradiated fuel.

SURVEILLANCE REQUIREMENTS 4.8.1.2 The above required A.C. electrical power sources shall be demonstrated OPERABLE by the performance of each of the Surveillance Requirements of 4.8.1.1.1 and 4.8.1.1.2 except for Requirements 4.8.1.1.2.a.5, 4.8.1.1.2.a.7, 4.8.1.1.2.d.3, and 4.8.1.1.2.d.5.

CALVERT CLIFFS - UNIT 1 3/4 8-8 Amendment No. 198

3/4.8 ELECTRICAL POWER SYSTEMS LIMITING CONDITION FOR OPERATION (Continued) c.

With No.11 Fuel Oil Storage Tank inoperable, demonstrate the OPERABILITY of No. 21 Fuel Oil Storage Tank by:

1) performing Surveillance Requirement 4.8.1.1.2.a.2 (verifying 74,000 gallons) within I hour; and 2) verifying the flow path from No. 21 Fuel Oil Storage Tank to the diesel generator within I hour.

d.

With No. 21 Fuel Oil Storage Tank inoperable, restore No. 21 Fuel Oil Storage Tank to 0PERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or suspend all operations involving CORE ALTERATIONS, positive reactivity changes, movement of irradiated fuel and movement of heavy loads over irradiated fuel.

l l

SURVEILLANCE REQUIREMENTS 4.8.1.2 The above required A.C. electrical power sources shall be demonstrated OPERABLE by the performance of each of the Surveillance Requirements of 4.8.1.1.1 and 4.8.1.1.2 except for Requirements 4.8.1.1.2.a.5, 4.8.1.1.2.a.7, 4.8.1.1.2.d.3, and 4.8.1.1.2.d.5.

i l

l CALVERT CLIFFS - UNIT 2 3/4 8-8 Amendment No. 175 1

-