VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 83-03 i
' FOR THE MONTH OF MARCH,1983 1
4 i
I 1
i i
1
)
i.
L i
i -
i-i t-4 i
8304190272 830414 i
. PDR-ADOCK 05000271 i-
. R PDR 4
!s.
, re
,v -- venr,--
ses,-r-,,,,
m,>.,-,e nn~...,s,.n,- -.. -..,. _ -,,,, _ _.,
w.
e---
h
^
OPERATING DATA REPORT' DOCKET No.
50-271 DATE 830409 COMPLETED BY F.J.: Burger TELEPHONE: 802/257-7711 Ext.-136 OPERATING STATUS :
Notes
- 1. Unit Name:
Vermont Yankee 2.~Raporting' Period:
March
-3. Lic'ensed Thermal Power (MWt):
1593 4.. Nameplate Rating (Gross'MWe):
2540 15.fD: sign ElectricalLRating(Net MWe):514(oc) 504(cc)'
6.LMaximum Dependable. Capacity (Gross MWe):
535
- 17. Maximum. Depend'able Capacity (Net MWe):
1504 L8.JIf-Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons:
N/A'
- 19. Power Level:to Which Restricted,If Any(Net MWe):
N/A' 10.~ Rsasons For-Restrictions,1If Any:
N/A This Month Yr-to-Date Cumulative-ll.? Hours In Reporting Period 744.00 2,160.00
~
- 12. Number Of Hours Reactor Was Critical 96.06 1,471.42 75,014.41
-130 Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours' Generator:On-Line 96.00 1.459.20 72.878.89 15.-UnitJReserve Shutdown Hours 0.00 0.03 0.00
- 16. Gross Thermal Energy Generated (MWH) 119,971.00' 1,989,956.50 105,029,199.00
'17. ' Gross Electrical ' Energy Generated (MWH) 39,962.00 666,902.00 34,928,049.00
.10.-Net Electrical Energy Generated (MWH) 38,085.00 637,364.00 33,127,905.00
- 19. Unit Service-Factor 12.90 67.56 78.99
- 20. Unit Availability Factor 12.90
- 67.56~
78.99
- 21. Unit Capacity Factor (Using-MDC Net) 10.16 58.55_
71.24 c22.-Unit Capacity Factor (Using DER Net) 9.96 57.41 69.86
- 23. Unit Forced Outage Rate 0.00 3.49 6.30
- 24. Shutdowns -Scheduled over Next 6 Months (Type, Date, and Duration of Each):
- Refueling outage in progress
=25.' If Shut Down At End Of Report Period, Estimated Date of Startup:
May 30,1983
-26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION b
r;;
1
{,;
r AVERAGE ~ DAILY UNIT POWER LEVEL DOCKET NO. '50-271 UNIT- -Vermont Yankee DATE 830409 COMPLETED-BY.
F.J. Burger TELEPHONE-802/257-7711 Ext. - 136-
~ MONTH March DAY-AVERAGE-DAILY POWER LEVEL
. DAY, AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net)~
-1.
406~
17.
O 2..
18.
~0
'405 23.
404 19.
0 4.
-371
-20.
0
'5.-
0 21.
0
-6.
0 22.
0 7.
-0 23.
0 8.
0-2 4.,
0 9.
0 25.
0
' 10.
~0 26.
0
- 11..
0 27.
0 12..
0 28.
0
-13.
0 29.
0 14.
0 30.
O 15.
0 31.
0 16.
0 l-
' INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
I
'e UNIT SilUTDOWNS AND P'0WER REDUCTIONS '
D'OCKET NO.
50-271 UNIT NAME~
Vermont Yankee DATE 830409 REPORT MONTil' March COMPLETED BY-F.J.-Burger-
- TELEP110NE 802/257-7711 Ext. 136 I
E H
cn m Su u
Cause & Corrective
'OO dO License p.
@c No.
Date m
c Action to E.
$S S
3 II E Event' 3.$
88 05 E-fi.E 8 Report # 18-Re Prevent Recurrence C5 M
Gb V3 v1 O
E g
a 8
83-04 830305 S
648
-C 3
N/A N/A N/A' Shutdown for.1983 Refueling Outage.
