,42 ocLARoNoe srneEr POWER & LIGHT P. O BOX 6008
- NEW ORLEANS. LOUISIANA 70174 * (504) 366 2345 UE2iS$EsE L V. MAURIN April 11, 1983 Vice President Nuclear Operabons W3I83-0117
[
Q-3-A35.07.66 Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000
- \\\\
APR I 51983
) Nub i r\\ -
Arlington, Texas 76012
~~
SUBJECT:
Waterford SES Unit No. 3 I
Docket No. 50-382 Significant Construction Deficiency Report No. 66
" Defective G.E. Type AKR Breakers, C-Clips Fall Of f" Second Interim Report
Reference:
LP&L Letter W3I82-0109 from L. V. Maurin to J. T. Collins dated November 19, 1982
Dear Mr. Collins:
At the present time, materials needed to complete the corrective action will not be shipped from the vendor until late April,1983. A final report will therefore be delayed until June 30, 1983.
Very truly yours, g_
~
t/- 7 san.
L. V. Maurin LVM/ MAL /gf cc: 1) Director 3)
Mr. E. L. Blake Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555
- 2) Director 4)
Mr. W. M. Stevenson Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 8304190498 G3041i gDRADOCK 05000382 PDR
L
.4y
,o ' '
b EBASCO SERVICES INCORPORATED EBoSCO P. O. Box 70 Killona, Louisiana 70066-0070 W3QA-24045 April 7, 1983 Mr. R. W. Prados Louisiane Power & Light Company.
Nuclear Support Group Gretna Greens LOUISIANA POWER & LIGHT COMPAhT WATERFORD STEAM ELECTRIC STATION 1983 - 1165 MW INSTALLATION - UNIT NO. 3 SIGNIFICANT CONSTRUCTION DEFICIENCY NO. 66
" DEFECTIVE G. E. TYPE AKR BREAKERS, C-CLIPS FALL OFF"
Reference:
LP&L letter no. W3183-0109, dated November 19,-1982
Dear Mr.-Prados:
The above referenced letter indicated submittal of a Final Report to the USNRC no later than April 11, 1983.
At the present time, materials needed to-complete corrective action will not be shipped until late April, 1983. Additionally, this SCD can only be worked when a time slot is available during testing operations. It is our recommendation that LP&L give this SCD the utmost priority in expediting the completion of the corrective action prior to fuel load. As the attached
. schedule indicates, Construction and Scheduling anticipates the completion 'of corrective' action on June 15, 1983.
Unless -the present schedule is prioritized, Ebasco Quality Assurance needs an extension until June 30, 1983 for submittal of a Final Report by LP&L to the USNRC.
Very truly yours,
)')
I b
.\\ p [F L.'A.,$tinson) Program anager Site Quality LAS:JP:jmd Attachment - Rev. (0) i
--