JOSEPH H. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS MARCH, 1983 The Unit 1 Cycle 4 - Cycle 5 refueling outage continued into the month of 'a rch. On March 30, 1983 the unit returned to service. At 1615 on 3/31/83, following a load rejection of forty-five megawatts, the pressurizer pressure increased to approximately 2280 psig resulting in a challenge to the pressurizer PORVs. The PORVs opened and following the decrease in pressure, the PORVs re-turned to the closed position.

The following safety-related maintenance was performed in the month of March:

1. Performed miscellaneous maintenance on diesel generators.
2. Repaired containment personnel hatch doors.
3. Repacked #6 River Water pump.
4. Repaired leaks on Pressurizer PORV block valves V027A and V027B.
5. Replaced electrical penetration Q1T52B020 module D.
6. Repaired Pressurizer PORV PCV 444B limit switch actuator arm.
7. Reinstalled snubbers following completion of hydraulic snubber functional tests.

i 1

8304190302 830413 PDR ADOCK 05000348 R pm

&-- g-y y?--- +y w- T- e - - - y WP-' ~d ==- =-- 7 r--- - ' " -$" --

7 t.

OPERATING DATA REPORT DOCKET NO. 50-348 DATE 4/04/83 COMPLETED BY y. G. Hairston, III TELEPHONE (205)S99-5156 r OPERATING STATUS

^

Joseph M. Farley - Unit 1 Notes

1. Unit Name:
2. Reporting Period: Ifech , 1ont I) Cumulative data since 76s9 12/01/77, date'of
3. Licensed Thermal Power (MWt): commercial operatiop.
4. Nameplate Rating (Gross MWe): 860
5. Design Electrical Rating (Net MWe): 829
6. Maximum Dependable Capacity (Gross MWe):

844.6

7. Maximum Dependable Capacity (Net MWe): An t n
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

9. Power Level To Which Restricted,If Any (Net MWe): N/A
10. Reasons For Restrictions.lf Any: N/A ,

This Month Yr.-to-Date Cumulative

- 11. Hours In Reporting Peried 744 2160 46.728

12. Number Of Hours Reactor Was Critical 89.8 422.3 28,569.8 0 0 3,614.5
13. Reactor Reserve Shutdown Hours an 4 tA?.o 27,631.1
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 33.094 827.792 69.317,841
17. Gross Electrical Energy Generated (MWH) 8,960 262,054 22,035,602

-3,480 226,498 20,666,718

18. Net Electrical Energy Generated (MWH)
19. Unit Service Facter A 1 in a 59.1
20. Unit Availability Factor 4.1 16 g 59.1
21. Unit Capacity Factor (Using MDC Net) -0.6 13.0 ss n
22. Unit Capacity Factor (Using DER Net) -0.6 12.6 st4
23. Unit Forced Outage Rate 0.0 0.0 18.0 l
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each1:

N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved l- INITIAL CRITICALITY R /n6 /77 R/no/77 INITIAL ELECTRirtTY 8/20/77 8/18/77 COMMERCIAL OPdRATION 12/01/?7 ~ 12/01/77 i

(4/77)

[

r

- - -, .. . , ~ . _ _ . _ _ . _ _ _ _ _ , _ _ . , _ _ _ , _ _ , _ _ . __ _ _ _ _

DOC 12T NO. 50-348 UNIT I DATE 4/04/83 C05tPLETED SY W.G.Hairston. III TELEPHONE /9nu noo M1;A i

Flarch 3!0tml DAY AVERACE DAILY F0WER LEVEL DAY AVERACE DAILY POWER LEVEL (AlWe Net) (SIWE Net) 1 n 17 n 0 jg 0 2

3 0 gg o 4 n 20 0 5 0 21 0 6 n n n 7 _

0 B 0

-8 0 24 n 3 0 9 0 10 0 26 0 1I n 27 n 0 3 0 12 13 0 m n 22 14 0 30 is 0 31 286 16 n

!?tSTRUGONS On tiiis fortn::. list the svens: daily unit power levet in MWe Net for e:ch d:y in the reporting rnunth. Compute tv

, the neare:t whole me;swatt.

(9(77)

DOCKET NO. S'0-348 UNIT Sil01 DOWNS AND POWER REDUC 110NS UNIT NAhlE J. M. Farley - Unit 1 DA1E 4/04/83 COMPl.ETED BY W.G. Hairston, III NEPORT Af0NTil March TEl.LPIIONE .(205) 899-5156 i

t #<.

. N **

c rs 3 se .~. , , 5

~~. .E _e 8 g s *g Licensee Sv. c Cause & Cossective No. Date g gg g ,3 g 5 Event E? E.i

'8 Action to

" $3 5 Report , AG u jijg ,

Pscvent Recussence 6

012 830301 S 713.6 C 3 N/A N/A N/A The Unit 1 Cycle 4 - Cycle 5 refueling- ,

outage continued from 2/28/83.

i i

i i

t 1

1 2 3 4 F: Forced Reason: hiethod:

S: Stheduled Exhibit G -Instructions A Equipsnent Failure (Explain) 1 Manual for Pseparation of Data ti. Maintenance of Test 2 Manual Scram. Entsy Sheels for 1.icensee C Refueling 3. Automatic Sciasu. Frens Repius (1.ER) File iNURl!G-D Regulaimy Rest:iction 4-Othes (Exphio) 0161)

E-Opesaior Tsaining & l.icense Examination F Adminisisative 5

! G Ope ational Essus (linplain) Estabit 1 Same Source 3

(9/77) 11 Othes (E xplain)

.I JOSEPH'M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS MARCH, 1983 The Unit 1 Cycle 4 - Cycle 5 refueling outage continued into the month of March. On March 30, 1983 the unit returned to service. At 1615 on 3/31/83, following a load rejection of forty-five megawatts, the pressurizer pressure increased to approximately 2280 psig resulting in a challenge to the pressurizer PORVs. The PORVs opened and following the decrease in pressure, the PORVs re-turned to the closed position.