I l
)
i i
F: Forced Reason:
Method:
Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual-for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets.for Licensee C-Refueling 3-Automatic Scram Event Report -(LER) File D-Regulatory Restriction 4-Other (Explain):
'(NUREC 0161)
E-Operator Training & License Examintition -
5 F-Adminis t ra tive Exhibit I - Same' Source C-Operational Error (Explain)-
II-Other-(Explain)-
7/80
m 50-271' DOCKET NO.
UNIT
~ Vermont Yankee DATE 830409 COMPLETED'BY F.J. Burger 802/257-7711' Ext. 136 TELEPHONE SAFETY RELATED MAINTENANCE Page 1 of 2 NATURE OF LER OR OUTAGE M M CT W EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION
' RCIC Valve V 13-21 Corrective N/A Worn Parts Seat Leakage Lapped Seat MR 82-0511 RCIC Valve'V13-20 Corrective N/A Worn Parts Seat Leakage Replaced Seal Ring MR 82-0539 l
RCIC Valve V13-30 Corrective N/A Worn Parts
' Seat Leakage Ground Disk MR 82-0545 RHR Service Water Corrective N/A Worn Motor-to-High Vibration Repaired Coupling Pump P8-1B MR 82-1281 Pump Coupling HCU's 06-27, 14-23 and Corrective N/A Worn Parts Air Leakage Replaced Tubing 18-23 Air Supply Tubing MR 82-1381 I to the Scram Valves MR 32-1442 HCU 26-23 Scram Solenoids Corrective N/A Worn Parts Valve Chatter Rebuilt Solenoids and and Pilot Valves MR 83-0119 Pilot Valves "B" Main Steam Drawer (RPS)
Corrective N/A Worn Parts Shorted Replaced Potentiometer Trip Potentiometer MR 83-0296 Potentiometer HCU 10-19 113 Valve Corrective N/A Worn Parts Seat Leakage Rebuilt Valve MR 83-0340 PCAC Valve V16-19-9 Corrective N/A Valved Used as A Valve Out.of Replaced Parts as 3
MR 83-0396 Welding Ground Corrnission
'Necessary "A" Diesel Generator Air Corrective N/A Wear / Vibration Air Leakage Replaced Tubing Compressor Unloader Supply MR 83-0402 Tubing
3 l
DOCKET NO.
50-271 UNIT Vermont Yankee DATE 830409 COMPLETED BY F.J. Burger TELEPHONE 802/257-7711 Ext. 136 SAFETY RELATED MAINTENANCE Page 2 of 2 NATURE OF LER OR OUTAGE MALFUNCTION EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION Cooling Water Check Valve Corrective N/A Wear Valve Chatter Lapped Seats 138 on Various HCU's MR 83-0409 Feed Water' Check Valve Corrective LER 83-10/3L Seat Seal Leakage Replaced Seat Resilient V2-96A FR 83-0411 Failure Seal Reactor Recire. Discharge Preventive N/A Environment Corroded Limit Replaced Terminals and Valvas V2-53A&B FR 83-0434 Switch Contacts Cleaned Contacts-
pl 3
F.
- y *. '
DOCKET NO.
50-271 UNIT Vermont Yankee
'DATE.
830409 COMPLETED BY F.J.' Burger TELEPHONE _ 802/257-7711 Ext.-136
' REPORT MONTH March' SU> DIARY OF OPERATING EXPERIENCES Highlights Vermont Yankee operated at 10.12% of rated thermal power for the month.
Gross electrical generation was 39,962 FMI, or 9.94% of design electrical capacity.
Operating Summary
,The following is a chronological description of plant' operations including other pertinent items of interest for the month:
At the beginning.of the. reporting period the plant was operating at
-80% of. rated thermal power. The coastdown toward the refueling outage was in progress.
830304 -At.2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br />,'a' shutdown was initiated for the refueling outage.
~830305 'At 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> the turbine generator was removed from the grid.
s 830305 At 0004 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> the reactor automatically scrammed.
At the end of'the reporting period, the plant was in cold shutdown and the refuel outage in progress.