The following safety-related maintenance was performed in the month of March:

1. Performed miscellaneous maintenance on diesel generators.
2. Repaired containment personnel hatch doors.
3. Repacked #6 River Water pump.
4. Repaired leaks on Pressurizer PORV block valves V027A and V027B.
5. Replaced electrical penetration Q1T52B020 module D.
6. Repaired Pressurizer PORV PCV 444B limit switch actuator arm.
7. Reinstalled snubbers following completion of hydraulic snubber functional tests.

~

i D

OPERATING DATA REPORT DOCKET NO. 50-348 DATE 4/04/83 COMPLETED nr W. G.11airston, II:

TELEPHONE (205)S99-5156 OPERATING STATUS Note 5

1. Unit Name: J s,eph H. Farley - Unit 1
1) Cumulative data since
2. Reporting Period: F-h . 1agg 12/01/77, date'of

?g39

3. Licensed Thermal Power (MW:): commercial operatiitn.
4. Nameplate Rating (Gross MWe): 860
5. Design Electrical Rating (Net MWe):

829 i

844.6

) 6. Maximum Dependable Capacity (Gross MWe):

nn,A

7. Maximum Dependable Capacity (Net MWe):
8. If Channes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

9. Power Level To Which Restricted If Any (Net MWe):

N/A 4 10. Reasons For Restrictions,If Any: N /A r

This Month Yr. to-Date Cumulatise

! 744 2160 46.728 11.- Hours in Reporting Period 89.8 422.3 28,569.8

12. Number Of Hours Reactor Was Critical 3,614.5 0 0

! 13. Reactor Reserve Shutdown Hours 27, m .1

14. Hours Generator On Line an_a qA9.o 0 0 0
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) . 33.094 827.792 69.317.841 8,960 262,054 22,035,602 l 17. Gross Electrical Energy Generated (MWH) 20,666,718

.18. Net Electrical Energy Generated (MWH)

-3,480 _226,498 A i ic n 59.1

19. Unit Senice Factor - 59.1 4.1 16,g
20. Unit Availability Factee

-0.6 13.0 ss n

21. Unit Capacity Factor (Using MDC Net)

-0.6 12.6 s'h 4

22. Unit Capacity Factor (Using DER Net) 0.0 0.0 18.0

~ 23. Unit Forced Outage Rate

24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each t: ,

N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup: _

N/A

26. Units in Test Status (Prior to Commercia! Operation): Forecast Achieved

(

INITIAL CRITICALITY R /nA /77 A /no /77 l

INITIAL ELECTRICITY 8/20/77 8/18/77 I-12/01/77 12/01/77 COMMERCIAL OPERATION (4/771

- DOCKET NO. 50-348 UNIT I DATI 4/04/83 COStPLETED BY W.C.Hairston. III TELEPHONE Mnn noo st st diarch MONTil DAY AVERACE DAILY POWER LEVEL DAY AYERACE DAILY POWER LEVEL (MWe Net) , (MWe Net) n 17 n .

I 0 g3 0 2

0 19 0 3

n 20 0 4

0 21 0 5

6 n 22 , g 0 B 0 1

0 24 o 3

n 3- 0 9

10 0 26 0

!! n 27 n-0 ;3 0 12 0 ;9 n 13 22 14 0 ., 30 -

IS 0 3g 286 16 0 1

INSTRUGONS On t!iis form:r. list the. sven;: daily unit power levelin MWe-Net for e:ch d:y in the reporting snunth. Compute to

, the neare:t whole rne;2 watt.

(9G7) 9y e- - ..-----

.-9 -.-, -ww,y- -

,n-,,w--w-- y..*---w--e- - - ,-- vm-m-=

4 -

s DOCEET NO. S'0-348 UNIT SHUTDOWNS AND POWER REDUCDONS UNIT NAME J. M. Farley - Unit 1 DATE 4/04/83 REPORT MONTil March COMPLETED BY _V.C. Hairston, III TELLPilONE _(205) 899-5156 c r. 3E LI"5#C E

No. Dale E. 'S _$ 5 3 53 Event

$v $4 Cause & Connective s 0$ 0 5gx 9,7 gOg 4c,;o, ,,

0- E j i3 j RCPull # sea u o 'Ps vent Recussence l

U 6

012 830301 S 713.6 C 3 N/A N/A N/A The Unit 1 Cycle 4 - Cycle 5 refueling outage continued from 2/28/83.

1 I 2 3 4 F: Forced Reason: Method:

S: Scheduled Exhibit G -Instructiims A Equipment Failure (Explain) 1 Manual for Psepasation of Dai.i 11 Maintenance of Test 2-Manual Scram. Ent y Sheets for tiensee C-Refuchng 3- Automatic Scram. Event Repin 11.ER) File (NURI:G- '